PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 30 DE ENERO DE 2015 MES: ENERO 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-01-15 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 562.277 556.620 557.352 557.321 554.925 552.268 556.559 557.109 558.481 557.805 560.048 558.007 558.176 558.472 556.746 554.198 558.690 559.108 557.409 553.869 554.454 555.309 556.326 556.963 558.303 558.841 558.124 561.091 562.249 127.434 124.782 125.171 124.787 124.682 120.871 122.387 122.649 124.428 125.207 125.363 124.089 125.158 126.375 124.686 124.839 128.474 129.100 128.309 125.905 126.883 127.032 127.060 127.429 127.808 128.586 128.777 128.778 129.900 434.844 431.839 432.181 432.535 430.243 431.397 434.172 434.460 434.053 432.598 434.684 433.918 433.018 432.096 432.060 429.359 430.217 430.008 429.100 427.964 427.570 428.277 429.266 429.534 430.495 430.255 429.347 432.313 432.348 1.158 1.123 35 30-01-15 31-01-15 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP, Bloque-61: pozo Auca Central- 86 continua apagado 16hrs. en PROMEDIO ENERO 2015 REAL 557.486 126.102 431.385 PROMEDIO ENERO 2015 META 576.730 124.960 451.770 DIFERENCIA REAL-META ENERO 2015 -19.244 1.141 -20.385 % DE META EN ENERO 2015 96,7% 100,9% 95,5% reacondicionamiento (bajar equipo BES). Bloque 7: pozos Oso A: -37-41-57 limitación de producción por lato BSW. Bloque-21 pozo Yuralapa-10 apagado 24 hrs. por falla de equipo BES en espera de reacondicionamiento. Bloque-57: pozo Shushufindi- 208 apagado 16hrs. por falla no recuperable producción (falla de equipo BES), pozo Drago Norte-56 apagado 24 hrs. por baja presión de reservorio – depletación. Bloque-15: varios pozos Itaya, Indillana, Jivino, Limoncocha, Laguna, Paka Sur, Yanaquincha Oeste: continúan cerrados por falla eléctrica. Bloque-12 varios pozos Edén Yuturi, Pañacocha continúan cerrados por falla eléctrica. *CIA. TECPECUADOR S.A. Pozo Bermejo Sur-08 apagado esperando trabajos de pulling, continúa. Bermejo Norte-6 apagado 9 horas por mantenimiento preventivo+correctivo calibraciónn de válvulas de motor. *CIA. REPSOL ECUADOR S.A, 6 pozos cerrados temporalmente por restricción de producción por facilidades ( alto nivel de agua en tanques). Además pozos: Amo B9 -B8 apagado por baja producción, GintaA50, Daimi-A12, Iro-A8 e Iro-A9 esperando reacondicionamiento, Ginta -B12 pozo en reacondicionamiento, IroB20 falla en bombas de reinyección, Trabajos varios de mantenimiento de facilidades. *CIA. PETROBELL, Pozos Cachiyacu-1 continúa cerrado por problemas con la Comunidad Huarani. *CIA. PEGASO S.A, Pozos: Puma-12 falla en la completación, Puma-9 esperando reacondicionamiento por baja producción *RIO NAPO CEM , Pozos: Sacha-208D-317H apagado por bajo aporte, Sacha-445D falla eléctrica de equipo BES (baja presión intake, Sacha-62A apagado 4 horas por mantenimiento de MTU, mas 3 pozos cerrados por reacondicionamiento. CIAS./CONTRATOS PETROAMAZONAS EP RIO NAPO COMPAÑIAS PRIVADAS *CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8-31 cerrado por bajo aporte, Homiguero Sur- 01 PRODUCCION ACTUAL 358.356 73.992 129.900 esperando reacondicionamiento, Hormiguero-26 cerrado en reacondicionamiento, Hormiguero-19-27 apagado temporalmente por mantenimiento de BES. *CONSORCIO PETROSUD PETRORIVA, Pozo Pindo-13 apagado esperando reacondicionamiento. *CIA. GENTE OIL ECUADOR, Pozos: Singue-A1 continúa cerrado. *CIA. CONSORCIO PALANDA YUCA SUR, Pozo Llumpak-2D apagado 24 horas por baja producción y falla de equipo BES. *CIA. ORION ENERGY OCANOPB S.A., Pozos Ocano-1 y Peña Blanca -1 apado 24 horas por problemas mecánicos en bombas. TOTAL PETROLEO NETO 562.249 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: ENERO 2015 FECHA DE REPORTE: 30 DE ENERO DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-01-15 359.837 75.007 434.844 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 356.837 357.179 357.704 355.405 356.546 359.367 359.892 359.546 358.193 360.184 359.399 358.813 358.045 358.034 355.959 356.842 356.798 355.886 354.739 354.339 355.028 356.068 356.427 357.336 357.094 355.944 358.606 358.356 75.002 75.002 74.831 74.838 74.851 74.805 74.568 74.507 74.405 74.501 74.519 74.205 74.052 74.026 73.400 73.375 73.210 73.215 73.226 73.232 73.249 73.198 73.107 73.159 73.161 73.402 73.707 73.992 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 358.356 73.992 432.348 431.839 432.181 432.535 430.243 431.397 434.172 434.460 434.053 432.598 434.684 433.918 433.018 432.096 432.060 429.359 430.217 430.008 429.100 427.964 427.570 428.277 429.266 429.534 430.495 430.255 429.347 432.313 432.348 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: ENERO 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-01-15 723 2.800 4.594 3.352 2.834 11.488 30.343 34.540 11.574 12.837 8.030 1.475 1.721 1.120 127.434 02-01-15 616 2.804 4.601 3.325 2.828 11.458 29.041 34.556 11.572 12.997 6.650 1.453 1.711 1.169 124.782 03-01-15 470 2.857 4.665 3.327 2.822 11.523 30.147 34.363 11.592 12.492 6.646 1.423 1.706 1.139 125.171 04-01-15 461 2.798 4.700 3.308 2.814 11.412 30.012 34.263 11.589 12.474 6.638 1.450 1.708 1.160 124.787 05-01-15 462 2.759 4.707 3.224 2.654 11.278 30.367 34.454 11.589 12.239 6.635 1.421 1.713 1.178 124.682 06-01-15 458 2.828 4.722 3.123 0 11.209 29.389 34.462 11.579 12.203 6.640 1.414 1.701 1.143 120.871 07-01-15 457 2.756 4.730 3.158 0 11.432 30.044 34.266 11.568 12.289 7.400 1.404 1.697 1.188 122.387 08-01-15 456 2.781 4.740 3.216 0 11.507 30.115 34.425 11.568 12.336 7.226 1.405 1.696 1.178 122.649 09-01-15 451 2.799 4.750 3.198 0 11.603 30.105 34.844 11.577 13.403 7.426 1.404 1.696 1.172 124.428 10-01-15 460 2.798 4.771 3.095 0 11.720 30.400 34.913 11.579 13.636 7.571 1.404 1.698 1.160 125.207 11-01-15 459 2.807 4.800 3.182 0 11.805 30.410 34.833 11.584 13.688 7.550 1.404 1.691 1.150 125.363 12-01-15 461 2.823 4.798 2.993 0 12.070 30.374 33.651 11.600 13.729 7.362 1.405 1.690 1.133 124.089 13-01-15 460 2.878 4.818 3.112 1.203 11.902 30.369 33.592 11.603 13.701 7.301 1.406 1.678 1.134 125.158 14-01-15 460 2.820 4.822 3.077 2.449 11.942 30.339 33.666 11.602 13.672 7.303 1.411 1.679 1.133 126.375 15-01-15 457 2.840 4.826 2.972 2.489 11.809 30.026 33.558 11.632 12.619 7.241 1.409 1.681 1.127 124.686 16-01-15 459 2.860 4.845 3.067 2.498 11.807 29.024 33.569 11.688 13.483 7.320 1.401 1.690 1.129 124.839 17-01-15 460 2.857 4.845 3.040 2.728 11.951 30.366 34.750 11.718 14.129 7.411 1.404 1.695 1.119 128.474 18-01-15 462 2.856 4.845 3.031 2.885 11.831 30.362 34.930 11.758 14.140 7.805 1.380 1.681 1.133 129.100 19-01-15 459 2.822 4.845 3.013 2.894 11.845 30.233 34.943 11.765 13.335 7.932 1.384 1.681 1.159 128.309 20-01-15 463 2.830 4.809 2.983 2.831 11.821 30.222 35.086 11.737 12.027 6.915 1.365 1.678 1.138 125.905 21-01-15 459 2.876 4.329 2.950 2.902 11.713 30.194 34.931 11.760 13.035 7.515 1.394 1.695 1.128 126.883 22-01-15 440 2.822 4.108 2.985 2.862 11.826 30.158 34.859 11.767 13.647 7.302 1.400 1.717 1.139 127.032 23-01-15 457 2.816 4.107 2.987 2.810 11.873 30.096 34.843 11.768 13.853 7.071 1.393 1.832 1.155 127.060 24-01-15 459 2.849 4.097 2.989 2.774 12.008 30.073 34.952 11.743 14.057 7.050 1.404 1.835 1.138 127.429 25-01-15 456 2.826 4.086 2.993 2.761 12.085 29.973 35.087 11.755 14.325 7.010 1.400 1.899 1.151 127.808 26-01-15 458 2.852 4.072 2.950 2.732 12.039 30.159 35.606 11.710 14.541 7.005 1.392 1.911 1.159 128.586 27-01-15 458 2.850 4.052 2.909 2.754 12.051 30.239 35.617 11.730 14.540 7.007 1.382 2.028 1.158 128.777 28-01-15 481 2.834 4.054 2.911 2.734 11.903 30.453 35.887 11.723 14.341 7.015 1.320 2.001 1.119 128.778 29-01-15 831 2.846 4.052 2.881 2.716 11.863 30.377 36.435 11.759 14.281 7.248 1.377 2.066 1.168 129.900 487 2.826 4.558 3.081 2.034 11.751 30.118 34.686 11.662 13.381 7.215 1.403 1.754 1.148 126.102 PROMEDIO ENERO 2015 META 836 2.589 4.925 1.880 2.873 12.494 29.841 30.731 12.115 12.601 10.645 1.064 671 1.695 124.960 DIFERENCIA REAL -META ENERO 2015 -349 237 -367 1.201 -839 -743 277 3.955 -453 780 -3.430 339 1.083 -547 1.141 % DE META ENERO 2015 58,2% 109,1% 92,6% 163,9% 70,8% 94,1% 100,9% 112,9% 96,3% 106,2% 67,8% 131,9% 261,3% 67,7% 100,9% 30-01-15 31-01-15 PROMEDIO ENERO 2015 REAL
© Copyright 2024