Close Campus drive by Jai Mineralrs Group of Companies Monday

Close Campus drive by
Jai Mineral’s Group of Companies
Monday, 2/02/15
A. B.E (ME/EE) 2014 and 2015 batch & B.E (CE) 2015 batch
a. Position: Graduate Engineer Trainee (GET)
b. Criteria: XIIth -55% & B.E- 60%
c. No. of openings: ME-06 (03 Marketing, 03 technical), CE-05 (03-site, 02costing,evaluation & tendering)
d. Salary: CTC- 3 LPA, Fixed in hand- 1.8 LPA, 12 months training period
e. CTC includes the following benefits;
B.E (CE), Site
Free boarding & loadging
Actual disbursement of mobile charges
Vehicle allowance/facility
B.E (ME), Marketing Profile
House rent allowance
Travel allowance / facility
Sales commission
B.E (ME/EE), Technical profile
House rent allowance
Travel allowance
Actual disbursement of mobile charges
After completion of 1 year following benefits will also be provided
o Medical allowance
o Vehicle loans (Margin money loan)
B. MBA/PGDM[(FIN/(A/C)/HR/MKT)]2015 & MBA [(FIN/(A/C)/HR/MKT)]2014
a. Position: Management Trainee (MT)
b. Criteria: 50% in graduation & 60% in PG.
c. No. of openings: 08 (02 positions in Jabalpur, 02 in SRL factory, Talbehat (near Jhansi)
and 04 positions in corporate office, Bhopal.)
d. Salary: CTC- 3 LPA, fixed in hand -1.5 LPA, The duration of training will be 12 months
e. CTC includes the following benefits:
House rent allowance
Actual disbursement of mobile charges
Travel allowance
After completion of 1 year following benefits will also be provided
o Medical allowance
o Vehicle loans (Margin money loan)
C. Selection Process
Pre Placement talk
Written test (English/computer skills)
Written test paper will have following sections:
a. Writing skills
b. Vocabulary
c. Presentation skills
d. MS Office
Group discussion
Personal Interviews
Company Profile:
The Group activities include mining of Iron Ore, Manganes, Laterite,bauxite,industrial minerals and
Civil Construction Work, Education,and now Refractory, Manufacturing. Looking into the higher
industrialization in all sectors, mainly steel and cement the refractory demands is likely to continue
for many years to come. Keeping this in view a new modern unit having latest “State-of-art
manufacturing facilities/equipments for manufacturing refractories (bricks and castables is being set
up) at Talbehat, Lalitpur (U.P) very close to Madhya Pradesh. Construction of Model Schools,
Polytechnique colleges, and other industrial projects. Sites are mainly at M.P. and U.P. The
Corporate office is in M.P. Nagar, Bhopal.
…………………..