PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 12 DE NOVIEMBRE DE 2014 MES: NOVIEMBRE 2014 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-11-14 02-11-14 03-11-14 04-11-14 05-11-14 06-11-14 07-11-14 08-11-14 09-11-14 10-11-14 11-11-14 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 557.145 558.255 561.664 562.680 563.242 562.896 563.034 562.732 563.252 562.940 559.900 123.598 123.574 126.047 125.198 125.432 125.045 125.482 125.842 125.769 126.408 125.908 433.547 434.680 435.617 437.482 437.811 437.851 437.552 436.890 437.483 436.532 433.992 -3.040 -500 -2.540 12-11-14 13-11-14 14-11-14 15-11-14 16-11-14 17-11-14 18-11-14 19-11-14 20-11-14 21-11-14 22-11-14 23-11-14 24-11-14 25-11-14 26-11-14 27-11-14 28-11-14 29-11-14 30-11-14 01-12-14 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP. ,BLOQUE-57: pozo Aguarico-005B bajo aporte, pozo Shushufindi-059 PROMEDIO NOVIEMBREE 2014 REAL PROMEDIO NOVIEMBREE 2014 META DIFERENCIA REAL-META NOVIEMBRE % DE2014 META EN NOVIEMBRE 2014 561.613 125.300 436.313 532.120 102.530 429.590 29.492 22.770 6.723 105,5% 122,2% 101,6% declina producción por incremento de PIP, pozo Drago-D26 apagado porque no aporta. BLOQUE 58: pozos VHR:1-2-3-4-6-7-8-11-12-13-14-15-17-18-20-21-22-23-24-30-31 apagados 4 horas por problemas de descargas atmosférica. BLOQUE-61: pozo Cononaco-40: declinación de producción, pozos Auca Central: 121-123-124125 problemas de generación eléctrica, pozo Auca Sur-96 bajo aporte. BLOQUE-44: continúa pozo Pucuna-9 cerrado temporalmente por problemas operativos. BLOQUE-7: continúan pozo OSOA-77 apagado por operaciones de W.O, pozo OsoA-057 incremento de %BSW, 24 horas apagado. *ORIONOIL ENERGY OCANOPB S.A. , pozos: Peña Blanca-1 cerrado bonba jet atascada, Peña Blanca2 cerrado se suspende evaluación con MTU. *CÍA RÍO NAPO., pozo Sacha-139 posible desbalance de fases, en espera de W.O., pozo Sacha-451-452454 mantenimiento de generador. *CÍA. PEGASSO: pozo Puma-9 baja producción y pozo Puma-12 falla en la completación, continúa. *CIA. REPSOL ECUADOR S.A., Mantenimiento de bomba de aleta presión PM-2079W pozos afectados: Daimi-B5-B18, Iro-A10, Amo-A9-B19-B21. Trabajos de facilidades varios, reacondicionamiento y alto nivel de agua en tanques), pozos afectados: Amo-A109-B3-B9, Capirón-A8, Daimi-A12-B30-B5, Ginta-B7-B18, Iro-A32A8-A9-B20 - y Tivacuno-C5. *ENAP SIPEC., continúa pozo Huaico A-1 apagado por operaciones en taladro de perforación HP Rig-138. CIAS./CONTRATOS PRODUCCION ACTUAL PETROAMAZONAS EP RIO NAPO 360.988 73.004 COMPAÑIAS PRIVADAS 125.908 TOTAL PETROLEO NETO 559.900 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) FECHA DE REPORTE: 12 DE NOVIEMBRE DE 2014 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-11-14 361.522 72.025 433.547 02-11-14 03-11-14 04-11-14 05-11-14 06-11-14 07-11-14 08-11-14 09-11-14 10-11-14 11-11-14 12-11-14 13-11-14 14-11-14 15-11-14 361.645 362.511 364.279 364.560 364.566 364.260 363.587 364.172 363.396 360.988 73.035 73.106 73.204 73.250 73.286 73.292 73.303 73.311 73.135 73.004 16-11-14 17-11-14 18-11-14 19-11-14 20-11-14 21-11-14 22-11-14 23-11-14 24-11-14 25-11-14 26-11-14 27-11-14 28-11-14 29-11-14 30-11-14 01-12-14 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 360.988 73.004 433.992 434.680 435.617 437.482 437.811 437.851 437.552 436.890 437.483 436.532 433.992 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: NOVIEMBRE 2014 CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS 01-11-14 759 2.763 4.940 3.826 2.831 12.516 30.041 33.071 12.114 12.254 5.737 1.556 1.189 123.598 02-11-14 734 2.768 4.847 3.813 2.755 12.507 29.520 33.193 12.082 12.194 5.735 1.620 638 1.170 123.574 03-11-14 702 2.874 4.928 3.830 2.879 12.606 30.861 33.149 12.084 11.883 5.759 1.480 1.848 1.165 126.047 04-11-14 702 2.765 4.923 3.834 2.801 12.606 30.394 33.052 12.062 11.920 5.755 1.624 1.583 1.176 125.198 05-11-14 703 2.874 4.921 3.838 2.926 12.505 30.039 33.031 12.019 11.957 5.755 1.582 2.118 1.162 125.432 06-11-14 733 2.828 4.894 3.836 2.953 12.401 30.158 32.887 11.988 11.679 5.755 1.481 2.231 1.221 125.045 07-11-14 756 2.848 4.918 3.826 2.912 12.413 30.468 33.044 11.968 11.708 5.750 1.495 2.222 1.152 125.482 08-11-14 759 2.855 4.916 3.612 2.973 12.304 30.815 33.045 11.961 11.932 5.720 1.384 2.404 1.162 125.842 09-11-14 761 2.829 4.915 3.817 3.082 12.322 30.874 33.026 11.369 12.077 5.721 1.540 2.288 1.148 125.769 10-11-14 761 2.858 4.901 3.820 3.020 12.388 30.887 33.013 11.910 12.038 5.720 1.480 2.447 1.165 126.408 11-11-14 762 2.847 4.903 3.802 3.016 12.272 30.805 33.120 11.905 12.107 5.601 1.541 2.063 1.166 125.908 739 2.828 4.910 3.805 2.923 12.440 30.442 33.057 11.951 11.977 5.728 1.526 1.984 1.171 125.481 PROMEDIO NOVIEMBRE 2014 META 854 2.107 4.000 2.605 2.603 8.006 32.262 23.705 11.314 11.038 1.594 997 329 1.116 102.530 DIFERENCIA REAL -META NOVIEMBRE 2014 -115 721 910 1.200 320 4.434 -1.820 9.352 637 939 4.134 529 1.655 54 22.950 % DE META NOVIEMBRE 2014 86,6% 134,2% 122,7% 146,1% 112,3% 155,4% 94,4% 139,5% 105,6% 108,5% 359,4% 153,0% 603,1% 104,9% 122,4% ORIONOIL ER S.A. FECHA DE OPERACIÓN (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 12-11-14 13-11-14 14-11-14 15-11-14 16-11-14 17-11-14 18-11-14 19-11-14 20-11-14 21-11-14 22-11-14 23-11-14 24-11-14 25-11-14 26-11-14 27-11-14 28-11-14 29-11-14 30-11-14 01-12-14 PROMEDIO NOVIEMBRE 2014 REAL
© Copyright 2024