SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 7 Fecha de Impresión: 13/01/2015 7:22:32 OPERACIONES CON TORRES: 12/01/2015 06:00am AL 13/01/2015 06:00am RIG: POZO: CCDC-066 COCA-A056 EN COMPLETACION COCA-056 MD (Pies): 11,600 TVD (Pies): 9,798.2 PROD.ESTIMADA: (BPPD) DETALLE: QUEBRANDO TUBERÍA DE 3-1/2" EUE. RIG: POZO: GEOPETSA-05 GUANTA-E046 EN COMPLETACION GNTE-046 MD (Pies): 10,696 TVD (Pies): 10,265.2 PROD.ESTIMADA: (BPPD) BAJANDO TUBERIA DE 3 1/2" EUE L-80 CON NO-GO MIDIENDO, CALIBRANDO Y PROBANDO CON DETALLE: 3000 PSI C/40 TUBOS RIG: POZO: SAXON 32 ATACAPI-G032 ATCG-032 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) TECNICO SLB TESTING LANZA BARRA Y DETONAN CAÑONES DE 4,5" EN EL INTERVALO T inf: DETALLE: 9786'-9794' (8'), (9799'-9808') (9') OBSERVAN SOPLO FUERTE RIG: POZO: SINOPEC 128 AUCA-Q174 EN COMPLETACION ACAQ-174 MD (Pies): 11,380 TVD (Pies): 11,057.6 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO EQUIPO BES D800N EN 3 1/2" TBG EUE CLASE "A" HASTA 6243' RIG: POZO: SINOPEC 248 CONONACO-I041 EN COMPLETACION CNOI-041 MD (Pies): 10,668 TVD (Pies): 10,607.4 PROD.ESTIMADA: (BPPD) DETALLE: BAJA EQUIPO BES CON Y-TOOL A 4100' RIG: POZO: CCDC-038 TAPI-C014 TAPC-014 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) ESPERANDO LUZ DEL DÍA PARA CONTINUAR DESARMANDO, MOVILIZANDO Y ARMANDO EQUIPO DETALLE: DESDE EL POZO TAPI B-016 S1 HACIA EL POZO TAPI C-014 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 2 de 7 Fecha de Impresión: 13/01/2015 7:22:32 RIG: POZO: NABORS 609 RUMIYACU-A005 EN MOVILIZACION RMYA-005 MD (Pies): 11,449.7 TVD (Pies): 11,449.7 PROD.ESTIMADA: (BPPD) ESPERANDO LUZ DEL DIA PARA CONTINUAR CON OPERACIONES DE MOVILIZACION DEL RIG DETALLE: NABORS 609. R/D: 100%; R/M: 90 %; R/U: 70 % RIG: POZO: SINOPEC 191 OSO-I005I OSOI-005I EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: ESPERANDO LUZ DEL DIA PARA CONTINUAR CON EL DESARME DEL TALADRO. RIG: POZO: CCDC-069 AUCA-O156 EN PERFORACION ACAO-156 MD (Pies): 8,650 TVD (Pies): 8,117.1 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO ROTANDO Y DELIZANDO CON BHA # 4 DD @ 8650' MD. RIG: POZO: OCEAN SPUR AMISTAD-A023 EN PERFORACION AMSA-023S1 MD (Pies): 11,110 TVD (Pies): 10,560.9 PROD.ESTIMADA: (BPPD) CIRCULA CON 500 GPM, 3660 PSI, 45 RPM, TORQUE: 8 KLB/FT MIENTRAS REPASA ULTIMA PARA DETALLE: PERFORADA.FT RIG: POZO: PTX 3 SECOYA-C049 EN PERFORACION SCYC-049 MD (Pies): 9,975 TVD (Pies): 9,975 PROD.ESTIMADA: (BPPD) INSTALANDO WEAR BUSHING EN SECCION "B" DEL CABEZAL PREVIO A ARMADA DE BHA DETALLE: DIRECCIONAL No.5 RIG: POZO: SINOPEC 119 COCA-K045 EN PERFORACION COCK-045 MD (Pies): 11,957 TVD (Pies): 9,744 PROD.ESTIMADA: (BPPD) DETALLE: SE DISPONE A REALIZAR CEMENTACIÓN DEL LINER DE 7" 26 #/PIE P-110 @ 11956'. SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 7 Fecha de Impresión: 13/01/2015 7:22:32 RIG: POZO: SINOPEC 127 OSO-H122 EN PERFORACION OSOH-122 MD (Pies): 9,405 TVD (Pies): 9,064.5 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA # 6 DE LIMPIEZA + BROCA PDC DE 12 1/4" + @ 900 MD RIG: POZO: SINOPEC 169 DRAGO NORTE-D053 EN PERFORACION DRRD-053 MD (Pies): 9,032 TVD (Pies): 8,727.6 PROD.ESTIMADA: (BPPD) DETALLE: CIA BAKER INTEQ DESARMA BHA # 7 DIRECCIONAL + BROCA PDC 12 1/4" TIPO FX46S RIG: POZO: TUSCANY-102 ATACAPI-001 EN PERFORACION ATC-001R1 MD (Pies): 0 TVD (Pies): 0 PROD.ESTIMADA: (BPPD) DETALLE: ARMA BHA # 05 CON FASTRACK TRI-MILL RIG: POZO: HILONG 18 EDEN YUTURI-B047 EDYB-047R1 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO BHA # 6 CON JUNK MILL EN 3 1/2" DP EN PARADAS @ 4121 FT + BHA ( SIN DETALLE: TERMINAR) RIG: POZO: CCDC-051 GACELA-F006 EN WORKOVER GCLF-006 MD (Pies): 4,100 TVD (Pies): 4,100 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO CAÑONES LUEGO DE DISPAROS. RIG: POZO: OPERACION SIN TERMINAR. CCDC-052 CONONACO-009 EN WORKOVER CNO-009 MD (Pies): 9,998 TVD (Pies): 9,998 PROD.ESTIMADA: (BPPD) DETALLE: INSTALANDO QCI BAJO TBG HGR. ASENTANDO HGR. ARMANDO CABEZAL ELECTRICO RIG: DYGOIL-30 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 4 de 7 Fecha de Impresión: 13/01/2015 7:22:32 POZO: AGUARICO OESTE-001 EN WORKOVER AGO-001 MD (Pies): 9,419 TVD (Pies): 9,419 PROD.ESTIMADA: (BPPD) DETALLE: EVALUANDO "HS" CON JET 10-I Y MTU DE SERTECPET AL TANQUE BOTA DEL RIG. RIG: POZO: GEOPETSA-01 GUANTA-G030 GNTG-030 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACANDO COMPLETACION HIDRAULICA EN 3-1/2" SEC TUBERIA CLASE "A" RIG: POZO: GEOPETSA-04 PARAHUACU-001 EN WORKOVER PRH-001 MD (Pies): 7,943.5 TVD (Pies): 7,943.5 PROD.ESTIMADA: (BPPD) SACANDO BHA MOLEDOR CON 4 3/4" JUNK MILL (WEATHERFORD) EN PARADAS HACIA LA DETALLE: TORRE. FUERA DEL POZO: 800 FT @ 06H00 HRS RIG: POZO: HILONG 28 LIMONCOCHA-L028 LMNL-028 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) LLENANDO POZO CON 200 BLS + CONTROLANDO POZO EN REVERZA CON FLUIDO DE CONTROL DETALLE: DE 8,39 LPG DE CIA SLB, TOTAL BOMBEADO 470 BLS. RIG: POZO: KEY 80051 SHUSHUFINDI-036 EN WORKOVER SHS-036 MD (Pies): 9,135 TVD (Pies): 9,135 PROD.ESTIMADA: (BPPD) A LAS 06:00 HRS RIH BHA DE LIMPIEZA EN 3-1/2" TBG EUE CLASE "B" EN PARADAS. DENTRO DEL DETALLE: POZO 7100' ( 113 PARADAS + BHA) RIG: POZO: KEY 80057 SHUSHUFINDI-H238 SHSH-238 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: LAVANDO TANQUES DE LODO + EVACUANDO AGUAS CONTAMINADAS RIG: NABORS 813 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 5 de 7 Fecha de Impresión: 13/01/2015 7:22:32 POZO: EDEN YUTURI-H149H EN WORKOVER EDYH-149H MD (Pies): 7,398 TVD (Pies): 6,709.1 PROD.ESTIMADA: (BPPD) BAJA BHA # 29 CON OVER SHOT DE. 4 9/16"' EN 3½'' D/P EN PARADAS A LAS 06:00 HRS 2200' DETALLE: DENTRO DEL POZO ( 32 PARADAS + BHA ) RIG: POZO: NABORS 814 PATA-A004 PATA-004 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACA SARTA DE TUBERIA 3-1/2" EUE SIN PACKERS QUEBRANDO. 780FT FUERA DEL POZO RIG: POZO: NABORS 815 OSO-B060H EN WORKOVER OSOB-060H MD (Pies): 1,200 TVD (Pies): 1,193.5 PROD.ESTIMADA: (BPPD) DETALLE: BAJA BHA # 2 CON SCRAPER 9-5/8" EN DRILL PIPE 3-1/2" DENTRO DEL POZO 1200'. RIG: POZO: NABORS 819 PAKA SUR-A008 EN WORKOVER PKSA-008 MD (Pies): 11,063 TVD (Pies): 10,002.8 PROD.ESTIMADA: (BPPD) PRUEBA DE PRODUCCION A LA ARENA "HP" CON EQUIPO BES CENTRILIFT P23 (GIRO FORWARD) DETALLE: CON RETORNO A LA ESTACION. RIG: POZO: PETREX 5824 APAIKA-A009 APKA-009 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO TUBING 4 1/2" CON BHA DE PRODUCCION QUEBRANDO TUBO POR TUBO A LA DETALLE: PLANCHADA A 7600' RIG: POZO: SAXON 34 SHUSHUQUI-018 EN WORKOVER SHH-018 MD (Pies): 9,258 TVD (Pies): 9,258 PROD.ESTIMADA:100 (BPPD) DESARMAN BHA DE MOLIENDA, JUNK MILL SALE GASTADO 60%, CANASTA CON 8 LBS DE DETALLE: CHATARRA SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION RIG: POZO: SAXON 53 EDEN YUTURI-C094 EDYC-094R1 Página 6 de 7 Fecha de Impresión: 13/01/2015 7:22:32 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) GESTIONANDO ARRANQUE DE EQUIPO BES PARA ROMPER LA COLUMNA DE CRUDO QUE SE DETALLE: TIENE EN TUBING. RIG: POZO: SAXON 55 SECOYA-D048 SCYD-048 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:350 (BPPD) SACAN QUEBRANDO BHA DE LIMPIEZA ESPECIAL EN TANDEM EN 3-1/2" DRILL PIPE A LAS 06H00 DETALLE: FUERA DEL POZO 8500' RIG: POZO: SINOPEC-905 EDEN YUTURI-T156 EDYT-156 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) EN ESPERA DE MOC ENVIADO A QUITO + REVISION DEL DOSSIER ENTREGADO A QA/QC DE PAM DETALLE: EP. RIG: POZO: TRIBOILGAS-006 TETETE-008 EN WORKOVER TTT-008 MD (Pies): TVD (Pies): PROD.ESTIMADA:200 (BPPD) DETALLE: INSTALAN BOP DE 11" X 7-1/16" X 3000 PSI, PRUEBAN FUNCIONAMIENTO CON 1500 PSI, OK RIG: POZO: TRIBOILGAS-101 VICTOR HUGO RUALES-005 VHR-005 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) RETIRANDO SECCION "C" DEL CABEZAL +LEVANTANDO SARTA Y RETIRANDO HANGER, RETIRA DETALLE: SECCION "B" DEL CABEZAL. RIG: POZO: TRIBOILGAS-102 CULEBRA-A006 CLBA-006 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO EMPATE A SEGUNDO CARRETO @ 4412 PIES OK. RIG: POZO: TRIBOILGAS-104 AUCA-H083 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 7 de 7 Fecha de Impresión: 13/01/2015 7:22:32 ACAH-083 MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) EVALUANDO ARENA "Tinf" CON BOMBA JET CLAW 10- i CON ELEMENTOS DE PRESIÓN CIA DETALLE: DYGOIL Y MTU DE CIA. SERTECPET AL TANQUE BOTA DEL RIG EN LA LOCACIÓN. DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día
© Copyright 2024