produccion diaria de petroleo neto de campo a nivel nacional

PRODUCCION DIARIA DE PETROLEO NETO
DE CAMPO A NIVEL NACIONAL (BLS)
FECHA DE REPORTE: 30 DE ENERO DE 2015
MES: ENERO 2015
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
01-01-15
02-01-15
03-01-15
04-01-15
05-01-15
06-01-15
07-01-15
08-01-15
09-01-15
10-01-15
11-01-15
12-01-15
13-01-15
14-01-15
15-01-15
16-01-15
17-01-15
18-01-15
19-01-15
20-01-15
21-01-15
22-01-15
23-01-15
24-01-15
25-01-15
26-01-15
27-01-15
28-01-15
29-01-15
TOTAL NACIONAL
TOTAL CIAS.
PRIVADAS
*TOTAL PETROAMAZONAS EP+RIO
NAPO
562.277
556.620
557.352
557.321
554.925
552.268
556.559
557.109
558.481
557.805
560.048
558.007
558.176
558.472
556.746
554.198
558.690
559.108
557.409
553.869
554.454
555.309
556.326
556.963
558.303
558.841
558.124
561.091
562.249
127.434
124.782
125.171
124.787
124.682
120.871
122.387
122.649
124.428
125.207
125.363
124.089
125.158
126.375
124.686
124.839
128.474
129.100
128.309
125.905
126.883
127.032
127.060
127.429
127.808
128.586
128.777
128.778
129.900
434.844
431.839
432.181
432.535
430.243
431.397
434.172
434.460
434.053
432.598
434.684
433.918
433.018
432.096
432.060
429.359
430.217
430.008
429.100
427.964
427.570
428.277
429.266
429.534
430.495
430.255
429.347
432.313
432.348
1.158
1.123
35
30-01-15
31-01-15
DIFERENCIA
HOY-AYER
NOVEDADES:
*CIA PETROAMAZONAS EP, Bloque-61: pozo Auca Central- 86 continua apagado 16hrs. en
PROMEDIO
ENERO 2015
REAL
557.486
126.102
431.385
PROMEDIO
ENERO 2015
META
576.730
124.960
451.770
DIFERENCIA
REAL-META
ENERO 2015
-19.244
1.141
-20.385
% DE META EN
ENERO 2015
96,7%
100,9%
95,5%
reacondicionamiento (bajar equipo BES). Bloque 7: pozos Oso A: -37-41-57 limitación de producción por lato
BSW. Bloque-21 pozo Yuralapa-10 apagado 24 hrs. por falla de equipo BES en espera de
reacondicionamiento. Bloque-57: pozo Shushufindi- 208 apagado 16hrs. por falla no recuperable producción
(falla de equipo BES), pozo Drago Norte-56 apagado 24 hrs. por baja presión de reservorio – depletación.
Bloque-15: varios pozos Itaya, Indillana, Jivino, Limoncocha, Laguna, Paka Sur, Yanaquincha Oeste: continúan
cerrados por falla eléctrica. Bloque-12 varios pozos Edén Yuturi, Pañacocha continúan cerrados por falla
eléctrica.
*CIA. TECPECUADOR S.A. Pozo Bermejo Sur-08 apagado esperando trabajos de pulling, continúa.
Bermejo Norte-6 apagado 9 horas por mantenimiento preventivo+correctivo calibraciónn de válvulas de motor.
*CIA. REPSOL ECUADOR S.A, 6 pozos cerrados temporalmente por restricción de producción por
facilidades ( alto nivel de agua en tanques). Además pozos: Amo B9 -B8 apagado por baja producción, GintaA50, Daimi-A12, Iro-A8 e Iro-A9 esperando reacondicionamiento, Ginta -B12 pozo en reacondicionamiento, IroB20 falla en bombas de reinyección, Trabajos varios de mantenimiento de facilidades.
*CIA. PETROBELL, Pozos Cachiyacu-1 continúa cerrado por problemas con la Comunidad Huarani.
*CIA. PEGASO S.A, Pozos: Puma-12 falla en la completación, Puma-9 esperando reacondicionamiento por
baja producción
*RIO NAPO CEM , Pozos: Sacha-208D-317H apagado por bajo aporte, Sacha-445D falla eléctrica de
equipo BES (baja presión intake, Sacha-62A apagado 4 horas por mantenimiento de MTU, mas 3 pozos
cerrados por reacondicionamiento.
CIAS./CONTRATOS
PETROAMAZONAS EP
RIO NAPO
COMPAÑIAS PRIVADAS
*CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8-31 cerrado por bajo aporte, Homiguero Sur- 01
PRODUCCION ACTUAL
358.356
73.992
129.900
esperando reacondicionamiento, Hormiguero-26 cerrado en reacondicionamiento, Hormiguero-19-27 apagado
temporalmente por mantenimiento de BES.
*CONSORCIO PETROSUD PETRORIVA, Pozo Pindo-13 apagado esperando reacondicionamiento.
*CIA. GENTE OIL ECUADOR, Pozos: Singue-A1 continúa cerrado.
*CIA. CONSORCIO PALANDA YUCA SUR, Pozo Llumpak-2D apagado 24 horas por baja producción y
falla de equipo BES.
*CIA. ORION ENERGY OCANOPB S.A., Pozos Ocano-1 y Peña Blanca -1 apado 24 horas por
problemas mecánicos en bombas.
TOTAL PETROLEO NETO
562.249
PRODUCCION DIARIA DE PETROLEO NETO DE
CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS)
MES: ENERO 2015
FECHA DE REPORTE: 30 DE ENERO DE 2015
COMPARATIVO DIARIO
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
(CERRADO A LAS 06H00)
TOTAL
PETROAMAZONAS
RIO NAPO ESTADO+
EP
MIXTAS
01-01-15
359.837
75.007 434.844
02-01-15
03-01-15
04-01-15
05-01-15
06-01-15
07-01-15
08-01-15
09-01-15
10-01-15
11-01-15
12-01-15
13-01-15
14-01-15
15-01-15
356.837
357.179
357.704
355.405
356.546
359.367
359.892
359.546
358.193
360.184
359.399
358.813
358.045
358.034
355.959
356.842
356.798
355.886
354.739
354.339
355.028
356.068
356.427
357.336
357.094
355.944
358.606
358.356
75.002
75.002
74.831
74.838
74.851
74.805
74.568
74.507
74.405
74.501
74.519
74.205
74.052
74.026
73.400
73.375
73.210
73.215
73.226
73.232
73.249
73.198
73.107
73.159
73.161
73.402
73.707
73.992
16-01-15
17-01-15
18-01-15
19-01-15
20-01-15
21-01-15
22-01-15
23-01-15
24-01-15
25-01-15
26-01-15
27-01-15
28-01-15
29-01-15
30-01-15
31-01-15
COMPAÑIAS
ESTADO
PETROAMAZONAS
EP
RÍO NAPO
TOTAL ESTADO+
MIXTAS
PRODUCCION
ACTUAL
358.356
73.992
432.348
431.839
432.181
432.535
430.243
431.397
434.172
434.460
434.053
432.598
434.684
433.918
433.018
432.096
432.060
429.359
430.217
430.008
429.100
427.964
427.570
428.277
429.266
429.534
430.495
430.255
429.347
432.313
432.348
PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS)
MES: ENERO 2015
FECHA DE OPERACIÓN
CAMPO PUMA S.A
(CONSORCIO PEGASO)
TECPECUADOR
CONSORCIO PETROSUD
PETRORIVA
CONSORCIO PALANDA
YUCASUR
PETROBELL
PETRORIENTAL (BLOQUE
14 Y 17)
REPSOL AREA BLOQUE
16 + TIVACUNO
ANDES PETROLEUM
TARAPOA
AGIP OIL
ENAP SIPEC
GENTE OIL ECUADOR
ORION ENERGY
OCANOPB S.A.
ORIONOIL ER S.A.
PACIFPETROL
TOTAL COMPAÑIAS
PRIVADAS
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
COMPARATIVO DIARIO
01-01-15
723
2.800
4.594
3.352
2.834
11.488
30.343
34.540
11.574
12.837
8.030
1.475
1.721
1.120
127.434
02-01-15
616
2.804
4.601
3.325
2.828
11.458
29.041
34.556
11.572
12.997
6.650
1.453
1.711
1.169
124.782
03-01-15
470
2.857
4.665
3.327
2.822
11.523
30.147
34.363
11.592
12.492
6.646
1.423
1.706
1.139
125.171
04-01-15
461
2.798
4.700
3.308
2.814
11.412
30.012
34.263
11.589
12.474
6.638
1.450
1.708
1.160
124.787
05-01-15
462
2.759
4.707
3.224
2.654
11.278
30.367
34.454
11.589
12.239
6.635
1.421
1.713
1.178
124.682
06-01-15
458
2.828
4.722
3.123
0
11.209
29.389
34.462
11.579
12.203
6.640
1.414
1.701
1.143
120.871
07-01-15
457
2.756
4.730
3.158
0
11.432
30.044
34.266
11.568
12.289
7.400
1.404
1.697
1.188
122.387
08-01-15
456
2.781
4.740
3.216
0
11.507
30.115
34.425
11.568
12.336
7.226
1.405
1.696
1.178
122.649
09-01-15
451
2.799
4.750
3.198
0
11.603
30.105
34.844
11.577
13.403
7.426
1.404
1.696
1.172
124.428
10-01-15
460
2.798
4.771
3.095
0
11.720
30.400
34.913
11.579
13.636
7.571
1.404
1.698
1.160
125.207
11-01-15
459
2.807
4.800
3.182
0
11.805
30.410
34.833
11.584
13.688
7.550
1.404
1.691
1.150
125.363
12-01-15
461
2.823
4.798
2.993
0
12.070
30.374
33.651
11.600
13.729
7.362
1.405
1.690
1.133
124.089
13-01-15
460
2.878
4.818
3.112
1.203
11.902
30.369
33.592
11.603
13.701
7.301
1.406
1.678
1.134
125.158
14-01-15
460
2.820
4.822
3.077
2.449
11.942
30.339
33.666
11.602
13.672
7.303
1.411
1.679
1.133
126.375
15-01-15
457
2.840
4.826
2.972
2.489
11.809
30.026
33.558
11.632
12.619
7.241
1.409
1.681
1.127
124.686
16-01-15
459
2.860
4.845
3.067
2.498
11.807
29.024
33.569
11.688
13.483
7.320
1.401
1.690
1.129
124.839
17-01-15
460
2.857
4.845
3.040
2.728
11.951
30.366
34.750
11.718
14.129
7.411
1.404
1.695
1.119
128.474
18-01-15
462
2.856
4.845
3.031
2.885
11.831
30.362
34.930
11.758
14.140
7.805
1.380
1.681
1.133
129.100
19-01-15
459
2.822
4.845
3.013
2.894
11.845
30.233
34.943
11.765
13.335
7.932
1.384
1.681
1.159
128.309
20-01-15
463
2.830
4.809
2.983
2.831
11.821
30.222
35.086
11.737
12.027
6.915
1.365
1.678
1.138
125.905
21-01-15
459
2.876
4.329
2.950
2.902
11.713
30.194
34.931
11.760
13.035
7.515
1.394
1.695
1.128
126.883
22-01-15
440
2.822
4.108
2.985
2.862
11.826
30.158
34.859
11.767
13.647
7.302
1.400
1.717
1.139
127.032
23-01-15
457
2.816
4.107
2.987
2.810
11.873
30.096
34.843
11.768
13.853
7.071
1.393
1.832
1.155
127.060
24-01-15
459
2.849
4.097
2.989
2.774
12.008
30.073
34.952
11.743
14.057
7.050
1.404
1.835
1.138
127.429
25-01-15
456
2.826
4.086
2.993
2.761
12.085
29.973
35.087
11.755
14.325
7.010
1.400
1.899
1.151
127.808
26-01-15
458
2.852
4.072
2.950
2.732
12.039
30.159
35.606
11.710
14.541
7.005
1.392
1.911
1.159
128.586
27-01-15
458
2.850
4.052
2.909
2.754
12.051
30.239
35.617
11.730
14.540
7.007
1.382
2.028
1.158
128.777
28-01-15
481
2.834
4.054
2.911
2.734
11.903
30.453
35.887
11.723
14.341
7.015
1.320
2.001
1.119
128.778
29-01-15
831
2.846
4.052
2.881
2.716
11.863
30.377
36.435
11.759
14.281
7.248
1.377
2.066
1.168
129.900
487
2.826
4.558
3.081
2.034
11.751
30.118
34.686
11.662
13.381
7.215
1.403
1.754
1.148
126.102
PROMEDIO
ENERO 2015
META
836
2.589
4.925
1.880
2.873
12.494
29.841
30.731
12.115
12.601
10.645
1.064
671
1.695
124.960
DIFERENCIA
REAL -META
ENERO 2015
-349
237
-367
1.201
-839
-743
277
3.955
-453
780
-3.430
339
1.083
-547
1.141
% DE META
ENERO 2015
58,2%
109,1%
92,6%
163,9%
70,8%
94,1%
100,9%
112,9%
96,3%
106,2%
67,8%
131,9%
261,3%
67,7%
100,9%
30-01-15
31-01-15
PROMEDIO
ENERO 2015
REAL