SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 1 de 7
Fecha de Impresión:
26/02/2015 7:20:42
OPERACIONES CON TORRES: 25/02/2015 06:00am AL 26/02/2015 06:00am
RIG:
POZO:
HILONG 17
PAYAMINO-G025
EN COMPLETACION
PYMG-025
MD (Pies):
9,500
TVD (Pies):
9,023.2
PROD.ESTIMADA: (BPPD)
DETALLE:
CONTINUA ESPERANDO POR FRAGUE DE CEMENTO +/- 60 HORAS.
RIG:
POZO:
OCEAN SPUR
AMISTAD-010
AMS-010
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
EN ESPERA DE LUZ DEL DÍA PARA REALIZAR INMERSIÓN POR PARTE DE LOS BUZOS Y
DETALLE:
RECUPERAR TRASH COVER DESDE POZO AMISTAD 10.
RIG:
POZO:
SAXON 47
ATACAPI-001
ATC-001R1
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
RIG EN STAND-BY A LA ESPERA DE CARGAS DE CÍA. BAKER PARA PUNZAR ARENAS "Ti"
DETALLE:
INTERVALOS 9790'-9809' (19'); 9814'-9831' (17') Y "Ts" INTERVALO 9779'-9788' (9')
RIG:
POZO:
SINOPEC 119
COCA-K046
EN COMPLETACION
COCK-046
MD (Pies):
206
TVD (Pies):
206
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJA HERRAMIENTA EASYCUT SJ PERFORATOR CON TUBERIA DE 3-1/2" TSH (1X1) A 10919'.
RIG:
POZO:
SINOPEC 127
OSO-H123
EN COMPLETACION
OSOH-123
MD (Pies):
10,426
TVD (Pies):
9,428.4
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO POR 48 HRS DE FRAGUADO.
RIG:
POZO:
CCDC-036
PAKA NORTE-A017
EN PERFORACION
PKNA-017
MD (Pies):
11,540
TVD (Pies):
9,984.5
PROD.ESTIMADA: (BPPD)
CIA. SCHLUMBERGER BAJA HERRAMIENTA DE REGISTROS AIT - PEX - JAR (ALTA RESOLUCIÓN)
DETALLE:
DESDE SUPERFICIE HASTA 1700'
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 2 de 7
Fecha de Impresión:
26/02/2015 7:20:42
RIG:
POZO:
CCDC-038
TAPI-C010
EN PERFORACION
TAPC-010
MD (Pies):
190
TVD (Pies):
190
PROD.ESTIMADA: (BPPD)
PERFORANDO SECCIÓN DE 26" ROTANDO CON BHA # 01 CONVENCIONAL Y BROCA TRICÓNICA
DETALLE:
@ 190'
RIG:
POZO:
CCDC-039
CUYABENO-C068
EN PERFORACION
CYBC-068
MD (Pies):
7,802
TVD (Pies):
7,002.5
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO CASING DE 9-5/8" @ 6131 FT
RIG:
POZO:
CCDC-066
COCA-A057H
EN PERFORACION
COCA-057H
MD (Pies):
11,291
TVD (Pies):
9,484.5
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO SECCIÓN DE 6-1/8" CON BHA # 10 DIRECCIONAL @ 11480'.
RIG:
POZO:
CCDC-068
AUCA-K182
EN PERFORACION
ACAK-182
MD (Pies):
6,322
TVD (Pies):
6,105.4
PROD.ESTIMADA: (BPPD)
PERFORA ROTANDO SECCION DE 12 1/4" CON BHA # 3 DIRECCIONAL Y BROCA PDC DE 12 1/4"
DETALLE:
HASTA 6322 FT
RIG:
POZO:
NABORS 609
RUMIYACU-A006
EN PERFORACION
RMYA-006
MD (Pies):
8,800
TVD (Pies):
8,566.6
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO ROTANDO @ 8800'
RIG:
POZO:
SINOPEC 128
AUCA-Q164
EN PERFORACION
ACAQ-164
MD (Pies):
6,913
TVD (Pies):
6,566.7
PROD.ESTIMADA: (BPPD)
PERFORANDO ROTANDO CON BHA # 03 DIRECCIONAL Y 12 1/4" BROCA PDC, MANTENIENDO
DETALLE:
TANGENTE @ 6913'
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 7
Fecha de Impresión:
26/02/2015 7:20:42
RIG:
POZO:
SINOPEC 156
AUCA-P178
EN PERFORACION
ACAP-178
MD (Pies):
9,930
TVD (Pies):
9,587.2
PROD.ESTIMADA: (BPPD)
DETALLE:
INSTALA BRAZOS DE TOP DRIVE + ELEVADORES + ARMANDO WASHING TOOL
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-E062
EN PERFORACION
DRRE-062
MD (Pies):
10,369
TVD (Pies):
8,948
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO SECCION 12 1/4" CON BHA DIRACCIONAL # 5 Y BROCA PDC @ 10369 FT
RIG:
POZO:
SINOPEC 191
OSO-I141
EN PERFORACION
OSOI-141
MD (Pies):
741
TVD (Pies):
741
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO BHA # 2 DD S/TERMINAR
RIG:
POZO:
SINOPEC 220
OSO-G100
EN PERFORACION
OSOG-100
MD (Pies):
4,790
TVD (Pies):
4,697.1
PROD.ESTIMADA: (BPPD)
DETALLE:
REPARANDO FRENO HIDRAULICO DEL TOP DRIVE ACTIVIDAD EN PROCESO
RIG:
POZO:
HILONG 18
EDEN YUTURI-J077
EDYJ-077
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
DESARMANDO COMPLETACION DE FONDO ( SIN TERMINAR).
RIG:
POZO:
CCDC-052
CHONTA ESTE-A003
CHEA-003
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
TÉCNICO DE BAKER FISHING REALIZANDO MANIOBRAS PARA ENGANCHAR PESCADO.
RIG:
POZO:
DYGOIL-30
AGUARICO-A011
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 7
Fecha de Impresión:
26/02/2015 7:20:42
AGRA-011
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
DYGOIL SL. REALIZA REUNIÓN DE SEGURIDAD, ABRE 3 1/2" CAMISA A 7581'.
RIG:
POZO:
GEOPETSA-01
PARAHUACU-A021
EN WORKOVER
PRHA-021
MD (Pies):
572.2
TVD (Pies):
572
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO TUBERIA DE 3 1/2" EUE, CLASE "B2 PUNTA LIBRE EN PARADAS EN LA TORRE
RIG:
POZO:
GEOPETSA-05
GUANTA-A001
EN WORKOVER
GNTA-001
MD (Pies):
8,283
TVD (Pies):
8,283
PROD.ESTIMADA: (BPPD)
SACANDO BHA MOLEDOR EN 2 7/8" DRIL PIPE EN PARADAS HACIA LA TORRE. FUERA DEL POZO:
DETALLE:
1000 FT @ 06H00 HRS
RIG:
POZO:
GEOPETSA-06
LAGO AGRIO-034
EN WORKOVER
LGA-034
MD (Pies):
9,867
TVD (Pies):
9,867
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO EL POZO EN DIRECTA.
RIG:
POZO:
HILONG 28
PALMAR OESTE-A008
PLOA-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO BHA DE PRODUCCION SOBRE EQUIPO BES, AVANCE 50%.
RIG:
POZO:
KEY 80051
SHUSHUFINDI-014
EN WORKOVER
SHS-014
MD (Pies):
8,828
TVD (Pies):
8,828
PROD.ESTIMADA: (BPPD)
DETALLE:
MOLIENDO Y LIMPIANDO ESCOMBROS A 8804' HASTA 8819' ( 15')
RIG:
POZO:
MD (Pies):
KEY 80057
SHUSHUFINDI-I133
SHSI-133
1,666.3
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 5 de 7
Fecha de Impresión:
26/02/2015 7:20:42
TVD (Pies):
1,628.6
PROD.ESTIMADA: (BPPD)
DETALLE:
CONTINUA BAJANDO EQUIPO BES REDA SN-2600 EN 3-1/2" TUBERIA TSH BLUE
RIG:
POZO:
NABORS 794
PALO AZUL-N049H
EN WORKOVER
PLAN-049HS1
MD (Pies):
12,047
TVD (Pies):
10,062.9
PROD.ESTIMADA: (BPPD)
SACANDO BHA DE LIMPIEZA EN TANDEM 9 5/8'' Y 7'' EN 5 1/2" IF Y 3 1/2'' IF DRILL. A LAS 06:00
DETALLE:
FUERA DE POZO 9500 FT (88 PARADAS DE 5 1/2'' DP + 42 PARADAS DE HW 4 1/2'')
RIG:
POZO:
NABORS 813
AUCA SUR-A018
ACSA-018
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
TÉCNICO DE CÍA. BAKER REALIZÁ EMPALME DE CABLE AL TERCER CARRETO @ 7540'
RIG:
POZO:
NABORS 814
PALO AZUL-B010
EN WORKOVER
PLAB-010S1
MD (Pies):
0
TVD (Pies):
0
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES P18 BAKER-CENTRILIFT (402 STG, 270 HP) EN 2-7/8" EUE TBG 6.5 LPP,
DETALLE:
L-80, R2 WSP, CON-01 SUBIENDO DESDE LOS CABALLETES, A LAS 06H00 DENTRO DEL POZO
1720 FT (EQ. BES + BHA + 48 JUNTAS).
RIG:
POZO:
NABORS 815
OSO-B076
EN WORKOVER
OSOB-076
MD (Pies):
600
TVD (Pies):
599.9
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO PRUEBA DE ASENTAMIENTO DE PACKER 9 5/8" x 3 1/2" FH BAKER CON 600 PSI.
RIG:
POZO:
PETROTECH 04
AUCA-G077
EN WORKOVER
ACAG-077
MD (Pies):
1,931
TVD (Pies):
1,888.3
PROD.ESTIMADA: (BPPD)
DETALLE:
RIG:
POZO:
MD (Pies):
SAXON 53
EDEN YUTURI-F117
EDYF-117
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 6 de 7
Fecha de Impresión:
26/02/2015 7:20:42
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO ORDENES PARA CONTINUAR OPERACIONES
RIG:
POZO:
SAXON 55
ATACAPI-C023
ATCC-023
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:200 (BPPD)
DETALLE:
ESPERANDO VACUUM PARA LLENAR TQS. CON AGUA FRESCA
RIG:
POZO:
SINOPEC-905
EDEN YUTURI-G045
EN WORKOVER
EDYG-045
MD (Pies):
7,903
TVD (Pies):
7,431.7
PROD.ESTIMADA: (BPPD)
DETALLE:
ARAMANDO BHA DE DISPARO CON CAÑONES TCP 41/2"
RIG:
POZO:
TRIBOILGAS-006
ARAZA-A005
EN WORKOVER
ARZA-005
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:150 (BPPD)
DETALLE:
FILTRAN 800 BARRILES DE AGUA FRESCA A 3.8 NTU
RIG:
POZO:
TRIBOILGAS-101
CUYABENO-G051
CYBG-051
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
POR SEGURIDAD ESPERANDO LUZ DEL DIA PARA MOVILIZAR EQUIPO ( TRIBOILGAS RIG-101 )
RIG:
POZO:
TRIBOILGAS-102
YULEBRA-A008
YLBA-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
SACANDO BLOQUE IMPRESOR 5 3/4'' EN TUBERIA 3 1/2'' EUE, N 80, 9.3#, CLASE B, 1200 FT
DETALLE:
FUERA DEL POZO.
RIG:
POZO:
TRIBOILGAS-105
DRAGO NORTE-A011
DRRA-011
MD (Pies):
9,796.4
TVD (Pies):
9,409.6
PROD.ESTIMADA: (BPPD)
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
DETALLE:
Página 7 de 7
Fecha de Impresión:
26/02/2015 7:20:42
EVALUANDO ARENA "UI" CON BOMBA JET 1O J DE CIA PAM Y UNIDAD DE CIA SERTECPET AL
TANQUE BOTA DEL RIG EN LOCACION
RIG:
POZO:
TRIBOILGAS-107
VICTOR HUGO RUALES-009
EN WORKOVER
VHR-009
MD (Pies):
3,000
TVD (Pies):
3,000
PROD.ESTIMADA: (BPPD)
Arma setting tool acoplado 7" CIBP a herramientas GR-CCL + Baja, correlaciona profundidad +
DETALLE:
asienta 7" CIBP a 7940'. Saca setting tool + desarma equipo.
DESCRIPCION DE UNIDADES:
BPPD: Barriles de Petróleo por día