SUMARIO DE OPERACIONES PRODUCCION Y

SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 1 de 7
Fecha de Impresión:
13/01/2015 7:22:32
OPERACIONES CON TORRES: 12/01/2015 06:00am AL 13/01/2015 06:00am
RIG:
POZO:
CCDC-066
COCA-A056
EN COMPLETACION
COCA-056
MD (Pies):
11,600
TVD (Pies):
9,798.2
PROD.ESTIMADA: (BPPD)
DETALLE:
QUEBRANDO TUBERÍA DE 3-1/2" EUE.
RIG:
POZO:
GEOPETSA-05
GUANTA-E046
EN COMPLETACION
GNTE-046
MD (Pies):
10,696
TVD (Pies):
10,265.2
PROD.ESTIMADA: (BPPD)
BAJANDO TUBERIA DE 3 1/2" EUE L-80 CON NO-GO MIDIENDO, CALIBRANDO Y PROBANDO CON
DETALLE:
3000 PSI C/40 TUBOS
RIG:
POZO:
SAXON 32
ATACAPI-G032
ATCG-032
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
TECNICO SLB TESTING LANZA BARRA Y DETONAN CAÑONES DE 4,5" EN EL INTERVALO T inf:
DETALLE:
9786'-9794' (8'), (9799'-9808') (9') OBSERVAN SOPLO FUERTE
RIG:
POZO:
SINOPEC 128
AUCA-Q174
EN COMPLETACION
ACAQ-174
MD (Pies):
11,380
TVD (Pies):
11,057.6
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO EQUIPO BES D800N EN 3 1/2" TBG EUE CLASE "A" HASTA 6243'
RIG:
POZO:
SINOPEC 248
CONONACO-I041
EN COMPLETACION
CNOI-041
MD (Pies):
10,668
TVD (Pies):
10,607.4
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJA EQUIPO BES CON Y-TOOL A 4100'
RIG:
POZO:
CCDC-038
TAPI-C014
TAPC-014
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
ESPERANDO LUZ DEL DÍA PARA CONTINUAR DESARMANDO, MOVILIZANDO Y ARMANDO EQUIPO
DETALLE:
DESDE EL POZO TAPI B-016 S1 HACIA EL POZO TAPI C-014
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 2 de 7
Fecha de Impresión:
13/01/2015 7:22:32
RIG:
POZO:
NABORS 609
RUMIYACU-A005
EN MOVILIZACION
RMYA-005
MD (Pies):
11,449.7
TVD (Pies):
11,449.7
PROD.ESTIMADA: (BPPD)
ESPERANDO LUZ DEL DIA PARA CONTINUAR CON OPERACIONES DE MOVILIZACION DEL RIG
DETALLE:
NABORS 609. R/D: 100%; R/M: 90 %; R/U: 70 %
RIG:
POZO:
SINOPEC 191
OSO-I005I
OSOI-005I
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO LUZ DEL DIA PARA CONTINUAR CON EL DESARME DEL TALADRO.
RIG:
POZO:
CCDC-069
AUCA-O156
EN PERFORACION
ACAO-156
MD (Pies):
8,650
TVD (Pies):
8,117.1
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO ROTANDO Y DELIZANDO CON BHA # 4 DD @ 8650' MD.
RIG:
POZO:
OCEAN SPUR
AMISTAD-A023
EN PERFORACION
AMSA-023S1
MD (Pies):
11,110
TVD (Pies):
10,560.9
PROD.ESTIMADA: (BPPD)
CIRCULA CON 500 GPM, 3660 PSI, 45 RPM, TORQUE: 8 KLB/FT MIENTRAS REPASA ULTIMA PARA
DETALLE:
PERFORADA.FT
RIG:
POZO:
PTX 3
SECOYA-C049
EN PERFORACION
SCYC-049
MD (Pies):
9,975
TVD (Pies):
9,975
PROD.ESTIMADA: (BPPD)
INSTALANDO WEAR BUSHING EN SECCION "B" DEL CABEZAL PREVIO A ARMADA DE BHA
DETALLE:
DIRECCIONAL No.5
RIG:
POZO:
SINOPEC 119
COCA-K045
EN PERFORACION
COCK-045
MD (Pies):
11,957
TVD (Pies):
9,744
PROD.ESTIMADA: (BPPD)
DETALLE:
SE DISPONE A REALIZAR CEMENTACIÓN DEL LINER DE 7" 26 #/PIE P-110 @ 11956'.
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 7
Fecha de Impresión:
13/01/2015 7:22:32
RIG:
POZO:
SINOPEC 127
OSO-H122
EN PERFORACION
OSOH-122
MD (Pies):
9,405
TVD (Pies):
9,064.5
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA # 6 DE LIMPIEZA + BROCA PDC DE 12 1/4" + @ 900 MD
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-D053
EN PERFORACION
DRRD-053
MD (Pies):
9,032
TVD (Pies):
8,727.6
PROD.ESTIMADA: (BPPD)
DETALLE:
CIA BAKER INTEQ DESARMA BHA # 7 DIRECCIONAL + BROCA PDC 12 1/4" TIPO FX46S
RIG:
POZO:
TUSCANY-102
ATACAPI-001
EN PERFORACION
ATC-001R1
MD (Pies):
0
TVD (Pies):
0
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMA BHA # 05 CON FASTRACK TRI-MILL
RIG:
POZO:
HILONG 18
EDEN YUTURI-B047
EDYB-047R1
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO BHA # 6 CON JUNK MILL EN 3 1/2" DP EN PARADAS @ 4121 FT + BHA ( SIN
DETALLE:
TERMINAR)
RIG:
POZO:
CCDC-051
GACELA-F006
EN WORKOVER
GCLF-006
MD (Pies):
4,100
TVD (Pies):
4,100
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO CAÑONES LUEGO DE DISPAROS.
RIG:
POZO:
OPERACION SIN TERMINAR.
CCDC-052
CONONACO-009
EN WORKOVER
CNO-009
MD (Pies):
9,998
TVD (Pies):
9,998
PROD.ESTIMADA: (BPPD)
DETALLE:
INSTALANDO QCI BAJO TBG HGR. ASENTANDO HGR. ARMANDO CABEZAL ELECTRICO
RIG:
DYGOIL-30
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 7
Fecha de Impresión:
13/01/2015 7:22:32
POZO:
AGUARICO OESTE-001
EN WORKOVER
AGO-001
MD (Pies):
9,419
TVD (Pies):
9,419
PROD.ESTIMADA: (BPPD)
DETALLE:
EVALUANDO "HS" CON JET 10-I Y MTU DE SERTECPET AL TANQUE BOTA DEL RIG.
RIG:
POZO:
GEOPETSA-01
GUANTA-G030
GNTG-030
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO COMPLETACION HIDRAULICA EN 3-1/2" SEC TUBERIA CLASE "A"
RIG:
POZO:
GEOPETSA-04
PARAHUACU-001
EN WORKOVER
PRH-001
MD (Pies):
7,943.5
TVD (Pies):
7,943.5
PROD.ESTIMADA: (BPPD)
SACANDO BHA MOLEDOR CON 4 3/4" JUNK MILL (WEATHERFORD) EN PARADAS HACIA LA
DETALLE:
TORRE. FUERA DEL POZO: 800 FT @ 06H00 HRS
RIG:
POZO:
HILONG 28
LIMONCOCHA-L028
LMNL-028
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
LLENANDO POZO CON 200 BLS + CONTROLANDO POZO EN REVERZA CON FLUIDO DE CONTROL
DETALLE:
DE 8,39 LPG DE CIA SLB, TOTAL BOMBEADO 470 BLS.
RIG:
POZO:
KEY 80051
SHUSHUFINDI-036
EN WORKOVER
SHS-036
MD (Pies):
9,135
TVD (Pies):
9,135
PROD.ESTIMADA: (BPPD)
A LAS 06:00 HRS RIH BHA DE LIMPIEZA EN 3-1/2" TBG EUE CLASE "B" EN PARADAS. DENTRO DEL
DETALLE:
POZO 7100' ( 113 PARADAS + BHA)
RIG:
POZO:
KEY 80057
SHUSHUFINDI-H238
SHSH-238
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
LAVANDO TANQUES DE LODO + EVACUANDO AGUAS CONTAMINADAS
RIG:
NABORS 813
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 5 de 7
Fecha de Impresión:
13/01/2015 7:22:32
POZO:
EDEN YUTURI-H149H
EN WORKOVER
EDYH-149H
MD (Pies):
7,398
TVD (Pies):
6,709.1
PROD.ESTIMADA: (BPPD)
BAJA BHA # 29 CON OVER SHOT DE. 4 9/16"' EN 3½'' D/P EN PARADAS A LAS 06:00 HRS 2200'
DETALLE:
DENTRO DEL POZO ( 32 PARADAS + BHA )
RIG:
POZO:
NABORS 814
PATA-A004
PATA-004
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACA SARTA DE TUBERIA 3-1/2" EUE SIN PACKERS QUEBRANDO. 780FT FUERA DEL POZO
RIG:
POZO:
NABORS 815
OSO-B060H
EN WORKOVER
OSOB-060H
MD (Pies):
1,200
TVD (Pies):
1,193.5
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJA BHA # 2 CON SCRAPER 9-5/8" EN DRILL PIPE 3-1/2" DENTRO DEL POZO 1200'.
RIG:
POZO:
NABORS 819
PAKA SUR-A008
EN WORKOVER
PKSA-008
MD (Pies):
11,063
TVD (Pies):
10,002.8
PROD.ESTIMADA: (BPPD)
PRUEBA DE PRODUCCION A LA ARENA "HP" CON EQUIPO BES CENTRILIFT P23 (GIRO FORWARD)
DETALLE:
CON RETORNO A LA ESTACION.
RIG:
POZO:
PETREX 5824
APAIKA-A009
APKA-009
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
SACANDO TUBING 4 1/2" CON BHA DE PRODUCCION QUEBRANDO TUBO POR TUBO A LA
DETALLE:
PLANCHADA A 7600'
RIG:
POZO:
SAXON 34
SHUSHUQUI-018
EN WORKOVER
SHH-018
MD (Pies):
9,258
TVD (Pies):
9,258
PROD.ESTIMADA:100 (BPPD)
DESARMAN BHA DE MOLIENDA, JUNK MILL SALE GASTADO 60%, CANASTA CON 8 LBS DE
DETALLE:
CHATARRA
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
RIG:
POZO:
SAXON 53
EDEN YUTURI-C094
EDYC-094R1
Página 6 de 7
Fecha de Impresión:
13/01/2015 7:22:32
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
GESTIONANDO ARRANQUE DE EQUIPO BES PARA ROMPER LA COLUMNA DE CRUDO QUE SE
DETALLE:
TIENE EN TUBING.
RIG:
POZO:
SAXON 55
SECOYA-D048
SCYD-048
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:350 (BPPD)
SACAN QUEBRANDO BHA DE LIMPIEZA ESPECIAL EN TANDEM EN 3-1/2" DRILL PIPE A LAS 06H00
DETALLE:
FUERA DEL POZO 8500'
RIG:
POZO:
SINOPEC-905
EDEN YUTURI-T156
EDYT-156
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
EN ESPERA DE MOC ENVIADO A QUITO + REVISION DEL DOSSIER ENTREGADO A QA/QC DE PAM
DETALLE:
EP.
RIG:
POZO:
TRIBOILGAS-006
TETETE-008
EN WORKOVER
TTT-008
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:200 (BPPD)
DETALLE:
INSTALAN BOP DE 11" X 7-1/16" X 3000 PSI, PRUEBAN FUNCIONAMIENTO CON 1500 PSI, OK
RIG:
POZO:
TRIBOILGAS-101
VICTOR HUGO RUALES-005
VHR-005
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
RETIRANDO SECCION "C" DEL CABEZAL +LEVANTANDO SARTA Y RETIRANDO HANGER, RETIRA
DETALLE:
SECCION "B" DEL CABEZAL.
RIG:
POZO:
TRIBOILGAS-102
CULEBRA-A006
CLBA-006
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO EMPATE A SEGUNDO CARRETO @ 4412 PIES OK.
RIG:
POZO:
TRIBOILGAS-104
AUCA-H083
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 7 de 7
Fecha de Impresión:
13/01/2015 7:22:32
ACAH-083
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
EVALUANDO ARENA "Tinf" CON BOMBA JET CLAW 10- i CON ELEMENTOS DE PRESIÓN CIA
DETALLE:
DYGOIL Y MTU DE CIA. SERTECPET AL TANQUE BOTA DEL RIG EN LA LOCACIÓN.
DESCRIPCION DE UNIDADES:
BPPD: Barriles de Petróleo por día