SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 9 Fecha de Impresión: 15/10/2014 8:01:55 OPERACIONES CON TORRES: 14/10/2014 06:00am AL 15/10/2014 06:00am RIG: POZO: CCDC-036 LIMONCOCHA-H060H LMNH-060HS2 ABANDONO MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: A LAS 18:30 DEL DÍA 14 DE OCTUBRE FINALIZA EVENTO DE ABANDONO DEL POZO LMNH-060S2. RIG: POZO: CCDC-039 CUYABENO-D070 EN COMPLETACION CYBD-070 MD (Pies): 8,550 TVD (Pies): 8,018.3 PROD.ESTIMADA: (BPPD) DETALLE: CIA. TRIPOINT WIRE LINE SACANDO CAÑONES NO DISPARADOS PARA CAMBIO. RIG: POZO: H&P 121 PALO AZUL-N054 EN COMPLETACION PALO AZUL-N054 MD (Pies): 10,353 TVD (Pies): 10,030.2 PROD.ESTIMADA: (BPPD) DETALLE: POOH CON BHA #13 DESDE 8804' HASTA 4500' RIG: POZO: OCEAN SPUR AMISTAD-015 EN COMPLETACION AMS-015S1 MD (Pies): 10,696 TVD (Pies): 10,219.2 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO CIBP HASTA SUPERFICIE CON WIRELINE RIG: POZO: SINOPEC 191 OSO-I140 EN COMPLETACION OSOI-140 MD (Pies): 9,500 TVD (Pies): 9,396.4 PROD.ESTIMADA: (BPPD) SIENDO LAS 09:00 HORAS DEL DIA 14 DE OCTUBRE DEL 2014 DIO INICIO A LAS OPERACIONES DETALLE: DE COMPLETACION DEL POZO OSOI-140. ESPERANDO POR FRAGUE D/CEMENTO 48 HRS. (HASTA JUEVES 16-10-2014 A 00:00 HRS.) RIG: POZO: SINOPEC 191 YURALPA NORESTE-E102 YRNE-102 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO POZO EN REVERSA @ 8525 ft CON 3.5 BPM Y 200 PSI. SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION RIG: POZO: CCDC-038 ARAZA-A007 ARAZA-A007 Página 2 de 9 Fecha de Impresión: 15/10/2014 8:01:55 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: FINALIZA SKIDDING DESDE EL POZO ARAZA A008 HACIA ARAZA A007 RIG: POZO: NABORS 794 JIVINO-E020 JVNE-020 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: ESPERO POR LUZ DEL DIA PARA CONTINUAR OPERACIONES RIG: POZO: PDVSA-81 LAGO AGRIO-H060 LGAH-060 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) REALIZANDO REUNION DE SEGURIDAD Y OPERACIONAL PREVIO A CONTINUAR OPERACIONES DE DETALLE: TRASTEO RIG: POZO: SINOPEC 119 COCA-K044 COCK-044 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) FINALIZÓ PRUEBAS DEL EQUIPO DE PERFORACIÓN Y CERRÓ EL EVENTO DE MOVILIZACIÓN DETALLE: HACIA EL POZO COCK 044. RIG: POZO: SINOPEC 169 DRAGO NORTE-A042 DRRA-042 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) INICA OPERACIONES DE PERFORACION DEL POZO DRAGO NORTE A-042 CON EL RIG SINOPEC DETALLE: 169 EL MARTES 14 DE OCTUBRE DEL 2014 A LAS 18:00 HRS. RIG: POZO: CCDC-036 LIMONCOCHA-H060H LMNH-060R1 EN PERFORACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO BHA # 01 HASTA 6600' EST. EN DP DE 5-1/2" OD, MIDIENDO Y CALIBRANDO CADA DETALLE: STAND. RIG: POZO: CCDC-038 ARAZA-A007 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 9 Fecha de Impresión: 15/10/2014 8:01:55 ARAZA-A007 MD (Pies): 0 TVD (Pies): 0 PROD.ESTIMADA: (BPPD) ARMANDO EN PARADAS 5" HWDP, 4 1/2IF, 19.3 LB/FT, LAVANDO CAJAS Y PINES SUBIENDO DETALLE: TUBO A TUBO DESDE LOS CABALLETES RIG: POZO: CCDC-066 COCA-A054 EN PERFORACION COCA-054 MD (Pies): 6,231 TVD (Pies): 5,736.5 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO BHA # 4 DIRECCIONAL SECCION 12 1/4". RIG: POZO: CCDC-068 AUCA-K180 EN PERFORACION ACAK-180 MD (Pies): 7,975 TVD (Pies): 7,464.5 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO HOYO DE 12 1/4" CON BHA#4 DIRECCIONAL Y BROCA PDC#4 @7975' RIG: POZO: CCDC-069 AUCA-O068 EN PERFORACION ACAO-068 MD (Pies): 10,832 TVD (Pies): 10,458.2 PROD.ESTIMADA: (BPPD) DETALLE: QUEBRANDO BHA # 5 DIRECCIONAL. RIG: POZO: H&P 132 EDEN YUTURI-D183 EN PERFORACION EDYD-183 MD (Pies): 7,573 TVD (Pies): 7,007.6 PROD.ESTIMADA: (BPPD) DETALLE: PREPARANDO EQUIPO PARA CORRIDA DE CASING DE 9 5/8" RIG: POZO: NABORS 609 CHONTA SUR-A002 EN PERFORACION CHSA-002 MD (Pies): 10,980 TVD (Pies): 9,881.4 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO RECIPROCANDO LA SARTA @ 9020 FT. RIG: POZO: MD (Pies): PDVSA-80 LAGO AGRIO-J052 LGAJ-052 10,650 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 4 de 9 Fecha de Impresión: 15/10/2014 8:01:55 TVD (Pies): 10,351.4 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO SETTING TOOL @ 8300' RIG: POZO: PETREX 5824 APAIKA-A012H EN PERFORACION APKA-012H MD (Pies): 10,518 TVD (Pies): 6,121.5 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA # 12 DE CALIBRACION Y LIMPIEZA @ 9500 PIES OK. RIG: POZO: SINOPEC 127 OSO-H119 EN PERFORACION OSOH-119 MD (Pies): 8,620 TVD (Pies): 8,522.2 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO SECCION 12 1/4'' CON BHA # 5 DIRECCIONAL @ 8620 FT. RIG: POZO: SINOPEC 128 AUCA-Q118 EN PERFORACION ACAQ-118S1 MD (Pies): 10,080 TVD (Pies): 10,080 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO HOYO DE 8-1/2" SEGUN PROGRAMA A 10080'. RIG: POZO: SINOPEC 129 OSO-A150 EN PERFORACION OSOA-150 MD (Pies): 9,525 TVD (Pies): 8,034.4 PROD.ESTIMADA: (BPPD) PERFORANDO CON BHA # 11 DIRECCIONAL + POWER DRIVE + ARC-8 + ADN-8 + BROCA PDC DE DETALLE: 12-1/4" @ 9525' MD. RIG: POZO: SINOPEC 156 AUCA-P175 EN PERFORACION ACAP-175 MD (Pies): 6,428 TVD (Pies): 5,587.6 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA #3 CONVENCIONAL EN TUBERIA DE 5 1/2", DESDE SUPERFICIE HASTA 3600'. RIG: POZO: SINOPEC 168 OSO-G099 EN PERFORACION OSOG-099 MD (Pies): 5,920 TVD (Pies): 5,855.7 PROD.ESTIMADA: (BPPD) SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION DETALLE: Página 5 de 9 Fecha de Impresión: 15/10/2014 8:01:55 BAJA CSG-13 3/8" K-55, 68 LB/PIE @ 2700 PIES. RIG: POZO: SINOPEC 169 DRAGO NORTE-A042 EN PERFORACION DRRA-042 MD (Pies): 165 TVD (Pies): 165 PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO REUNIÓN DE SEGURIDAD PARA CORRIDA DE CASING 20". RIG: POZO: SINOPEC 191 OSO-I140 EN PERFORACION OSOI-140 MD (Pies): 9,500 TVD (Pies): 9,396.4 PROD.ESTIMADA: (BPPD) SIENDO LAS 09:00 HORAS DEL DIA 14 OCTUBRE 2014 SE DAN POR TERMINADAS LAS DETALLE: OPERACIONES DE PERFORACION DEL POZO OSOI-140 RIG: POZO: SINOPEC 248 CONONACO-I040 EN PERFORACION CNOI-040 MD (Pies): 10,830 TVD (Pies): 10,571.1 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO 8-1/8" WASH PIPE DE BHA #13 RIG: POZO: HILONG 18 EDEN YUTURI-K124 EDYK-124 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) TEC CIA BAKER REALIZANDO EMPALME DE CABLE DE PODER BAJO TUBING HANGER 11" X 3000 X DETALLE: 4 1/2" EUE + TEC CIA AZUL PASA CABLE Y COLOCA RMS + MULTI PACK RIG: POZO: CCDC-041 TAPI-004 EN WORKOVER TAP-004 MD (Pies): 4,450 TVD (Pies): 4,450 PROD.ESTIMADA: (BPPD) DETALLE: EQUIPO CCDC 41 ESPERANDO LUZ DEL DIA PARA MOVILIZAR A SU BASE RIG: POZO: CCDC-052 ARMADILLO A 001 ARMA-001 MD (Pies): 6,500 TVD (Pies): 6,500 PROD.ESTIMADA: (BPPD) EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION DETALLE: Página 6 de 9 Fecha de Impresión: 15/10/2014 8:01:55 BAJANDO BHA DE LIMPIEZA CON HERRAMIENTA VACS TOOLS DE CÍA BAKER EN 3-1/2" IF DRILL PIPE (13.3 #/FT, S-135), EN PARADAS MIDIENDO Y CALIBRANDO. RIG: POZO: DYGOIL-30 SHUSHUFINDI-H238 EN WORKOVER SHSH-238 MD (Pies): 9,440 TVD (Pies): 9,219.7 PROD.ESTIMADA: (BPPD) ASENTANDO 7" x 3 1/2" PACKERS TIPO FH A 9422' Y 9256', CON 1500, 2000 Y 3000 PSI. DETALLE: LLENANDO CASING PARA PROBAR PACKERS. RIG: POZO: GEOPETSA-01 LAGO AGRIO-013 LGA-013 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACANDO COMPLETACION DE FONDO POWER OIL EN TUBERIA DE 3 1/2" EUE CLASE "B" RIG: POZO: GEOPETSA-05 AUCA SUR-B008 ACSB-008 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO BHA DE EVALUACION EN TUBERIA DE 3-1/2" EUE POR PARADAS. FUERA DEL POZO A DETALLE: LAS 06:00 RIG: POZO: GEOPETSA-06 LAGO AGRIO-E024 EN WORKOVER LGAE-024 MD (Pies): 8,930 TVD (Pies): 8,930 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO RETRIVA MATIC PACKER EN 3 1/2" DP RIG: POZO: HILONG 28 PAKA NORTE-A010 EN WORKOVER PKNA-010 MD (Pies): 11,350 TVD (Pies): 9,649.8 PROD.ESTIMADA: (BPPD) CIA. PETROTECH SLICK LINE RECUPERA 2.75" STD/VALVE DESDE 3 1/2" NO-GO @ 11301' FT DETALLE: (TERMINADO) RIG: POZO: MD (Pies): TVD (Pies): KEY 80051 AGUARICO-C026 AGRC-026 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 7 de 9 Fecha de Impresión: 15/10/2014 8:01:55 PROD.ESTIMADA: (BPPD) BAJANDO EQUIPO BES D1050N EN 3 1/2" TUBERIA TSH BLUE CLASE B ,MIDIENDO , CALIBRANDO DETALLE: Y PROBANDO CON 3000 PSI CADA 40 TUBOS. RIG: POZO: KEY 80057 SHUSHUFINDI-S107 EN WORKOVER SHSS-107 MD (Pies): 3,500 TVD (Pies): 3,500 PROD.ESTIMADA: (BPPD) DETALLE: BAJA BHA DE LIMPIEZA EN TANDEM EN 2-7/8" DRILL PIPE MIDIENDO EN PARADAS. RIG: POZO: NABORS 813 EDEN YUTURI-H149H EDYH-149H EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) TECNICO DE SLB DTR ARMAN BHA # 3 CON ACONDICIONADOR DE CASING SWAGE 8-1/8''(SIN DETALLE: TERMINAR) RIG: POZO: NABORS 814 PALO AZUL-D034H PLAD-034H EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO EQ. BES P47 BAKER-CENTRILIFT (122 STG, 504 HP) EN 3-1/2" EUE TUBERÍA 9.3 #/FT, DETALLE: L-80, COND-01, MIDIENDO, CALIBRANDO, PROBANDO CON 2000 PSI C/20 JTS, SUBIENDO DESDE LOS CABALLETES, A LAS 06H00 DENTRO DEL POZO 3963 FT (120 JUNTAS + BHA + EQ. BES). RIG: POZO: NABORS 819 LIMONCOCHA-G007 EN WORKOVER LMNG-007 MD (Pies): 9,333.4 TVD (Pies): 9,333.4 PROD.ESTIMADA: (BPPD) DETALLE: DESARMANDO + RETIRANDO SUBESTRUCTURA DEL RIG. RIG: POZO: SAXON 32 OSO-C014 EN WORKOVER OSOC-014 MD (Pies): 9,490 TVD (Pies): 8,845.5 PROD.ESTIMADA: (BPPD) DETALLE: ABRIENDO CAMISA DE CIRCULACION DE 3 1/2" x 2.81" @ 9326' RIG: POZO: MD (Pies): SAXON 34 SHUARA-D036 SHAD-036 4,884 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 8 de 9 Fecha de Impresión: 15/10/2014 8:01:55 TVD (Pies): 4,884 PROD.ESTIMADA: (BPPD) SACANDO EQUIPO BES D1050N EN 3 1/2" TBG EUE CLASE "B", PROBANDO CON 3000 PSI C/D 5 DETALLE: PARADAS PRESION CAE 1000 PSI EN 5 MINUTOS, SIN ENCONTRAR FUGAS. CONTINUA CAYENDO PRESION. FUERA DEL POZO 2400 PIES RIG: POZO: SAXON 47 SECOYA-018 EN WORKOVER SCY-018 MD (Pies): 9,230 TVD (Pies): 9,230 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA MOLEDOR EN 3 1/2" IF DRILL PIPE RIG: POZO: SAXON 55 PICHINCHA-007 EN WORKOVER PCH-007 MD (Pies): 3,771.9 TVD (Pies): 3,771.9 PROD.ESTIMADA: (BPPD) DETALLE: ESPERANDO UNIDAD DE CÍA SCHLUMBERGER PARA SENTAR CON CABLE TAPÓN CIBP 7" RIG: POZO: TRIBOILGAS-006 ARAZA-B004 EN WORKOVER ARZA-004 MD (Pies): 5,000 TVD (Pies): 4,694 PROD.ESTIMADA: (BPPD) BAJANDO EQUIPO BES CENTRILIFT PF 3.2 XH6 EN 3 1/2" TSH BLUE TUBERIA CLASE "B", SUBIENDO TUBO POR TUBO DESDE LOS CABALLETES MIDIENDO, CALIBRANDO Y PROBANDO DETALLE: CON 3000 PSI CADA 20 TUBOS. DENTRO DEL POZO A LAS 06H00: 8500 PIES RIG: POZO: TRIBOILGAS-101 TIPISHCA-A011 EN WORKOVER TPSA-011 MD (Pies): 212.6 TVD (Pies): 212.6 PROD.ESTIMADA: (BPPD) Bajando completacion de fondo en tuberia 3-1/2" eue clase "B" midiendo, calibrando y probando DETALLE: con 3000 psi cada 40 tubos, subiendo tubo x tubo desde los caballetes. Dentro del pozo a las 06h00: 7000' RIG: POZO: TRIBOILGAS-102 BOA-A001 EN WORKOVER BOAA-001 MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: ESPERANDO LUZ DEL DÍA. SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION RIG: POZO: TRIBOILGAS-103 ANACONDA-A009 ANCA-009 Página 9 de 9 Fecha de Impresión: 15/10/2014 8:01:55 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CIA. SOLIPET REEMPLAZANDO CARRETO # 1 (VACIO) POR CARRETO # 2 (1040´ DE CABLE DETALLE: ELECTRICO PLANO #4) EN UNIDAD SPOOLER RIG: POZO: TRIBOILGAS-104 AUCA-005 EN WORKOVER ACA-005 MD (Pies): 9,000 TVD (Pies): 9,000 PROD.ESTIMADA: (BPPD) DETALLE: INSTALAN TUBING HANGER DE 7 1 / 16 " X 3 1 / 2 " EN SARTA + PRUEBAN CON 3000 PSI OK. RIG: POZO: TRIBOILGAS-107 VICTOR HUGO RUALES-E029 VHRE-029 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: RETIRANDO SUBESTRUCTURA RIG: POZO: TRIBOILGAS-201 LAGO AGRIO-033 EN WORKOVER LGA-033 MD (Pies): 2,590 TVD (Pies): 2,590 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA DE PESCA CON ARPON EN 3 1/2" DRIILL PIPE Y LLENANDO EL POZO NORMAL RIG: POZO: TUSCANY 108 SECOYA-A047 SCYA-047 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:500 (BPPD) CONTINUA BAJANDO EQUIPO BES REDA SN2600 101STG EN TBG DE 3 1/2" TSH BLUE CLASE "A", DETALLE: MIDIENDO, CALIBRANDO TUBO X TUBO, PROBANDO C/ 2500 PSI Y MEGANDO CABLE CADA 2000'. DENTRO DEL POZO A LAS 06:00 HRS 5450' CON 168 TUB0S Y BHA DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día
© Copyright 2024