Bill of Quantity Work : “Replacement of Old H.T. Switchgears at 4 No. Sub Station by new H.T. witchgears along with replacement of allied H.T. cables to Transformers”. NIT No. KoPT/KDS/Mech/SE-I/ADV/317 Item No. 1. 2. 3. 4a. Description Qty. Unit Supply & Delivery of H.T. Panel consists of following Incomer : 630A VCB -- 01 No. Outgoing Feeder : 630A VCB – 11 Nos. With suitable C.T. & P.T., necessary LED indication lamps, Intelligent Panel Meter, O/C & E/F Relay with Instantaneous mode (Micro processor based) is to provided at Incomer & Outgoing Feeders. Busbar : For 3 Phage and Earth Bus Bar with suitable size. Necessary suitable arrangement for termination of Incoming & Outgoing cables to be provided. Installation, Testing and Commissioning of above mentioned [Item No. 1] panel including double earthing arrangement by 50 mm x 6 mm galvanized (Hot Dip) steel strip with suitable length. Supply and delivery of 3C x 120 sq. mm. Cable with following specification, Conductor : Stranded Aluminium comply to IS : 8130 - 1984 or latest amendment if any, Colour coded, Voltage Grade : 11KV(E), Insulation : XLPE , Screening : Metallic with extruded semiconductor, Inner Sheath : Extruded PVC, Armour : Galvanized Steel Strips, Outer Sheath : Extruded PVC, Conforming to IS: 7098 (Part - 2) / 1985 or latest amendment if any. Laying of above cable (i) through existing covered masonry trench inclusive taking out Checker Plate covers, setting them in order, mending good the damages, providing new Checker Plate if required, filling the trench with fine dry sand inclusive supplying sand and (ii) in existing ducts at the 01 No. 01 No. 500 Mtr. 420 Mtr. bottom of the floor of the Sub station with necessary protection. dt. 21.01.2015 Unit Rate (Rs.) Amount (Rs.) Item No. 4b. 5. 6. 7. 8. 9. 10. Description Qty. Unit Laying of above cable through brick trench of inside dimension 0.5 m (W) x 0.75 m (D) providing with concrete cover, filling the trench with fine dry sand inclusive of supply of sand. Supply, Delivery, Installation, Testing and Commissioning of End Termination Kits (Heat Shrinkable) suitable for above mentioned cable by using Raychem make. Modify Cable End Box of the Transformers if required. Supply, Delivery, Installation, Testing and Commissioning of End Termination Kits (Heat Shrinkable) suitable for 3C x 120/95 sq. mm., 11KV(E), PILC cable (existing cable end for outgoing feeders which are connected with existing HT Panel) by using Raychem make. Supply and delivery of 3.5C x 240 sq. mm. Cable with following specification, Conductor : Stranded Aluminium comply to IS : 8130 - 1984 or latest amendment if any, Colour coded, Voltage Grade : 1.1KV, Insulation : XLPE , Inner Sheathed : Extruded PVC, Armour : Galvanized Steel Strips, Outer Sheathed : Extruded PVC, Conforming to IS: 7098 (Part - 1) / 1988 or latest amendment if any. Laying of above cable through existing covered masonry trench inclusive taking out RC covers/Checker Plate covers, setting them in order, mending good the damages, providing Checker Plate if required, filling the trench with fine dry sand inclusive supplying sand. Supplying and fixing compression type gland complete with brass gland, brass ring & rubber ring for dust & moisture proof entry of XLPE armoured cable, size of 3.5C x 240 sq. Mm., 1.1KV Grade. Finishing the end of above mentioned LT cable by crimping method inclusive supplying and fixing solder less socket (Dowels make), tapes, anticorrosive paste & jointing materials. 80 Mtr. 26 Nos. 05 Nos. 40 Mtr. 40 Mtr. 01 No. 01 No. Unit Rate (Rs.) Amount (Rs.) Item No. 11. 12. 13. 14. 15. Description Qty. Unit Supply, Delivery, Installation, Testing and Commissioning of Straight Through Jointing Kit suitable for 3.5C x 240 sq. Mm., 1.1KV Grade, XLPE Cable & PILC Cable by using Raychem make. Supply and delivery at site suitable H. T. Junction Box with suitable opening arrangement of approved design with earthing attachment and epoxy painting on outside surface & 2 coats of synthetic enamel paint over 1 coat of red lead priming on inside surface, fabricated by 3.15 mm thick MS Sheet with arrangement of connection of existing outgoing cables and new outgoing cables. Installation, Testing and Commissioning of above mentioned [Item No. 12] J.B. on wall including double earthing arrangement by 50 x 6 mm. GI Strip with suitable length from New Earth Station. Earthing with 65 mm. Dia GI Pipe (TATA - Medium) x 3.0 Mtrs. Long and 1 no. 50 mm. X 6 mm. Galvanized (Hot Dip) steel strip (4 Mtrs. Long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including finishing both ends by making holes etc. and S & F 65 mm dia GI Pipe (ISI - Medium) protection (3 Mts. Long) to be filled with bitumen 01 No. 05 Nos. 05 Nos. 21 Nos. 325 Mtr. under the ground level. Providing masonery enclosure on the top of the earth electrode of overall size 86.36 cm x 86.36 cm x 46 cm deep (below ground level) complete with cemented brick work (1 : 6) of 25 cm width duly plastered with cement morter (inside). CI hinged inspection cover of size 36.56 cm x 36.56 cm with locking arrangement, GI reducer including drilling of 46 nos. 12 mm dia holes on the GI pipe. With treatment of soil by using salt & charcoal or coke for pipe electrode. Earthing work is to be carried out as per relevant IS :3043. Connecting the equipments body to earth bus bar inclusive S&F 50 mm. X 6 mm. Galvanized (Hot Dip) MS flat under the ground level / on wall/floor with GI saddle as required and connection to equipments with inclusive drilling holes, bolts, nuts, washers etc. and mending good the damages as required. Unit Rate (Rs.) Amount (Rs.) Item No. 16. 17. Description Qty. Unit Extra for connecting the neutral of Transformer / Earth busbar to earth electrode including S&F 50 mm x 6 mm Galvanized (Hot Dip) Steel strip under the ground level /on wall/floor with GI saddles & insulating the same by one layer of PVC strip over one layer of ampere tape. Sub Total (i) 100 Mtr. 18. Less : Buy back of 1 no. HT Panel with HTOCBs & other accessories and 1 lot of dismantled HT Cables. 19. Grand Total [Sl. No. 17 - Sl. No. 18 ] Unit Rate (Rs.) Lumpsum Amount (Rs.) (-) Total in words (Rupees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . …………………………………….. . . . . . . . . . . . . . . . . . . ……. . . . . .) Note: Evaluation will be made on the basis of Grand Total at Sl. No. 19. The quantity above may increase or decrease as per requirement, for which payment will be made as per actual. The above price is inclusive of all taxes & duties but exclusive of Service Tax, which shall be paid extra on actual. As KoPT is not a Registered body corporate, it is not liable to pay Service Tax under ‘Reverse charge Mechanism’ as per Service Tax Law. The service provider is liable to recover Service Tax as applicable. (Office Rubber Stamp of the Tenderer Firm) Dated, the __________ Signature of the Witness Signature of the Tenderer
© Copyright 2024