PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 20 DE ENERO DE 2015 MES: ENERO 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-01-15 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 16-01-15 17-01-15 18-01-15 19-01-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 562.277 556.620 557.352 557.321 554.925 552.268 556.559 557.109 558.481 557.805 560.048 558.007 558.176 558.472 556.746 554.198 558.690 559.108 557.431 127.434 124.782 125.171 124.787 124.682 120.871 122.387 122.649 124.428 125.207 125.363 124.089 125.158 126.375 124.686 124.839 128.474 129.100 128.331 434.844 431.839 432.181 432.535 430.243 431.397 434.172 434.460 434.053 432.598 434.684 433.918 433.018 432.096 432.060 429.359 430.217 430.008 429.100 -1.677 -769 -908 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP, BLOQUE 56: pozo Lago Agrio N-44 apagado 24 Horas no aporta, Lago PROMEDIO ENERO 2015 REAL 557.452 125.201 432.252 PROMEDIO ENERO 2015 META 576.730 124.960 451.770 DIFERENCIA REAL-META ENERO 2015 -19.278 240 -19.518 % DE META EN ENERO 2015 96,7% 100,2% 95,7% Agrio N-60 apagado 6 Horas bajo aporte + Cambio bomba + Circulan para limpieza. BLOQUE-57: pozo GUANTA-46 en reacondicionamiento, apagado 7 Horas. Se suspende evaluación para reversar bomba y bajar elementos de presión. BLOQUE-21: POZO Yuralpa CA-010HP apagado 24 horas por fase B a tierra, en espera de reacondicionamiento. BLOQUE-7: pozos OSOS 59,75 Problemas en bomba de reinyección apagados 12 horas . *CIA. TECPECUADOR S.A. Pozo Bermejo Sur-08 apagado esperando trabajos de pulling, continúa, Bermejo Sur-1009 Cambio de geometria de bomba. *CIA. REPSOL ECUADOR S.A, 6 pozos cerrados temporalmente por restricción de producción por facilidades ( alto nivel de agua en tanques), pozos: Amo B9 -B8 apagado por baja producción, Ginta-A50, DaimiA12, Iro-A8 e Iro-A9 esperando reacondicionamiento, Pozo Tivacuno-SWC7 pozo en reacondicionamiento. Trabajos varios de mantenimiento de facilidades. *CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8-31-25 esperando trabajos de reacondicionamiento, Homiguero Sur- 01 bajo aporte, Hormiguero-41 trabajos de slick line., Homiguero-10 falla en VSD. *CIA. PEGASO S.A, Pozos: Puma-12 falla en la completación, Puma-9-11 esperando reacondicionamiento. *RIO NAPO CEM, Pozos: Sacha-137 posible rotura de eje, Sacha-52 no aporta, problemas de bloqueo por gas. CIAS./CONTRATOS PRODUCCION ACTUAL *CIA. PETROBELL, Pozo Cachiyacu-1 cerrado por problemas con la Comunidad, continúa. CIA. ENAP SIPEC, Pozos: Huachito-04 apagado 14 horas pozo en w.o., Paraiso-24 apagado 10horas PETROAMAZONAS EP RIO NAPO 355.886 73.215 COMPAÑIAS PRIVADAS 128.331 TOTAL PETROLEO NETO 557.431 para pruebas de build up (cierre programado 36 horas), MDC-18 incrementa de 62.5 a 68.8 % el BSW, MDC-21 incrementa de 43.7 a 45 % el BSW. PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: ENERO 2015 FECHA DE REPORTE: 20 DE ENERO DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-01-15 359.837 75.007 434.844 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 356.837 357.179 357.704 355.405 356.546 359.367 359.892 359.546 358.193 360.184 359.399 358.813 358.045 358.034 355.959 356.842 356.798 355.886 75.002 75.002 74.831 74.838 74.851 74.805 74.568 74.507 74.405 74.501 74.519 74.205 74.052 74.026 73.400 73.375 73.210 73.215 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 355.886 73.215 429.100 431.839 432.181 432.535 430.243 431.397 434.172 434.460 434.053 432.598 434.684 433.918 433.018 432.096 432.060 429.359 430.217 430.008 429.100 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: ENERO 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-01-15 723 2.800 4.594 3.352 2.834 11.488 30.343 34.540 11.574 12.837 8.030 1.475 1.721 1.120 127.434 02-01-15 616 2.804 4.601 3.325 2.828 11.458 29.041 34.556 11.572 12.997 6.650 1.453 1.711 1.169 124.782 03-01-15 470 2.857 4.665 3.327 2.822 11.523 30.147 34.363 11.592 12.492 6.646 1.423 1.706 1.139 125.171 04-01-15 461 2.798 4.700 3.308 2.814 11.412 30.012 34.263 11.589 12.474 6.638 1.450 1.708 1.160 124.787 05-01-15 462 2.759 4.707 3.224 2.654 11.278 30.367 34.454 11.589 12.239 6.635 1.421 1.713 1.178 124.682 06-01-15 458 2.828 4.722 3.123 0 11.209 29.389 34.462 11.579 12.203 6.640 1.414 1.701 1.143 120.871 07-01-15 457 2.756 4.730 3.158 0 11.432 30.044 34.266 11.568 12.289 7.400 1.404 1.697 1.188 122.387 08-01-15 456 2.781 4.740 3.216 0 11.507 30.115 34.425 11.568 12.336 7.226 1.405 1.696 1.178 122.649 09-01-15 451 2.799 4.750 3.198 0 11.603 30.105 34.844 11.577 13.403 7.426 1.404 1.696 1.172 124.428 10-01-15 460 2.798 4.771 3.095 0 11.720 30.400 34.913 11.579 13.636 7.571 1.404 1.698 1.160 125.207 11-01-15 459 2.807 4.800 3.182 0 11.805 30.410 34.833 11.584 13.688 7.550 1.404 1.691 1.150 125.363 12-01-15 461 2.823 4.798 2.993 0 12.070 30.374 33.651 11.600 13.729 7.362 1.405 1.690 1.133 124.089 13-01-15 460 2.878 4.818 3.112 1.203 11.902 30.369 33.592 11.603 13.701 7.301 1.406 1.678 1.134 125.158 14-01-15 460 2.820 4.822 3.077 2.449 11.942 30.339 33.666 11.602 13.672 7.303 1.411 1.679 1.133 126.375 15-01-15 457 2.840 4.826 2.972 2.489 11.809 30.026 33.558 11.632 12.619 7.241 1.409 1.681 1.127 124.686 16-01-15 459 2.860 4.845 3.067 2.498 11.807 29.024 33.569 11.688 13.483 7.320 1.401 1.690 1.129 124.839 17-01-15 460 2.857 4.845 3.040 2.728 11.951 30.366 34.750 11.718 14.129 7.411 1.404 1.695 1.119 128.474 18-01-15 462 2.856 4.845 3.031 2.885 11.831 30.362 34.930 11.758 14.140 7.805 1.380 1.681 1.133 129.100 19-01-15 459 2.822 4.845 3.013 2.894 11.845 30.239 34.960 11.765 13.335 7.932 1.384 1.681 1.159 128.331 482 2.818 4.759 3.148 1.637 11.663 30.078 34.347 11.618 13.126 7.268 1.414 1.695 1.149 125.201 PROMEDIO ENERO 2015 META 836 2.589 4.925 1.880 2.873 12.494 29.841 30.731 12.115 12.601 10.645 1.064 671 1.695 124.960 DIFERENCIA REAL -META ENERO 2015 -354 229 -166 1.268 -1.236 -831 237 3.616 -497 525 -3.377 350 1.024 -546 240 % DE META ENERO 2015 57,6% 108,8% 96,6% 167,5% 57,0% 93,3% 100,8% 111,8% 95,9% 104,2% 68,3% 132,9% 252,5% 67,8% 100,2% 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 PROMEDIO ENERO 2015 REAL
© Copyright 2024