SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 9 Fecha de Impresión: 22/10/2014 8:04:32 OPERACIONES CON TORRES: 21/10/2014 06:00am AL 22/10/2014 06:00am RIG: POZO: CCDC-069 AUCA-O068 EN COMPLETACION ACAO-068 MD (Pies): 10,550 TVD (Pies): 10,177.1 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO TUBOXTUBO TUBING 3 1/2" EUE EN 6200' RIG: POZO: H&P 121 PALO AZUL-N054 EN COMPLETACION PALO AZUL-N054 MD (Pies): 10,520 TVD (Pies): 10,195.3 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO SISTEMAS DE BOMBAS (4) RIG: POZO: H&P 132 EDEN YUTURI-D183 EDYD-183 MD (Pies): 8,774 TVD (Pies): 7,637.3 PROD.ESTIMADA: (BPPD) DETALLE: WOC RIG: POZO: EN COMPLETACION NABORS 815 YURALPA NORESTE-E102 YRNE-102 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) EVALUANDO ARENA HOLLÍN INTERVALO 8486' - 8498' (12 ft), CON BOMBA JET REVERSA 12 L DETALLE: CONVENCIONAL, CON MTU CIA. SERTECPET Y RIG NABORS 815. BFPD: 473, BSW: 88.4 %. RIG: POZO: OCEAN SPUR AMISTAD-015 EN COMPLETACION AMS-015S1 MD (Pies): 10,696 TVD (Pies): 10,219.2 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO EQUIPO SLICK LINE RIG: POZO: PDVSA-80 LAGO AGRIO-J052 EN COMPLETACION LGAJ-052 MD (Pies): 10,650 TVD (Pies): 10,351.4 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO CONJUNTO TCP EN 3 1/2" EUE TUBING CLASE " A" CALIBRANDO @ 1400' RIG: PETREX 5824 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 2 de 9 Fecha de Impresión: 22/10/2014 8:04:32 POZO: APAIKA-A012H EN COMPLETACION APKA-012H MD (Pies): 10,518 TVD (Pies): 6,121.5 PROD.ESTIMADA: (BPPD) FINALIZA EVENTO DE COMPLETACION DEL POZO APKA 12H EL DIA 21 DE OCTUBRE DEL 2014 A DETALLE: LAS 22:30 OK. RIG: POZO: PETROTECH 04 YUCA-G034 EN COMPLETACION YCAG-034 MD (Pies): 5,868.4 TVD (Pies): 5,429 PROD.ESTIMADA: (BPPD) EVALUANDO ARENA "Tinf" CON ELEMTOS DE PRESION, JET 11J Y UNIDAD MTU: P. INY = 3500 DETALLE: PSI. INY DIA = 2421 BSW INY = 98%. TBR = 603 BFPH = 10.4 BFPD = 250 BSWF = 23%. BSWR = 91 % SAL = 9000 PPM ¬CL RIG: POZO: SINOPEC 191 OSO-I140 EN COMPLETACION OSOI-140 MD (Pies): 9,500 TVD (Pies): 9,396.4 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO BHA C/SISTEMA HYDRAJET PERFORATING C/TBG D/3 1/2" A 35', SIN TERMINAR RIG: POZO: CCDC-039 CUYABENO-C060 CYBC-060 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) REALIZA REUNION DE SEGURIDAD PREVIO A CONTINUAR MOVILIZACION Y ARMADO DEL DETALLE: EQUIPO DEL RIG CCDC 39 RIG: POZO: PETREX 5824 APAIKA-A013H APKA-013H EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) PREPARANDO RIG DE PERFORACION PARA REALIZAR SKIDDING DESDE EL POZO APKA 12H AL DETALLE: POZO APKA 13H RIG: POZO: CCDC-036 LIMONCOCHA-H060H EN PERFORACION LMNH-060R1 MD (Pies): 8,215 TVD (Pies): 7,919.9 PROD.ESTIMADA: (BPPD) PERFORANDO ROTANDO HUECO DE 8-1/2" CON BHA No.3 CON PARAMETROS NORMALES @ 8215' DETALLE: EST SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 9 Fecha de Impresión: 22/10/2014 8:04:32 RIG: POZO: CCDC-038 ARAZA-A007 EN PERFORACION ARAZA-A007 MD (Pies): 5,364 TVD (Pies): 5,405.2 PROD.ESTIMADA: (BPPD) CIA. SAN ANTONIO QUIEBRA CABEZA DE CEMENTACIÓN 13 3/8" Y DESARMA LÍNEAS EN DETALLE: SUPERFICIE RIG: POZO: CCDC-066 COCA-A054 EN PERFORACION COCA-054 MD (Pies): 10,005 TVD (Pies): 8,959.8 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA # 4 DIRECCIONAL CON AUTOTRACK Y BROCA PDC 12 1/4" @ 3000 FT RIG: POZO: CCDC-068 AUCA-K180 EN PERFORACION ACAK-180 MD (Pies): 10,245 TVD (Pies): 9,559.3 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO CASING 9-5/8", N-80, 47#, BC @ 5700'. RIG: POZO: NABORS 609 CHONTA SUR-A002 EN PERFORACION CHSA-002 MD (Pies): 12,380 TVD (Pies): 10,546.6 PROD.ESTIMADA: (BPPD) BAJANDO BHA # 9 DD @ 11000,BROCA PDC 8 1/2" + GVR / ECOSCOPEY TELESCOPE ( LWD + DETALLE: MWD ) RIG: POZO: NABORS 794 JIVINO-E020 EN PERFORACION JVNE-020 MD (Pies): 6,342 TVD (Pies): 5,678.6 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA # 03 CONVENCIONAL C/ BROCA PDC 16" EN MODO BACK REAMING @ 5900' RIG: POZO: PDVSA-81 LAGO AGRIO-H060 EN PERFORACION LGAH-060 MD (Pies): 413 TVD (Pies): 413 PROD.ESTIMADA: (BPPD) DETALLE: GYRO DATA TOMANDO GYRO PREVIO A INICIAR KOP SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 4 de 9 Fecha de Impresión: 22/10/2014 8:04:32 RIG: POZO: SINOPEC 119 COCA-K044 EN PERFORACION COCK-044 MD (Pies): 7,375 TVD (Pies): 6,101.8 PROD.ESTIMADA: (BPPD) CIRCULANDO FONDOS ARRIBA + DENSIFICANDO SISTEMA DEL ACTIVO PREVIO A REALIZAR DETALLE: VIAJE CALIBRACION. RIG: POZO: SINOPEC 127 OSO-H119 EN PERFORACION OSOH-119 MD (Pies): 9,640 TVD (Pies): 9,459.9 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO A 9640 FT PARA LIMPIEZA DE POZO PREVIO A CEMENTACION RIG: POZO: SINOPEC 128 AUCA-Q118 EN PERFORACION ACAQ-118S1 MD (Pies): 10,735 TVD (Pies): 10,735 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO LINER DE 7" 26 #/PIE P-110 BTC @ 9000'. RIG: POZO: SINOPEC 129 OSO-A150 EN PERFORACION OSOA-150 MD (Pies): 10,864 TVD (Pies): 9,138.7 PROD.ESTIMADA: (BPPD) PERFORANDO CON BHA # 13 DIRECCIONAL + MOTOR DE FONDO + BROCA PDC DE 8-1/2" @ DETALLE: 10864' MD. RIG: POZO: SINOPEC 156 AUCA-P175 EN PERFORACION ACAP-175 MD (Pies): 9,240 TVD (Pies): 7,677.5 PROD.ESTIMADA: (BPPD) REALIZANDO VIAJE DE CALIBRE CON BHA # 4 EN HOYO ABIERTO DESDE 9240' HASTA 6380' DETALLE: ZAPATO, CORTAN 120' DE CABLE DE PERFORACION. RIG: POZO: SINOPEC 168 OSO-G099 EN PERFORACION OSOG-099 MD (Pies): 9,230 TVD (Pies): 8,947.9 PROD.ESTIMADA: (BPPD) DETALLE: PERFORA CON BROCA 12 1/4" Y MOTOR DE FDO. CON LWD/MWD/T. COMBO @ 9230 PIES. RIG: POZO: SINOPEC 169 DRAGO NORTE-A042 DRRA-042 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 5 de 9 Fecha de Impresión: 22/10/2014 8:04:32 MD (Pies): 5,878 TVD (Pies): 5,566.6 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO SECCION 12 1 /4" CON BHA DIRECCIONAL # 4 Y BROCA PDC @ 5878 FT RIG: POZO: SINOPEC 248 CONONACO-I040 EN PERFORACION CNOI-040S1 MD (Pies): 8,933 TVD (Pies): 8,674.1 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA#5 DIRECCIONAL CON 8-1/2" BROCA PDC A 8931 FT RIG: POZO: HILONG 18 EDEN YUTURI-K107 EDYK-107 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO BHA DE PESCA EN 3-½" DRILL PIPE MIDIENDO CALIBRANDO Y SUBIENDO DE DETALLE: CABALLETES 1 X 1 A LAS 06:00 HRS DENTRO DEL POZO @ 791' CON 25 JOINT + BHA RIG: POZO: CCDC-041 FRONTERA-006 FRN-006 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACANDO COMPLETACION DE BOMBEO HIDRAULICO EN 3 1/2" EUE TUBERIA CLASE "B" RIG: POZO: CCDC-052 ARMADILLO A 001 EN WORKOVER ARMA-001 MD (Pies): 6,500 TVD (Pies): 6,500 PROD.ESTIMADA: (BPPD) EVALUANDO ARENA "BT" CON BOMBA JET CLAW 11-K (PAM) Y UNIDAD MTU DE CIA. SERTECPET DETALLE: AL TANQUE BOTA DE FACILIDADES EN LA LOCACIÓN. RIG: POZO: DYGOIL-30 SHUSHUFINDI-H202 SHSH-202 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) INSTALANDO 13 3/8" x 11" x 5000 PSI ADAPTER + 11" x 5000 PSI EXTENSIÓN + 11" x 5000 PSI DETALLE: BOP. RIG: POZO: GEOPETSA-01 LAGO AGRIO-013 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 6 de 9 Fecha de Impresión: 22/10/2014 8:04:32 LGA-013 MD (Pies): 3,201.5 TVD (Pies): 3,201.5 PROD.ESTIMADA: (BPPD) DETALLE: EVALUANDO ARENA "US" CON BOMBA JET MAS UNIDAD MTU DE CÍA. SERTECPET RIG: POZO: GEOPETSA-06 LAGO AGRIO-E024 EN WORKOVER LGAE-024 MD (Pies): 8,901.2 TVD (Pies): 8,901.2 PROD.ESTIMADA: (BPPD) DETALLE: EVALUANDO ARENA "B.T" CON BOMBA JET 9-I Y UNIDAD MTU AL TANQUE BOTA DEL RIG. RIG: POZO: HILONG 28 PAKA NORTE-A010 EN WORKOVER PKNA-010 MD (Pies): 11,169 TVD (Pies): 9,486.3 PROD.ESTIMADA: (BPPD) CONTINUA EVALUACION DE LA ARENA U INFERIOR CON BOMBA JET CLAW DIRECTA 3 1/2" x 2.81" 12 K + UNIDAD MTU HACIA LA ESTACION: PRESION DE INYECCION 3500 PSI, 120 BBL DETALLE: INYECTADOS POR HORA, 39 BBL RECUPERADOS POR HORA, TOTAL 914 BBLS RECUPERADOS, BSW = 95 %. RIG: POZO: KEY 80051 SHUSHUFINDI-044 EN WORKOVER SHS-044 MD (Pies): 7,300 TVD (Pies): 7,300 PROD.ESTIMADA: (BPPD) A LA 06:00HRS BAJANDO BHA MOLEDOR EN 2-7/8" DP MIDIENDO Y CALIBRANDO CIRCULANDO DETALLE: CSG TBG CADA 2500 FT. DENTRO DEL POZO 6112 FT (191 JOINT) + BHA. RIG: POZO: KEY 80057 SHUSHUFINDI-H015B SHSH-015B EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: DESARMA RIG-80057 RIG: POZO: KEY 80057 SHUSHUFINDI-S107 EN WORKOVER SHSS-107 MD (Pies): 700 TVD (Pies): 700 PROD.ESTIMADA: (BPPD) DETALLE: ESPERA LUZ DEL DIA PARA DESARMAR RIG KEY-80057 RIG: NABORS 813 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION POZO: EDEN YUTURI-H149H EDYH-149H Página 7 de 9 Fecha de Impresión: 22/10/2014 8:04:32 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO BHA # 07 DE PESCA CON 8 1/2" OVERSHOT EN 3 1/2'' DP EN PARADAS. 06H00 FUERA DETALLE: DEL POZO 4300' (68 PARADAS 3 1/2" DP) RIG: POZO: NABORS 814 PALO AZUL-C040 EN WORKOVER PLAC-040 MD (Pies): 0 TVD (Pies): 0 PROD.ESTIMADA: (BPPD) DETALLE: ARMAR EQUIPO SLICK LINE EQUIPETROL, PARA BAJAR CON 3-1/2" BLOQUE IMPRESOR. RIG: POZO: NABORS 819 PAKA SUR-A005 PKSA-005 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: RETIRANDO SUB ESTRUCTURA DEL RIG. RIG: POZO: SAXON 32 OSO-A055H EN WORKOVER OSOA-055H MD (Pies): 9,147 TVD (Pies): 8,576.9 PROD.ESTIMADA: (BPPD) CIRCULANDO EN REVERSA PARA LIMPIEZA DEL POZO @ 9147' CON FLUIDO DE CONTROL DE 8.9 DETALLE: LPG AL TANQUE DE LODOS. RIG: POZO: SAXON 34 SECOYA-014 EN WORKOVER SCY-014 MD (Pies): 3,300 TVD (Pies): 3,300 PROD.ESTIMADA: (BPPD) BAJANDO BHA DE PESCA N° 2 EN 3 1/2" DRILL PIPE, MIDIENDO Y CALIBRANDO. DENTRO DEL DETALLE: POZO 3300FT. RIG: POZO: SAXON 47 SECOYA-018 EN WORKOVER SCY-018 MD (Pies): 9,207.8 TVD (Pies): 9,207.8 PROD.ESTIMADA: (BPPD) BAJANDO BHA DE ASENTAMIENTO 7" CIBP EN 3-1/2" EUE TBG EN PARADAS; MIDIENDO.,CALIBRANDO EN CADA PIN DE LOS TUBOS DESE 42,45' Y PROBANDO CON 3000 PSI DETALLE: CADA 24 PARADAS DENTRO DEL POZO A LAS 06H00: 7379' SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 8 de 9 Fecha de Impresión: 22/10/2014 8:04:32 RIG: POZO: SAXON 55 PICHINCHA-007 EN WORKOVER PCH-007 MD (Pies): 6,104.9 TVD (Pies): 6,104.9 PROD.ESTIMADA: (BPPD) CONT. REALIZANDO PRUEBA DE "T CON BES BAKER CENTRILIFT PF10XH6 A LA ESTACIÓN DETALLE: PICHINCHA RIG: POZO: TRIBOILGAS-008 DRAGO NORTE-C021 DRRC-021 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO 3 1/2" TUBERIA EUE CLASE "B" CON CABLE ELÉCTRICO, QUEBRANDO A LOS DETALLE: CABALLETES, RETIRA PROTECTORES CANNON Y MID-JOINTS. FUERA DEL POZO 7500' A LAS 06H00 RIG: POZO: TRIBOILGAS-101 TIPISHCA-C014 TPSC-014 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) Bajando BHA de limpieza con 6 1/8" broca en tuberia 3-1/2" eue en paradas desde la torre DETALLE: midiendo. A las 6:00 dentro del pozo 5200' RIG: POZO: TRIBOILGAS-102 CONONACO-C046 CNOC-046R1 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) EVALUANDO ARENA “Us” CON BOMBA JET 12-K ( GEOMETRIA DE PAM): P.INY = 3500 PSI ; BIPH DETALLE: = 120 BLS. ; BSW INY. = 88% /// TBR= 380 BLS; BFPH = 14 BLS. ; BFPD = 336 BLS.; BSW PRODUCCIÓN = 42%; SALINIDAD: 2000 PPMCL RIG: POZO: TRIBOILGAS-103 ANACONDA-A008 EN WORKOVER ANCA-008 MD (Pies): 10,645 TVD (Pies): 10,032.8 PROD.ESTIMADA: (BPPD) DETALLE: CAMBIANDO VALVULA LATERAL DE 2-1/16" x 5000 PSI SECCION "B" RIG: POZO: TRIBOILGAS-104 AUCA-018 EN WORKOVER ACA-018 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 9 de 9 Fecha de Impresión: 22/10/2014 8:04:32 MD (Pies): 8,977 TVD (Pies): 8,977 PROD.ESTIMADA: (BPPD) REALIZANDO PRUEBA DE PRODUCCIÓN DE EQUIPO BES P4X H6 A ARENA "BASAL TENA" AL DETALLE: TANQUE BOTA DEL RIG RIG: POZO: TRIBOILGAS-107 VICTOR HUGO RUALES-003 VHR-003 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) TECNICO DE CIA SCHLUMBERGER REDA DESARMANDO EQUIPO BES: 3-1/2" DESCARGA EUE , DETALLE: DESCARGA PHOENIX , BOMBA D800N , SEPARADOR DE GAS , 2 PROTECTORES RIG: POZO: TRIBOILGAS-201 LAGO AGRIO-033 EN WORKOVER LGA-033 MD (Pies): 247.5 TVD (Pies): 247.5 PROD.ESTIMADA: (BPPD) ARMANDO BHA DE PESCA: 4 3/4" ARPON (SLB), 3 1/2" D.P (1), 4 3/4" SPEAR STOP, 4 3/4" DETALLE: MARTILLO HIDRAULICO, 4 3/4" DRILL COLLARS (6). RIG: POZO: TUSCANY 108 PACAYACU-B009 PYAB-009 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:500 (BPPD) SACANDO BHA DE EVALUACION CON TUBERIA DE 3 1/2" TSH BLUE EN PARADAS CON LLAVE DE DETALLE: TORQUE DE CIA ITS, LLENANDO EL POZO CADA 10 PARADAS FUERA DEL POZO A LAS 06:00 HRS 6300' CON 200 TUBOS DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día
© Copyright 2024