para evitar volatilidad

PRODUCCION DIARIA DE PETROLEO NETO
DE CAMPO A NIVEL NACIONAL (BLS)
FECHA DE REPORTE: 12 DE NOVIEMBRE DE 2014
MES: NOVIEMBRE 2014
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
01-11-14
02-11-14
03-11-14
04-11-14
05-11-14
06-11-14
07-11-14
08-11-14
09-11-14
10-11-14
11-11-14
TOTAL NACIONAL
TOTAL CIAS.
PRIVADAS
*TOTAL PETROAMAZONAS EP+RIO
NAPO
557.145
558.255
561.664
562.680
563.242
562.896
563.034
562.732
563.252
562.940
559.900
123.598
123.574
126.047
125.198
125.432
125.045
125.482
125.842
125.769
126.408
125.908
433.547
434.680
435.617
437.482
437.811
437.851
437.552
436.890
437.483
436.532
433.992
-3.040
-500
-2.540
12-11-14
13-11-14
14-11-14
15-11-14
16-11-14
17-11-14
18-11-14
19-11-14
20-11-14
21-11-14
22-11-14
23-11-14
24-11-14
25-11-14
26-11-14
27-11-14
28-11-14
29-11-14
30-11-14
01-12-14
DIFERENCIA
HOY-AYER
NOVEDADES:
*CIA PETROAMAZONAS EP. ,BLOQUE-57: pozo Aguarico-005B bajo aporte, pozo Shushufindi-059
PROMEDIO
NOVIEMBREE
2014 REAL
PROMEDIO
NOVIEMBREE
2014 META
DIFERENCIA
REAL-META
NOVIEMBRE
% DE2014
META EN
NOVIEMBRE
2014
561.613
125.300
436.313
532.120
102.530
429.590
29.492
22.770
6.723
105,5%
122,2%
101,6%
declina producción por incremento de PIP, pozo Drago-D26 apagado porque no aporta. BLOQUE 58: pozos
VHR:1-2-3-4-6-7-8-11-12-13-14-15-17-18-20-21-22-23-24-30-31 apagados 4 horas por problemas de descargas
atmosférica. BLOQUE-61: pozo Cononaco-40: declinación de producción, pozos Auca Central: 121-123-124125 problemas de generación eléctrica, pozo Auca Sur-96 bajo aporte. BLOQUE-44: continúa pozo Pucuna-9
cerrado temporalmente por problemas operativos. BLOQUE-7: continúan pozo OSOA-77 apagado por
operaciones de W.O, pozo OsoA-057 incremento de %BSW, 24 horas apagado.
*ORIONOIL ENERGY OCANOPB S.A. , pozos: Peña Blanca-1 cerrado bonba jet atascada, Peña Blanca2 cerrado se suspende evaluación con MTU.
*CÍA RÍO NAPO., pozo Sacha-139 posible desbalance de fases, en espera de W.O., pozo Sacha-451-452454 mantenimiento de generador.
*CÍA. PEGASSO: pozo Puma-9 baja producción y pozo Puma-12 falla en la completación, continúa.
*CIA. REPSOL ECUADOR S.A., Mantenimiento de bomba de aleta presión PM-2079W pozos afectados:
Daimi-B5-B18, Iro-A10, Amo-A9-B19-B21. Trabajos de facilidades varios, reacondicionamiento y alto nivel de
agua en tanques), pozos afectados: Amo-A109-B3-B9, Capirón-A8, Daimi-A12-B30-B5, Ginta-B7-B18, Iro-A32A8-A9-B20 - y Tivacuno-C5.
*ENAP SIPEC., continúa pozo Huaico A-1 apagado por operaciones en taladro de perforación HP Rig-138.
CIAS./CONTRATOS
PRODUCCION ACTUAL
PETROAMAZONAS EP
RIO NAPO
360.988
73.004
COMPAÑIAS PRIVADAS
125.908
TOTAL PETROLEO NETO
559.900
PRODUCCION DIARIA DE PETROLEO NETO DE
CAMPO PETROAMAZONAS EP Y RIO NAPO
(BLS)
FECHA DE REPORTE: 12 DE NOVIEMBRE DE 2014
COMPARATIVO DIARIO
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
(CERRADO A LAS 06H00)
TOTAL
PETROAMAZONAS
RIO NAPO ESTADO+
EP
MIXTAS
01-11-14
361.522
72.025 433.547
02-11-14
03-11-14
04-11-14
05-11-14
06-11-14
07-11-14
08-11-14
09-11-14
10-11-14
11-11-14
12-11-14
13-11-14
14-11-14
15-11-14
361.645
362.511
364.279
364.560
364.566
364.260
363.587
364.172
363.396
360.988
73.035
73.106
73.204
73.250
73.286
73.292
73.303
73.311
73.135
73.004
16-11-14
17-11-14
18-11-14
19-11-14
20-11-14
21-11-14
22-11-14
23-11-14
24-11-14
25-11-14
26-11-14
27-11-14
28-11-14
29-11-14
30-11-14
01-12-14
COMPAÑIAS
ESTADO
PETROAMAZONAS
EP
RÍO NAPO
TOTAL ESTADO+
MIXTAS
PRODUCCION
ACTUAL
360.988
73.004
433.992
434.680
435.617
437.482
437.811
437.851
437.552
436.890
437.483
436.532
433.992
PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS)
MES: NOVIEMBRE 2014
CAMPO PUMA S.A
(CONSORCIO PEGASO)
TECPECUADOR
CONSORCIO PETROSUD
PETRORIVA
CONSORCIO PALANDA
YUCASUR
PETROBELL
PETRORIENTAL (BLOQUE
14 Y 17)
REPSOL AREA BLOQUE
16 + TIVACUNO
ANDES PETROLEUM
TARAPOA
AGIP OIL
ENAP SIPEC
GENTE OIL ECUADOR
ORION ENERGY
OCANOPB S.A.
PACIFPETROL
TOTAL COMPAÑIAS
PRIVADAS
01-11-14
759
2.763
4.940
3.826
2.831
12.516
30.041
33.071
12.114
12.254
5.737
1.556
1.189
123.598
02-11-14
734
2.768
4.847
3.813
2.755
12.507
29.520
33.193
12.082
12.194
5.735
1.620
638
1.170
123.574
03-11-14
702
2.874
4.928
3.830
2.879
12.606
30.861
33.149
12.084
11.883
5.759
1.480
1.848
1.165
126.047
04-11-14
702
2.765
4.923
3.834
2.801
12.606
30.394
33.052
12.062
11.920
5.755
1.624
1.583
1.176
125.198
05-11-14
703
2.874
4.921
3.838
2.926
12.505
30.039
33.031
12.019
11.957
5.755
1.582
2.118
1.162
125.432
06-11-14
733
2.828
4.894
3.836
2.953
12.401
30.158
32.887
11.988
11.679
5.755
1.481
2.231
1.221
125.045
07-11-14
756
2.848
4.918
3.826
2.912
12.413
30.468
33.044
11.968
11.708
5.750
1.495
2.222
1.152
125.482
08-11-14
759
2.855
4.916
3.612
2.973
12.304
30.815
33.045
11.961
11.932
5.720
1.384
2.404
1.162
125.842
09-11-14
761
2.829
4.915
3.817
3.082
12.322
30.874
33.026
11.369
12.077
5.721
1.540
2.288
1.148
125.769
10-11-14
761
2.858
4.901
3.820
3.020
12.388
30.887
33.013
11.910
12.038
5.720
1.480
2.447
1.165
126.408
11-11-14
762
2.847
4.903
3.802
3.016
12.272
30.805
33.120
11.905
12.107
5.601
1.541
2.063
1.166
125.908
739
2.828
4.910
3.805
2.923
12.440
30.442
33.057
11.951
11.977
5.728
1.526
1.984
1.171
125.481
PROMEDIO
NOVIEMBRE
2014 META
854
2.107
4.000
2.605
2.603
8.006
32.262
23.705
11.314
11.038
1.594
997
329
1.116
102.530
DIFERENCIA
REAL -META
NOVIEMBRE
2014
-115
721
910
1.200
320
4.434
-1.820
9.352
637
939
4.134
529
1.655
54
22.950
% DE META
NOVIEMBRE
2014
86,6%
134,2%
122,7%
146,1%
112,3%
155,4%
94,4%
139,5%
105,6%
108,5%
359,4%
153,0%
603,1%
104,9%
122,4%
ORIONOIL ER S.A.
FECHA DE OPERACIÓN
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
COMPARATIVO DIARIO
12-11-14
13-11-14
14-11-14
15-11-14
16-11-14
17-11-14
18-11-14
19-11-14
20-11-14
21-11-14
22-11-14
23-11-14
24-11-14
25-11-14
26-11-14
27-11-14
28-11-14
29-11-14
30-11-14
01-12-14
PROMEDIO
NOVIEMBRE
2014 REAL