sumario de operaciones produccion y perforacion - Petroamazonas

SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 1 de 9
Fecha de Impresión:
15/10/2014 8:01:55
OPERACIONES CON TORRES: 14/10/2014 06:00am AL 15/10/2014 06:00am
RIG:
POZO:
CCDC-036
LIMONCOCHA-H060H
LMNH-060HS2
ABANDONO
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
A LAS 18:30 DEL DÍA 14 DE OCTUBRE FINALIZA EVENTO DE ABANDONO DEL POZO LMNH-060S2.
RIG:
POZO:
CCDC-039
CUYABENO-D070
EN COMPLETACION
CYBD-070
MD (Pies):
8,550
TVD (Pies):
8,018.3
PROD.ESTIMADA: (BPPD)
DETALLE:
CIA. TRIPOINT WIRE LINE SACANDO CAÑONES NO DISPARADOS PARA CAMBIO.
RIG:
POZO:
H&P 121
PALO AZUL-N054
EN COMPLETACION
PALO AZUL-N054
MD (Pies):
10,353
TVD (Pies):
10,030.2
PROD.ESTIMADA: (BPPD)
DETALLE:
POOH CON BHA #13 DESDE 8804' HASTA 4500'
RIG:
POZO:
OCEAN SPUR
AMISTAD-015
EN COMPLETACION
AMS-015S1
MD (Pies):
10,696
TVD (Pies):
10,219.2
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO CIBP HASTA SUPERFICIE CON WIRELINE
RIG:
POZO:
SINOPEC 191
OSO-I140
EN COMPLETACION
OSOI-140
MD (Pies):
9,500
TVD (Pies):
9,396.4
PROD.ESTIMADA: (BPPD)
SIENDO LAS 09:00 HORAS DEL DIA 14 DE OCTUBRE DEL 2014 DIO INICIO A LAS OPERACIONES
DETALLE:
DE COMPLETACION DEL POZO OSOI-140.
ESPERANDO POR FRAGUE D/CEMENTO 48 HRS. (HASTA JUEVES 16-10-2014 A 00:00 HRS.)
RIG:
POZO:
SINOPEC 191
YURALPA NORESTE-E102
YRNE-102
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO POZO EN REVERSA @ 8525 ft CON 3.5 BPM Y 200 PSI.
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
RIG:
POZO:
CCDC-038
ARAZA-A007
ARAZA-A007
Página 2 de 9
Fecha de Impresión:
15/10/2014 8:01:55
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
FINALIZA SKIDDING DESDE EL POZO ARAZA A008 HACIA ARAZA A007
RIG:
POZO:
NABORS 794
JIVINO-E020
JVNE-020
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERO POR LUZ DEL DIA PARA CONTINUAR OPERACIONES
RIG:
POZO:
PDVSA-81
LAGO AGRIO-H060
LGAH-060
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
REALIZANDO REUNION DE SEGURIDAD Y OPERACIONAL PREVIO A CONTINUAR OPERACIONES DE
DETALLE:
TRASTEO
RIG:
POZO:
SINOPEC 119
COCA-K044
COCK-044
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
FINALIZÓ PRUEBAS DEL EQUIPO DE PERFORACIÓN Y CERRÓ EL EVENTO DE MOVILIZACIÓN
DETALLE:
HACIA EL POZO COCK 044.
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-A042
DRRA-042
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
INICA OPERACIONES DE PERFORACION DEL POZO DRAGO NORTE A-042 CON EL RIG SINOPEC
DETALLE:
169 EL MARTES 14 DE OCTUBRE DEL 2014 A LAS 18:00 HRS.
RIG:
POZO:
CCDC-036
LIMONCOCHA-H060H
LMNH-060R1
EN PERFORACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO BHA # 01 HASTA 6600' EST. EN DP DE 5-1/2" OD, MIDIENDO Y CALIBRANDO CADA
DETALLE:
STAND.
RIG:
POZO:
CCDC-038
ARAZA-A007
EN PERFORACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 9
Fecha de Impresión:
15/10/2014 8:01:55
ARAZA-A007
MD (Pies):
0
TVD (Pies):
0
PROD.ESTIMADA: (BPPD)
ARMANDO EN PARADAS 5" HWDP, 4 1/2IF, 19.3 LB/FT, LAVANDO CAJAS Y PINES SUBIENDO
DETALLE:
TUBO A TUBO DESDE LOS CABALLETES
RIG:
POZO:
CCDC-066
COCA-A054
EN PERFORACION
COCA-054
MD (Pies):
6,231
TVD (Pies):
5,736.5
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO BHA # 4 DIRECCIONAL SECCION 12 1/4".
RIG:
POZO:
CCDC-068
AUCA-K180
EN PERFORACION
ACAK-180
MD (Pies):
7,975
TVD (Pies):
7,464.5
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO HOYO DE 12 1/4" CON BHA#4 DIRECCIONAL Y BROCA PDC#4 @7975'
RIG:
POZO:
CCDC-069
AUCA-O068
EN PERFORACION
ACAO-068
MD (Pies):
10,832
TVD (Pies):
10,458.2
PROD.ESTIMADA: (BPPD)
DETALLE:
QUEBRANDO BHA # 5 DIRECCIONAL.
RIG:
POZO:
H&P 132
EDEN YUTURI-D183
EN PERFORACION
EDYD-183
MD (Pies):
7,573
TVD (Pies):
7,007.6
PROD.ESTIMADA: (BPPD)
DETALLE:
PREPARANDO EQUIPO PARA CORRIDA DE CASING DE 9 5/8"
RIG:
POZO:
NABORS 609
CHONTA SUR-A002
EN PERFORACION
CHSA-002
MD (Pies):
10,980
TVD (Pies):
9,881.4
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO RECIPROCANDO LA SARTA @ 9020 FT.
RIG:
POZO:
MD (Pies):
PDVSA-80
LAGO AGRIO-J052
LGAJ-052
10,650
EN PERFORACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 9
Fecha de Impresión:
15/10/2014 8:01:55
TVD (Pies):
10,351.4
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO SETTING TOOL @ 8300'
RIG:
POZO:
PETREX 5824
APAIKA-A012H
EN PERFORACION
APKA-012H
MD (Pies):
10,518
TVD (Pies):
6,121.5
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA # 12 DE CALIBRACION Y LIMPIEZA @ 9500 PIES OK.
RIG:
POZO:
SINOPEC 127
OSO-H119
EN PERFORACION
OSOH-119
MD (Pies):
8,620
TVD (Pies):
8,522.2
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO SECCION 12 1/4'' CON BHA # 5 DIRECCIONAL @ 8620 FT.
RIG:
POZO:
SINOPEC 128
AUCA-Q118
EN PERFORACION
ACAQ-118S1
MD (Pies):
10,080
TVD (Pies):
10,080
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO HOYO DE 8-1/2" SEGUN PROGRAMA A 10080'.
RIG:
POZO:
SINOPEC 129
OSO-A150
EN PERFORACION
OSOA-150
MD (Pies):
9,525
TVD (Pies):
8,034.4
PROD.ESTIMADA: (BPPD)
PERFORANDO CON BHA # 11 DIRECCIONAL + POWER DRIVE + ARC-8 + ADN-8 + BROCA PDC DE
DETALLE:
12-1/4" @ 9525' MD.
RIG:
POZO:
SINOPEC 156
AUCA-P175
EN PERFORACION
ACAP-175
MD (Pies):
6,428
TVD (Pies):
5,587.6
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA #3 CONVENCIONAL EN TUBERIA DE 5 1/2", DESDE SUPERFICIE HASTA 3600'.
RIG:
POZO:
SINOPEC 168
OSO-G099
EN PERFORACION
OSOG-099
MD (Pies):
5,920
TVD (Pies):
5,855.7
PROD.ESTIMADA: (BPPD)
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
DETALLE:
Página 5 de 9
Fecha de Impresión:
15/10/2014 8:01:55
BAJA CSG-13 3/8" K-55, 68 LB/PIE @ 2700 PIES.
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-A042
EN PERFORACION
DRRA-042
MD (Pies):
165
TVD (Pies):
165
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO REUNIÓN DE SEGURIDAD PARA CORRIDA DE CASING 20".
RIG:
POZO:
SINOPEC 191
OSO-I140
EN PERFORACION
OSOI-140
MD (Pies):
9,500
TVD (Pies):
9,396.4
PROD.ESTIMADA: (BPPD)
SIENDO LAS 09:00 HORAS DEL DIA 14 OCTUBRE 2014 SE DAN POR TERMINADAS LAS
DETALLE:
OPERACIONES DE PERFORACION DEL POZO OSOI-140
RIG:
POZO:
SINOPEC 248
CONONACO-I040
EN PERFORACION
CNOI-040
MD (Pies):
10,830
TVD (Pies):
10,571.1
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO 8-1/8" WASH PIPE DE BHA #13
RIG:
POZO:
HILONG 18
EDEN YUTURI-K124
EDYK-124
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
TEC CIA BAKER REALIZANDO EMPALME DE CABLE DE PODER BAJO TUBING HANGER 11" X 3000 X
DETALLE:
4 1/2" EUE + TEC CIA AZUL
PASA CABLE Y COLOCA RMS + MULTI PACK
RIG:
POZO:
CCDC-041
TAPI-004
EN WORKOVER
TAP-004
MD (Pies):
4,450
TVD (Pies):
4,450
PROD.ESTIMADA: (BPPD)
DETALLE:
EQUIPO CCDC 41 ESPERANDO LUZ DEL DIA PARA MOVILIZAR A SU BASE
RIG:
POZO:
CCDC-052
ARMADILLO A 001
ARMA-001
MD (Pies):
6,500
TVD (Pies):
6,500
PROD.ESTIMADA: (BPPD)
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
DETALLE:
Página 6 de 9
Fecha de Impresión:
15/10/2014 8:01:55
BAJANDO BHA DE LIMPIEZA CON HERRAMIENTA VACS TOOLS DE CÍA BAKER EN 3-1/2" IF DRILL
PIPE (13.3 #/FT, S-135), EN PARADAS MIDIENDO Y CALIBRANDO.
RIG:
POZO:
DYGOIL-30
SHUSHUFINDI-H238
EN WORKOVER
SHSH-238
MD (Pies):
9,440
TVD (Pies):
9,219.7
PROD.ESTIMADA: (BPPD)
ASENTANDO 7" x 3 1/2" PACKERS TIPO FH A 9422' Y 9256', CON 1500, 2000 Y 3000 PSI.
DETALLE:
LLENANDO CASING PARA PROBAR PACKERS.
RIG:
POZO:
GEOPETSA-01
LAGO AGRIO-013
LGA-013
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO COMPLETACION DE FONDO POWER OIL EN TUBERIA DE 3 1/2" EUE CLASE "B"
RIG:
POZO:
GEOPETSA-05
AUCA SUR-B008
ACSB-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
SACANDO BHA DE EVALUACION EN TUBERIA DE 3-1/2" EUE POR PARADAS. FUERA DEL POZO A
DETALLE:
LAS 06:00
RIG:
POZO:
GEOPETSA-06
LAGO AGRIO-E024
EN WORKOVER
LGAE-024
MD (Pies):
8,930
TVD (Pies):
8,930
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO RETRIVA MATIC PACKER EN 3 1/2" DP
RIG:
POZO:
HILONG 28
PAKA NORTE-A010
EN WORKOVER
PKNA-010
MD (Pies):
11,350
TVD (Pies):
9,649.8
PROD.ESTIMADA: (BPPD)
CIA. PETROTECH SLICK LINE RECUPERA 2.75" STD/VALVE DESDE 3 1/2" NO-GO @ 11301' FT
DETALLE:
(TERMINADO)
RIG:
POZO:
MD (Pies):
TVD (Pies):
KEY 80051
AGUARICO-C026
AGRC-026
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 7 de 9
Fecha de Impresión:
15/10/2014 8:01:55
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES D1050N EN 3 1/2" TUBERIA TSH BLUE CLASE B ,MIDIENDO , CALIBRANDO
DETALLE:
Y PROBANDO CON 3000 PSI CADA 40 TUBOS.
RIG:
POZO:
KEY 80057
SHUSHUFINDI-S107
EN WORKOVER
SHSS-107
MD (Pies):
3,500
TVD (Pies):
3,500
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJA BHA DE LIMPIEZA EN TANDEM EN 2-7/8" DRILL PIPE MIDIENDO EN PARADAS.
RIG:
POZO:
NABORS 813
EDEN YUTURI-H149H
EDYH-149H
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
TECNICO DE SLB DTR ARMAN BHA # 3 CON ACONDICIONADOR DE CASING SWAGE 8-1/8''(SIN
DETALLE:
TERMINAR)
RIG:
POZO:
NABORS 814
PALO AZUL-D034H
PLAD-034H
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO EQ. BES P47 BAKER-CENTRILIFT (122 STG, 504 HP) EN 3-1/2" EUE TUBERÍA 9.3 #/FT,
DETALLE:
L-80, COND-01, MIDIENDO, CALIBRANDO, PROBANDO CON 2000 PSI C/20 JTS, SUBIENDO DESDE
LOS CABALLETES, A LAS 06H00 DENTRO DEL POZO 3963 FT (120 JUNTAS + BHA + EQ. BES).
RIG:
POZO:
NABORS 819
LIMONCOCHA-G007
EN WORKOVER
LMNG-007
MD (Pies):
9,333.4
TVD (Pies):
9,333.4
PROD.ESTIMADA: (BPPD)
DETALLE:
DESARMANDO + RETIRANDO SUBESTRUCTURA DEL RIG.
RIG:
POZO:
SAXON 32
OSO-C014
EN WORKOVER
OSOC-014
MD (Pies):
9,490
TVD (Pies):
8,845.5
PROD.ESTIMADA: (BPPD)
DETALLE:
ABRIENDO CAMISA DE CIRCULACION DE 3 1/2" x 2.81" @ 9326'
RIG:
POZO:
MD (Pies):
SAXON 34
SHUARA-D036
SHAD-036
4,884
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 8 de 9
Fecha de Impresión:
15/10/2014 8:01:55
TVD (Pies):
4,884
PROD.ESTIMADA: (BPPD)
SACANDO EQUIPO BES D1050N EN 3 1/2" TBG EUE CLASE "B", PROBANDO CON 3000 PSI C/D 5
DETALLE:
PARADAS PRESION CAE 1000 PSI EN 5 MINUTOS, SIN ENCONTRAR FUGAS. CONTINUA CAYENDO
PRESION. FUERA DEL POZO 2400 PIES
RIG:
POZO:
SAXON 47
SECOYA-018
EN WORKOVER
SCY-018
MD (Pies):
9,230
TVD (Pies):
9,230
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA MOLEDOR EN 3 1/2" IF DRILL PIPE
RIG:
POZO:
SAXON 55
PICHINCHA-007
EN WORKOVER
PCH-007
MD (Pies):
3,771.9
TVD (Pies):
3,771.9
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO UNIDAD DE CÍA SCHLUMBERGER PARA SENTAR CON CABLE TAPÓN CIBP 7"
RIG:
POZO:
TRIBOILGAS-006
ARAZA-B004
EN WORKOVER
ARZA-004
MD (Pies):
5,000
TVD (Pies):
4,694
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES CENTRILIFT PF 3.2 XH6 EN 3 1/2" TSH BLUE TUBERIA CLASE "B",
SUBIENDO TUBO POR TUBO DESDE LOS CABALLETES MIDIENDO, CALIBRANDO Y PROBANDO
DETALLE:
CON 3000 PSI CADA 20 TUBOS.
DENTRO DEL POZO A LAS 06H00: 8500 PIES
RIG:
POZO:
TRIBOILGAS-101
TIPISHCA-A011
EN WORKOVER
TPSA-011
MD (Pies):
212.6
TVD (Pies):
212.6
PROD.ESTIMADA: (BPPD)
Bajando completacion de fondo en tuberia 3-1/2" eue clase "B" midiendo, calibrando y probando
DETALLE:
con 3000 psi cada 40 tubos, subiendo tubo x tubo desde los caballetes.
Dentro del pozo a las 06h00: 7000'
RIG:
POZO:
TRIBOILGAS-102
BOA-A001
EN WORKOVER
BOAA-001
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO LUZ DEL DÍA.
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
RIG:
POZO:
TRIBOILGAS-103
ANACONDA-A009
ANCA-009
Página 9 de 9
Fecha de Impresión:
15/10/2014 8:01:55
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
CIA. SOLIPET REEMPLAZANDO CARRETO # 1 (VACIO) POR CARRETO # 2 (1040´ DE CABLE
DETALLE:
ELECTRICO PLANO #4) EN UNIDAD SPOOLER
RIG:
POZO:
TRIBOILGAS-104
AUCA-005
EN WORKOVER
ACA-005
MD (Pies):
9,000
TVD (Pies):
9,000
PROD.ESTIMADA: (BPPD)
DETALLE:
INSTALAN TUBING HANGER DE 7 1 / 16 " X 3 1 / 2 " EN SARTA + PRUEBAN CON 3000 PSI OK.
RIG:
POZO:
TRIBOILGAS-107
VICTOR HUGO RUALES-E029
VHRE-029
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
RETIRANDO SUBESTRUCTURA
RIG:
POZO:
TRIBOILGAS-201
LAGO AGRIO-033
EN WORKOVER
LGA-033
MD (Pies):
2,590
TVD (Pies):
2,590
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA DE PESCA CON ARPON EN 3 1/2" DRIILL PIPE Y LLENANDO EL POZO NORMAL
RIG:
POZO:
TUSCANY 108
SECOYA-A047
SCYA-047
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:500 (BPPD)
CONTINUA BAJANDO EQUIPO BES REDA SN2600 101STG EN TBG DE 3 1/2" TSH BLUE CLASE "A",
DETALLE:
MIDIENDO, CALIBRANDO TUBO X TUBO, PROBANDO C/ 2500 PSI Y MEGANDO CABLE CADA 2000'.
DENTRO DEL POZO A LAS 06:00 HRS 5450' CON 168 TUB0S Y BHA
DESCRIPCION DE UNIDADES:
BPPD: Barriles de Petróleo por día