SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 7 Fecha de Impresión: 14/01/2015 7:23:2 OPERACIONES CON TORRES: 13/01/2015 06:00am AL 14/01/2015 06:00am RIG: POZO: CCDC-066 COCA-A056 EN COMPLETACION COCA-056 MD (Pies): 11,600 TVD (Pies): 9,798.2 PROD.ESTIMADA: (BPPD) REALIZANDO REUNIÓN DE SEGURIDAD PRE-OPERACIONAL PREVIO AL ARMADO DEL BHA DE DETALLE: PESCA. RIG: POZO: GEOPETSA-05 GUANTA-E046 EN COMPLETACION GNTE-046 MD (Pies): 10,696 TVD (Pies): 10,265.2 PROD.ESTIMADA: (BPPD) DETALLE: CIA BAKER PREPARA 250 BLS DE FLUIDO DE CONTROL RIG: POZO: SAXON 32 ATACAPI-G032 ATCG-032 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJA BHA # 05 DE EVALUACIÓN CON PACKERS DE CIA (WTF) EN TUBERÍA 3-1/2 TSHW533 DETALLE: MIDIENDO CALIBRANDO EN PARADAS DESDE LA TORRE UTILIZA EQUIPO DE TORQUE DE CIA ITS APLICA EL TORQUE ADECUADO 3400 LBS/FT. A LAS 06h00: 2150' BHA CON 16 PARADAS. RIG: POZO: SAXON 47 SECOYA-020 SCY-020R1 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACANDO DP 2 7/8" QUEBRANDO A CABALLETES FUERA DEL POZO 4500' RIG: POZO: SINOPEC 119 COCA-K045 EN COMPLETACION COCK-045 MD (Pies): 11,956 TVD (Pies): 9,743.2 PROD.ESTIMADA: (BPPD) BAJANDO BHA No 1 DE LIMPIEZA (BROCA DE 8 1/2" TRICONICA (SIN JETS) + BOOT BASKET DE DETALLE: 7" + BIT SUB + SCRAPER ULTRA CLEAN DE 9-5/8" + GRABITZ MAGNET DE 6-1/2" + BRUSH ULTRA CLEAN DE 9-5/8") @ 11000'. RIG: POZO: MD (Pies): TVD (Pies): SINOPEC 128 AUCA-Q174 ACAQ-174 11,380 11,057.6 EN COMPLETACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 2 de 7 Fecha de Impresión: 14/01/2015 7:23:2 PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO EMPALME QUICK CONNECTOR EN MESA A 10168' RIG: POZO: SINOPEC 248 CONONACO-I041 EN COMPLETACION CNOI-041 MD (Pies): 10,668 TVD (Pies): 10,607.4 PROD.ESTIMADA: (BPPD) DETALLE: REALIZA EMPATE DE CABLE DE POTENCIA BAJO 11" HANGER. RIG: POZO: CCDC-038 TAPI-C014 TAPC-014 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) ESPERANDO LUZ DEL DIA PARA CONTINUAR DESARMANDO, MOVILIZANDO Y ARMANDO EQUIPO DETALLE: DESDE EL POZO TAPI B-016 S1 HACIA EL POZO TAPI C-014 RIG: POZO: NABORS 609 RUMIYACU-A005 EN MOVILIZACION RMYA-005 MD (Pies): 11,449.7 TVD (Pies): 11,449.7 PROD.ESTIMADA: (BPPD) RDS + VERIFICAN QUE TODAS LAS PARTES ENSAMBLADAS Y CONEXIONES DEL MÁSTIL SE DETALLE: ENCUENTREN PERFECTAMENTE REALIZADAS PREVIO AL IZADO DEL MÁSTIL; DESARMADO: 100%, MOVILIZADO: 98%, ARMADO: 78% RIG: POZO: SINOPEC 191 OSO-I005I OSOI-005I EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) ESPERANDO LUZ DEL DIA PARA CONTINUAR CON EL DESARME Y EL ARMADO DEL TALADRO. DETALLE: EQUIPO DESARMADO 75%, ARMADO 10%. RIG: POZO: CCDC-069 AUCA-O156 EN PERFORACION ACAO-156 MD (Pies): 9,029 TVD (Pies): 8,465.8 PROD.ESTIMADA: (BPPD) DETALLE: QUEBRANDO BHA # 4 DD SIN TERMINAR RIG: POZO: MD (Pies): OCEAN SPUR AMISTAD-A023 AMSA-023S1 11,110 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 7 Fecha de Impresión: 14/01/2015 7:23:2 TVD (Pies): 10,560.9 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA#4 CONVENCIONAL A 1900FT RIG: POZO: PTX 3 SECOYA-C049 EN PERFORACION SCYC-049 MD (Pies): 10,450 TVD (Pies): 10,450 PROD.ESTIMADA: (BPPD) PERFORÓ SECCIÓN DE 8 1/2" HASTA TD DEL POZO A 10450 FT, CIRCULANDO EN FONDO, PREVIO DETALLE: A VIAJE DE CALIBRE. RIG: POZO: SINOPEC 119 COCA-K045 EN PERFORACION COCK-045 MD (Pies): 11,957 TVD (Pies): 9,744 PROD.ESTIMADA: (BPPD) DETALLE: INICIA EL EVENTO DE COMPLETACIÓN DEL POZO COCA K-045. RIG: POZO: SINOPEC 127 OSO-H122 EN PERFORACION OSOH-122 MD (Pies): 9,405 TVD (Pies): 9,064.5 PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO CEMENTACION DE CASING DE 9-5/8" RIG: POZO: SINOPEC 156 AUCA-P177 EN PERFORACION ACAP-177 MD (Pies): 5,862 TVD (Pies): 5,668.5 PROD.ESTIMADA: (BPPD) DETALLE: BAJA BHA DIRECCIONAL # 3 CON BROCA PDC DE 16" 2R DESDE 4200' HASTA 5862'. RIG: POZO: SINOPEC 169 DRAGO NORTE-D053 EN PERFORACION DRRD-053 MD (Pies): 9,032 TVD (Pies): 8,727.6 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO BHA DIRECCIONAL CON BROCA PDC DE 8-1/2" RIG: POZO: TUSCANY-102 ATACAPI-001 ATC-001R1 MD (Pies): 0 TVD (Pies): 0 PROD.ESTIMADA: (BPPD) EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION DETALLE: BAJA BHA # 06 CON FASTRACK TRI MILL @ 4600' RIG: POZO: HILONG 18 EDEN YUTURI-B047 EDYB-047 Página 4 de 7 Fecha de Impresión: 14/01/2015 7:23:2 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO BHA PARA RECUPERAR ARENA Y RESIDUOS CON SAND BAYDER EN 3-½" IF DRILL DETALLE: PIPE EN PARADAS A LAS 06:00 HRS DENTRO DEL POZO 4316 FT CON 68 PARADAS + BHA RIG: POZO: CCDC-051 GACELA-F006 EN WORKOVER GCLF-006 MD (Pies): 4,100 TVD (Pies): 4,100 PROD.ESTIMADA: (BPPD) BAJANDO COMPLETACION DEFINITIVA DE B. H. EN 3 1/2" TBG THS BUE, MIDIENDO, DETALLE: CALIBRANDO Y PROBANDO 06:00 HRS DENTRO DEL POZO 2245' (60 JTS). RIG: POZO: CCDC-052 CONONACO-009 EN WORKOVER CNO-009 MD (Pies): 9,998 TVD (Pies): 9,998 PROD.ESTIMADA: (BPPD) FINALIZAN OPERACIONES DE WO-17 CON RIG CCDC-52 EN POZO CNO-009 EL 14 DE ENERO DEL DETALLE: 2014 @ LAS 06H00 RIG: POZO: DYGOIL-30 AGUARICO OESTE-001 EN WORKOVER AGO-001 MD (Pies): 9,419 TVD (Pies): 9,419 PROD.ESTIMADA: (BPPD) CONTINUA EVALUANDO "HS" CON JET 10-I Y MTU DE SERTECPET AL TANQUE BOTA DEL RIG, SIN DETALLE: ELEMENTOS. RIG: POZO: GEOPETSA-01 GUANTA-G030 EN WORKOVER GNTG-030 MD (Pies): 10,220 TVD (Pies): 9,996.4 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO CASIGN TUBING @ 10220' CON FLUIDO DE CONTROL DE 8.3 LPG RIG: POZO: MD (Pies): GEOPETSA-04 PARAHUACU-001 PRH-001 7,943.5 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 5 de 7 Fecha de Impresión: 14/01/2015 7:23:2 TVD (Pies): 7,943.5 PROD.ESTIMADA: (BPPD) MOLIENDO RETENEDOR Y CEMENTO CON 4-3/4" JUNK MIL DE CIA SLB, DESDE 8743 FT HASTA DETALLE: 8815 FT TOTAL MOLIDOS 72 FT. RIG: POZO: HILONG 28 LIMONCOCHA-L028 LMNL-028 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) POOH EQUIPO BES FLEX 10 / 119 ETAPAS DE LA CIA BAKER EN TUBERIA DE 3½" SEC QUEBRANDO JT X JT HASTA LOS CABALLETES + CIA H-LL RETIRANDO PROTECTORES CANNON + DETALLE: LLENANDO EL POZO CON SALMUERAS DE 8,39 PPG CADA 20 JUNTAS CON 2 BLS.TOTAL 100 JUNTAS FUERA DE POZO RIG: POZO: KEY 80051 SHUSHUFINDI-036 EN WORKOVER SHS-036 MD (Pies): 9,135 TVD (Pies): 9,135 PROD.ESTIMADA: (BPPD) A LAS 06:00 HRS POOH BHA DE LIMPIEZA EN 3-1/2" TBG EUE CLASE "B" EN PARADAS. FUERA DETALLE: DEL POZO 8933' (143 PARADAS). RIG: POZO: KEY 80057 SHUSHUFINDI-H154 SHSH-154 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: CONTROLANDO EL POZO CASING-TUBING A TRAVES DE 3-1/2" CAMISA DE CIRCULACION RIG: POZO: NABORS 813 EDEN YUTURI-H149H EN WORKOVER EDYH-149H MD (Pies): 7,398 TVD (Pies): 6,709.1 PROD.ESTIMADA: (BPPD) BAJANDO BHA # 30 CON ROTARY SHOE 8½'' EN 3½'' IF D/P EN PARADAS, 2200' DENTRO DEL DETALLE: POZO RIG: POZO: NABORS 814 PATA-A004 PATA-004 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: ARMA BHA DE PESCA CON OVER-SHOT 5-3/4" OD Y CATCH 3-1/2". RIG: NABORS 815 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 6 de 7 Fecha de Impresión: 14/01/2015 7:23:2 POZO: OSO-B060H EN WORKOVER OSOB-060H MD (Pies): 300 TVD (Pies): 300 PROD.ESTIMADA: (BPPD) SACANDO BHA # 2 CON DRILL PIPE 3-1/2" Y TUBERÍA 4-1/2" EUE, PARANDO EN LA TORRE. DETALLE: FUERA DEL POZO 9200'. RIG: POZO: NABORS 819 PAKA SUR-A015 PKSA-015 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) INSTALA 11'' X 3000 PSI A 11'' X 5000 PSI D.S.A + 11'' X 5000 PSI BOP Y PRUEBA DETALLE: FUNCIONAMIENTO. RIG: POZO: PETREX 5824 APAIKA-A009 APKA-009 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA # 1 DE PESCA CON RETRIEVING TOOL A 7500' RIG: POZO: SAXON 34 SHUSHUQUI-018 EN WORKOVER SHH-018 MD (Pies): 9,258 TVD (Pies): 9,258 PROD.ESTIMADA:100 (BPPD) DETALLE: DESARMANDO BHA DE LIMPIEZA RIG: POZO: SAXON 53 EDEN YUTURI-C094 EDYC-094R1 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CONTROLANDO POZO CIRCULANDO FLUIDO KCL AL 2% EN REVERSA 2.2 BPM / 600 PSI EN DETALLE: BOMBA / 200 PSI EN RETORNO. RIG: POZO: SAXON 55 SECOYA-D048 SCYD-048 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:350 (BPPD) BAJANDO BHA DE EVALUACIÓN EN 3 1/2" TSHB TBG, MIDIENDO, CALIBRANDO, PROBANDO CON DETALLE: 3000 PSI C/40 JT, AJUSTANDO CON TORQUE COMPUTARIZADO DE WEATHERFORD Y SUBIENDO 1x1 DE LOS CABALLETES( A LAS 06H00, DENTRO DEL POZO 6100 FT) SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION RIG: POZO: SINOPEC-905 EDEN YUTURI-T156 EDYT-156 Página 7 de 7 Fecha de Impresión: 14/01/2015 7:23:2 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO PRUEBAS DE PRODUCCION A LA ARENA "U Sup" RIG: POZO: TRIBOILGAS-006 TETETE-008 EN WORKOVER TTT-008 MD (Pies): 8,466 TVD (Pies): 8,466 PROD.ESTIMADA:200 (BPPD) DETALLE: CIRCULA POZO PARA LIMPIEZA DE CABEZA DEL ST. VALVE A 8420' RIG: POZO: TRIBOILGAS-101 VICTOR HUGO RUALES-005 EN WORKOVER VHR-005 MD (Pies): 3,000 TVD (Pies): 3,000 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO 5-1/2" CAMPANA ON-OFF EN TUBERIA DE 3-1/2" EUE , N-80 . MIDIENDO , HASTA 7100' RIG: POZO: TRIBOILGAS-102 CULEBRA-A006 CLBA-006 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CAMBIANDO SECCION B DEL CABEZAL (BOMBEO HIDRAULICO) POR SECCION C DEL CABEZAL DETALLE: (BOMBEO ELECTRICO) OPERACION EN CURSO RIG: POZO: TRIBOILGAS-104 AUCA-H083 EN WORKOVER ACAH-083 MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: POZO CERRADO PARA REALIZAR BUILD UP POR 30 HORAS. RIG: POZO: TRIBOILGAS-107 CUYABENO-G042 CYBG-042 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: Levantando Sarta con 102 kLbs de peso + retirando Hanger DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día
© Copyright 2024