SUMARIO DE OPERACIONES PRODUCCION Y

SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 1 de 7
Fecha de Impresión:
27/02/2015 7:21:10
OPERACIONES CON TORRES: 26/02/2015 06:00am AL 27/02/2015 06:00am
RIG:
POZO:
HILONG 17
PAYAMINO-G025
EN COMPLETACION
PYMG-025
MD (Pies):
0
TVD (Pies):
0
PROD.ESTIMADA: (BPPD)
DETALLE:
CIA HALLIBURTON REALIZAN SEGUNDA CORRIDA CON (GR-CBL-MSG-CAST). SIN TERMINAR
RIG:
POZO:
OCEAN SPUR
AMISTAD-010
AMS-010
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
EN ESPERA DE LUZ DEL DÍA PARA REALIZAR INVERSIÓN DE BUZOS + EMBONAR CAMPANA EN
DETALLE:
CASING 20" Y EFECTUAR SOLDADURA A BOCA DE POZO.
RIG:
POZO:
SAXON 47
ATACAPI-001
ATC-001R1
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
RIG EN STAND-BY A LA ESPERA DE CARGAS DE CÍA. BAKER PARA PUNZAR ARENAS "Ti"
DETALLE:
INTERVALOS 9790'-9809' (19'); 9814'-9831' (17') Y "Ts" INTERVALO 9779'-9788' (9').
RIG:
POZO:
SINOPEC 119
COCA-K046
EN COMPLETACION
COCK-046
MD (Pies):
206
TVD (Pies):
206
PROD.ESTIMADA: (BPPD)
INSTALA STANDING VALVE. PRUEBA TUBERIA, OK. RECUPERA STANDING VALVE. DESPLAZA POR
SALMUERA DE 8.9 LPG. BAKER WIRE LINE CORRE REGISTRO DE CORRELACION GR-CCL.
DETALLE:
POSICIONA HERRAMIENTA EASYCUT SJ PERFORATOR. INICIA PERFORACION DEL INTERVALO
11156' - 11144' .
RIG:
POZO:
SINOPEC 127
OSO-H123
EN COMPLETACION
OSOH-123
MD (Pies):
10,426
TVD (Pies):
9,428.4
PROD.ESTIMADA: (BPPD)
DETALLE:
REGISTRANDO CORRELACIÓN DE CONTROL PRIMARIO DE PROFUNDIDAD @ 5400'
RIG:
POZO:
MD (Pies):
TVD (Pies):
SINOPEC 248
CONONACO-F053
CNOF-053
EN MOVILIZACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 2 de 7
Fecha de Impresión:
27/02/2015 7:21:10
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZA REUNION DE SEGURIDAD PREVIO A CONTINUAR CON ARMADO DE EQUIPO.
RIG:
POZO:
CCDC-036
PAKA NORTE-A017
EN PERFORACION
PKNA-017
MD (Pies):
11,540
TVD (Pies):
9,984.5
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA #09 CONVENCIONAL DE LIMPIEZA A 4000'.
RIG:
POZO:
CCDC-038
TAPI-C010
EN PERFORACION
TAPC-010
MD (Pies):
336
TVD (Pies):
336
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO BHA # 02 DIRECCIONAL CON BROCA PDC DE 16" (ACTIVIDAD EN PROGRESO)
RIG:
POZO:
CCDC-039
CUYABENO-C068
EN PERFORACION
CYBC-068
MD (Pies):
7,802
TVD (Pies):
7,002.5
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO CEMENTO CON BHA # 5 @ 7730 FT
RIG:
POZO:
CCDC-066
COCA-A057H
EN PERFORACION
COCA-057H
MD (Pies):
11,582
TVD (Pies):
9,499
PROD.ESTIMADA: (BPPD)
REUNIÓN DE SEGURIDAD PRE-OPERACIONAL PREVIO AL ARMADO DEL BHA # 11 PARA
DETALLE:
CALIBRACIÓN DEL HOYO DE 6-1/8".
RIG:
POZO:
CCDC-068
AUCA-K182
EN PERFORACION
ACAK-182
MD (Pies):
7,543
TVD (Pies):
7,274.2
PROD.ESTIMADA: (BPPD)
PERFORA ROTANDO SECCION DE 12 1/4" CON BHA # 3 DIRECCIONAL Y BROCA PDC DE 12 1/4"
DETALLE:
CON LOS SIGUIENTES PARAMETROS 950 GPM, 3400 PSI, 60 RPM, 14 KLBS/FT DE TQ, 20-28 WOB.
DESDE 7355 FT HASTA 7543 FT
RIG:
POZO:
MD (Pies):
TVD (Pies):
NABORS 609
RUMIYACU-A006
RMYA-006
9,270
8,995.8
EN PERFORACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 7
Fecha de Impresión:
27/02/2015 7:21:10
PROD.ESTIMADA: (BPPD)
DETALLE:
POOH BHA # 4 DIRECCIONAL Y BROCA PDC DE 12 1/4" @ 7031'.
RIG:
POZO:
SINOPEC 128
AUCA-Q164
EN PERFORACION
ACAQ-164
MD (Pies):
8,385
TVD (Pies):
7,941.6
PROD.ESTIMADA: (BPPD)
PERFORANDO SECCION 12 1/4", CONTROLANDO PARAMETROS EN CONGLOMERADO INFERIOR A
DETALLE:
8385'
RIG:
POZO:
SINOPEC 156
AUCA-P178
EN PERFORACION
ACAP-178
MD (Pies):
10,150
TVD (Pies):
9,802.5
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORA ROTANDO SECCION DE 8 1/2" A 10150 FT
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-E062
EN PERFORACION
DRRE-062
MD (Pies):
10,825
TVD (Pies):
9,358.7
PROD.ESTIMADA: (BPPD)
CIRCULANDO CON BHA DIRACCIONAL # 5 Y BROCA PDC 12 1/4" @ 10825 FT (TD SECCION)
DETALLE:
HASTA RETORNOS LIMPIOS (ACTIVIDAD EN PROCESO)
RIG:
POZO:
SINOPEC 191
OSO-I141
EN PERFORACION
OSOI-141
MD (Pies):
2,904
TVD (Pies):
2,900.6
PROD.ESTIMADA: (BPPD)
PERFORANDO EN MODO ROTACION y EN SLIDE CON BHA # 2 DD + BROCA PDC DE 16" TIPO
DETALLE:
SDiLHPX @ 2904 FT
RIG:
POZO:
SINOPEC 220
OSO-G100
EN PERFORACION
OSOG-100
MD (Pies):
4,790
TVD (Pies):
4,697.1
PROD.ESTIMADA: (BPPD)
DETALLE:
REPARANDO TOP DRIVE CON TIEMPO A CARGO A LA CIA SINOPEC.
RIG:
POZO:
MD (Pies):
TVD (Pies):
HILONG 18
EDEN YUTURI-J077
EDYJ-077
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 7
Fecha de Impresión:
27/02/2015 7:21:10
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA DE LIMPIEZA EN 3 1/2" DP EN PARADAS @ 833 FT, 13 PARADAS AFUERA.
RIG:
POZO:
CCDC-052
CHONTA ESTE-A003
CHEA-003
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO BHA DE LIMPIEZA CONVENCIONAL EN TANDEM LINER 7 26 LB/FT Y CASING 9 5/8 47
DETALLE:
LB/FT EN DRILLPIPE 3.5 13.3 LB/FT S-135 IF MIDIENDO HASTA 9,200 FT.
RIG:
POZO:
DYGOIL-30
AGUARICO-A011
AGRA-011
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO PESCADO, TUBERÍA EUE 3 1/2" CON EQUIPO BES QUEBRANDO; AFUERA: 3900'.
RIG:
POZO:
GEOPETSA-01
PARAHUACU-A021
EN WORKOVER
PRHA-021
MD (Pies):
572.2
TVD (Pies):
572
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO 3 1/2" EUE TUBERIA, CLASE "B" EN PARADAS (50 TUBOS)
RIG:
POZO:
GEOPETSA-04
GUANTA-A001
EN WORKOVER
GNTA-001
MD (Pies):
8,283
TVD (Pies):
8,283
PROD.ESTIMADA: (BPPD)
SACANDO BHA MOLEDOR CON 6" ZAPATA EN 2 7/8" DRILL PIPE EN PARADAS HACIA LA TORRE.
DETALLE:
FUERA DEL POZO 1000 FT @ 06H00
RIG:
POZO:
GEOPETSA-06
LAGO AGRIO-034
EN WORKOVER
LGA-034
MD (Pies):
7,504
TVD (Pies):
7,504
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA #4 MOLEDOR
RIG:
POZO:
HILONG 28
PALMAR OESTE-A008
PLOA-008
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
DETALLE:
Página 5 de 7
Fecha de Impresión:
27/02/2015 7:21:10
TECNICO CIA. SLB REALIZA EMPALME DEL CABLE DE POTENCIA AL CARRETO # 2, AVANCE 70%.
RIG:
POZO:
KEY 80051
SHUSHUFINDI-014
EN WORKOVER
SHS-014
MD (Pies):
3,000
TVD (Pies):
3,000
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA ACONDICIONADOR EN 2 7/8" DRILL PIPE CON 4 3/4" DRILL PIPE
RIG:
POZO:
KEY 80057
SHUSHUFINDI-I133
SHSI-133
MD (Pies):
1,666.3
TVD (Pies):
1,628.6
PROD.ESTIMADA: (BPPD)
DETALLE:
EN WORKOVER
RIG:
POZO:
NABORS 794
PALO AZUL-N049H
EN WORKOVER
PLAN-049HS1
MD (Pies):
12,047
TVD (Pies):
10,062.9
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES CON TRES BOMBAS P 18 EN TUBERIA 3 1/2'' BGT2, 9.2 LBS/FT, 3 % CR,
DETALLE:
CLASE A. 06H00 DENTRO DEL POZO 1110 FT (32 JTAS 3 1/2" BGT + BES).
RIG:
POZO:
NABORS 813
AUCA SUR-A018
ACSA-018
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
AFLOJANDO PERNOS DE 11" x 5000 PSI BOP.
RIG:
POZO:
NABORS 814
PALO AZUL-B010
EN WORKOVER
PLAB-010S1
MD (Pies):
0
TVD (Pies):
0
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES P18 BAKER-CENTRILIFT (402 STG, 270 HP) EN 2-7/8" EUE TBG 6.5 LPP,
DETALLE:
L-80, R2 WSP, COND-01 SUBIENDO DESDE LOS CABALLETES, A LAS 06H00 DENTRO DEL POZO
6500 FT (201 JUNTAS + EQ. BES).
RIG:
POZO:
NABORS 815
OSO-B076
OSOB-076
MD (Pies):
600
TVD (Pies):
599.9
PROD.ESTIMADA: (BPPD)
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
DETALLE:
RIG:
POZO:
Página 6 de 7
Fecha de Impresión:
27/02/2015 7:21:10
EVALUANDO POZO DE ARENA HOLLÍN CON BOMBA JET 11 K Y ELEMENTOS DE PRESIÓN CON
MTU CIA. SERTECPET.
NABORS 819
PAKA SUR-B010
PKSB-010
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO PIN CONNECTOR EN 3 1/2" EUE TUBERIA EN PARADAS DESDE LA TORRE MIDIENDO Y
DETALLE:
TORQUEANDO CON LLAVE DEL RIG CON 2200 #/FT. 956.62' DENTRO DEL POZO HASTA LAS
06:00.
RIG:
POZO:
PETROTECH 04
AUCA-G077
EN WORKOVER
ACAG-077
MD (Pies):
1,931
TVD (Pies):
1,888.3
PROD.ESTIMADA: (BPPD)
BAJANDO EQUIPO BES PF3.2X EN 3 1/2" EUE TBG MIDIENDO, CALIBRANDO Y PROBANDO CON
DETALLE:
3000 PSI CADA 20 PARADAS
06:00 HRS DENTRO DEL POZO 2000 FT
RIG:
POZO:
SAXON 53
EDEN YUTURI-F117
EDYF-117
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO APROBACION PARA REALIZAR CAÑONEO DE ARENA T (8700-8707 FT).
RIG:
POZO:
SAXON 55
ATACAPI-C023
ATCC-023
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:200 (BPPD)
DETALLE:
RETIRAN CABEZAL Y LINEA DE PRODUCCION
RIG:
POZO:
SINOPEC-905
EDEN YUTURI-G045
EN WORKOVER
EDYG-045
MD (Pies):
7,903
TVD (Pies):
7,431.7
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO CORRELACION Y ESPACIAMIENTO DE CAÑONES TCP
RIG:
POZO:
MD (Pies):
TVD (Pies):
TRIBOILGAS-006
ARAZA-A005
EN WORKOVER
ARZA-005
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 7 de 7
Fecha de Impresión:
27/02/2015 7:21:10
PROD.ESTIMADA:150 (BPPD)
SACAN EQUIPO BES CENTRILIFT P18XH6 EN TUBERIA DE 3-1/2" CLASE "B" EN PARADAS A LAS
DETALLE:
06H00 FUERA DEL POZO 900'
RIG:
POZO:
TRIBOILGAS-008
DRAGO NORTE-C021
DRRC-021
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DESARMA BHA DE LIMPIEZA COMBINADO: 4 3/4" X-OVER, 9 5/8" SCRAPER, 4 3/4" X-OVER, 3
DETALLE:
1/2" IF (13) TUBOS D.P, 7" SCRAPER, 6 1/8" BROCA.
RIG:
POZO:
TRIBOILGAS-101
CUYABENO-G051
EN WORKOVER
CYBG-051
MD (Pies):
1,000
TVD (Pies):
989.3
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO EL POZO EN REVERSA A 7706' AL TANQUE DE LODOS.
RIG:
POZO:
TRIBOILGAS-102
YULEBRA-A008
YLBA-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO POZO HASTA RETORNOS LIMPIOS A 9180 FT CON 5 BPM Y 500 PSI.
RIG:
POZO:
TRIBOILGAS-105
DRAGO NORTE-A011
EN WORKOVER
DRRA-011
MD (Pies):
9,796.4
TVD (Pies):
9,409.6
PROD.ESTIMADA: (BPPD)
DETALLE:
BOMBEANDO PILDORA TEMPORAL LO-GARD Y FORZANDO A LA FORMACION CON 1500 PSI
RIG:
POZO:
TRIBOILGAS-107
VICTOR HUGO RUALES-009
EN WORKOVER
VHR-009
MD (Pies):
3,000
TVD (Pies):
3,000
PROD.ESTIMADA: (BPPD)
Evaluando arena "M2" 7835'-7839' (4') 5 DPP; 7776'-7780' (4') 5 DPP, 7784'-7790' (6') 5 DPP; con
DETALLE:
bomba jet 10J + unidad MTU y memorias de Cia. Sertecpet con retorno al tanque bota del rig.
DESCRIPCION DE UNIDADES:
BPPD: Barriles de Petróleo por día