produccion diaria de petroleo neto de campo a nivel nacional

PRODUCCION DIARIA DE PETROLEO NETO
DE CAMPO A NIVEL NACIONAL (BLS)
FECHA DE REPORTE: 21 DE ENERO DE 2015
MES: ENERO 2015
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
01-01-15
02-01-15
03-01-15
04-01-15
05-01-15
06-01-15
07-01-15
08-01-15
09-01-15
10-01-15
11-01-15
12-01-15
13-01-15
14-01-15
15-01-15
16-01-15
17-01-15
18-01-15
19-01-15
20-01-15
TOTAL NACIONAL
TOTAL CIAS.
PRIVADAS
*TOTAL PETROAMAZONAS EP+RIO
NAPO
562.277
556.620
557.352
557.321
554.925
552.268
556.559
557.109
558.481
557.805
560.048
558.007
558.176
558.472
556.746
554.198
558.690
559.108
557.409
553.893
127.434
124.782
125.171
124.787
124.682
120.871
122.387
122.649
124.428
125.207
125.363
124.089
125.158
126.375
124.686
124.839
128.474
129.100
128.309
125.929
434.844
431.839
432.181
432.535
430.243
431.397
434.172
434.460
434.053
432.598
434.684
433.918
433.018
432.096
432.060
429.359
430.217
430.008
429.100
427.964
-1.699
-791
-908
21-01-15
22-01-15
23-01-15
24-01-15
25-01-15
26-01-15
27-01-15
28-01-15
29-01-15
30-01-15
31-01-15
DIFERENCIA
HOY-AYER
NOVEDADES:
*CIA PETROAMAZONAS EP, BLOQUE 61 pozos: AUCA CENTRAL 155 apagado 2 horas por problemas
PROMEDIO
ENERO 2015
REAL
557.273
125.236
432.037
PROMEDIO
ENERO 2015
META
576.730
124.960
451.770
DIFERENCIA
REAL-META
ENERO 2015
-19.457
276
-19.733
% DE META EN
ENERO 2015
96,6%
100,2%
95,6%
de generación. BLOQUE21: POZO Yuralpa CA-010HP apagado 24 horas por falla en fase B a tierra, espera
Reacondicionamiento. BLOQUE 7: pozos OSOS 59,75 problemas con la bomba de reinyección apagados 18
horas . BLOQUE 15: INDILLANA A-16 rotura en casing, INDILLANA 2,3,5,9 falla eléctrricos por Sobrecorriente.
LIMONCOCHA H-37A, H-39,L-26, 11,13,15 bajo flujo, rotura de tubing, arenamIento. BLOQUE 57: Pozos:
Drago 035 pozo no aporta, Aguarico-03-30-29 ; Shushufindi-89 incrementa BSW, Aguarico-33 declina fluido y
baja presión de inyección, Dragos-022- 024- 028- 030- 055 apagado 3 horas por falla de generador. BLOQUE
56 Pozo Lago Agrio-44 cerrado esperando reacondicionamiento.
*CIA. TECPECUADOR S.A. Pozo Bermejo Sur-08 apagado esperando trabajos de pulling, continúa.
*CIA. REPSOL ECUADOR S.A, 6 pozos cerrados temporalmente por restricción de producción por
facilidades ( alto nivel de agua en tanques), pozos: Amo B9 -B8 apagado por baja producción, Ginta-A50, DaimiA12, Iro-A8 e Iro-A9 esperando reacondicionamiento, Tivacuno-SWC7 pozo en reacondicionamiento, CapironA9 y Ginta-B6 falla en equipo BES. Trabajos varios de mantenimiento de facilidades.
*CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8-31 esperando trabajos de reacondicionamiento,
Homiguero Sur- 01 bajo aporte, Hormiguero-41y Tapir Norte-1 trabajos de mantenimiento de MTU, Homiguero10 falla en VSD.
*CIA. PEGASO S.A, Pozos: Puma-12 falla en la completación, Puma-9-11 esperando reacondicionamiento.
*RIO NAPO CEM, Pozos SACHA 1, 135,230 y SACHA SUR 212 : realizando trabajos de
reacondicionamiento. SACHA CENTRAL 232T cerrado por bajo aporte.
CIAS./CONTRATOS
PRODUCCION ACTUAL
*CIA. PETROBELL, Pozos: Tiguino-4-6RE1-19-20 apagado temporalmente por falla en generación eléctrica.
CIA. ENAP SIPEC ,Pozos: Paraiso-01-03-06-07-08-11-012-18-19-20-23 apagado una hora por falla en
PETROAMAZONAS EP
RIO NAPO
354.739
73.226
COMPAÑIAS PRIVADAS
125.929
TOTAL PETROLEO NETO
553.893
sistema de generación eléctrica, Pozo Huachito-4 cerrado por trabajos de reacondicionamiento.
CIA. GENTE OIL ECUADOR, Pozo Singue-B3 apagado 13 horas por mantenimiento de equipo BES.
PRODUCCION DIARIA DE PETROLEO NETO DE
CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS)
MES: ENERO 2015
FECHA DE REPORTE: 21 DE ENERO DE 2015
COMPARATIVO DIARIO
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
(CERRADO A LAS 06H00)
TOTAL
PETROAMAZONAS
RIO NAPO ESTADO+
EP
MIXTAS
01-01-15
359.837
75.007 434.844
02-01-15
03-01-15
04-01-15
05-01-15
06-01-15
07-01-15
08-01-15
09-01-15
10-01-15
11-01-15
12-01-15
13-01-15
14-01-15
15-01-15
356.837
357.179
357.704
355.405
356.546
359.367
359.892
359.546
358.193
360.184
359.399
358.813
358.045
358.034
355.959
356.842
356.798
355.886
354.739
75.002
75.002
74.831
74.838
74.851
74.805
74.568
74.507
74.405
74.501
74.519
74.205
74.052
74.026
73.400
73.375
73.210
73.215
73.226
16-01-15
17-01-15
18-01-15
19-01-15
20-01-15
21-01-15
22-01-15
23-01-15
24-01-15
25-01-15
26-01-15
27-01-15
28-01-15
29-01-15
30-01-15
31-01-15
COMPAÑIAS
ESTADO
PETROAMAZONAS
EP
RÍO NAPO
TOTAL ESTADO+
MIXTAS
PRODUCCION
ACTUAL
354.739
73.226
427.964
431.839
432.181
432.535
430.243
431.397
434.172
434.460
434.053
432.598
434.684
433.918
433.018
432.096
432.060
429.359
430.217
430.008
429.100
427.964
PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS)
MES: ENERO 2015
FECHA DE OPERACIÓN
CAMPO PUMA S.A
(CONSORCIO PEGASO)
TECPECUADOR
CONSORCIO PETROSUD
PETRORIVA
CONSORCIO PALANDA
YUCASUR
PETROBELL
PETRORIENTAL (BLOQUE
14 Y 17)
REPSOL AREA BLOQUE
16 + TIVACUNO
ANDES PETROLEUM
TARAPOA
AGIP OIL
ENAP SIPEC
GENTE OIL ECUADOR
ORION ENERGY
OCANOPB S.A.
ORIONOIL ER S.A.
PACIFPETROL
TOTAL COMPAÑIAS
PRIVADAS
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
COMPARATIVO DIARIO
01-01-15
723
2.800
4.594
3.352
2.834
11.488
30.343
34.540
11.574
12.837
8.030
1.475
1.721
1.120
127.434
02-01-15
616
2.804
4.601
3.325
2.828
11.458
29.041
34.556
11.572
12.997
6.650
1.453
1.711
1.169
124.782
03-01-15
470
2.857
4.665
3.327
2.822
11.523
30.147
34.363
11.592
12.492
6.646
1.423
1.706
1.139
125.171
04-01-15
461
2.798
4.700
3.308
2.814
11.412
30.012
34.263
11.589
12.474
6.638
1.450
1.708
1.160
124.787
05-01-15
462
2.759
4.707
3.224
2.654
11.278
30.367
34.454
11.589
12.239
6.635
1.421
1.713
1.178
124.682
06-01-15
458
2.828
4.722
3.123
0
11.209
29.389
34.462
11.579
12.203
6.640
1.414
1.701
1.143
120.871
07-01-15
457
2.756
4.730
3.158
0
11.432
30.044
34.266
11.568
12.289
7.400
1.404
1.697
1.188
122.387
08-01-15
456
2.781
4.740
3.216
0
11.507
30.115
34.425
11.568
12.336
7.226
1.405
1.696
1.178
122.649
09-01-15
451
2.799
4.750
3.198
0
11.603
30.105
34.844
11.577
13.403
7.426
1.404
1.696
1.172
124.428
10-01-15
460
2.798
4.771
3.095
0
11.720
30.400
34.913
11.579
13.636
7.571
1.404
1.698
1.160
125.207
11-01-15
459
2.807
4.800
3.182
0
11.805
30.410
34.833
11.584
13.688
7.550
1.404
1.691
1.150
125.363
12-01-15
461
2.823
4.798
2.993
0
12.070
30.374
33.651
11.600
13.729
7.362
1.405
1.690
1.133
124.089
13-01-15
460
2.878
4.818
3.112
1.203
11.902
30.369
33.592
11.603
13.701
7.301
1.406
1.678
1.134
125.158
14-01-15
460
2.820
4.822
3.077
2.449
11.942
30.339
33.666
11.602
13.672
7.303
1.411
1.679
1.133
126.375
15-01-15
457
2.840
4.826
2.972
2.489
11.809
30.026
33.558
11.632
12.619
7.241
1.409
1.681
1.127
124.686
16-01-15
459
2.860
4.845
3.067
2.498
11.807
29.024
33.569
11.688
13.483
7.320
1.401
1.690
1.129
124.839
17-01-15
460
2.857
4.845
3.040
2.728
11.951
30.366
34.750
11.718
14.129
7.411
1.404
1.695
1.119
128.474
18-01-15
462
2.856
4.845
3.031
2.885
11.831
30.362
34.930
11.758
14.140
7.805
1.380
1.681
1.133
129.100
19-01-15
459
2.822
4.845
3.013
2.894
11.845
30.233
34.943
11.765
13.335
7.932
1.384
1.681
1.159
128.309
20-01-15
463
2.830
4.809
2.983
2.831
11.821
30.227
35.105
11.737
12.027
6.915
1.365
1.678
1.138
125.929
481
2.819
4.762
3.140
1.696
11.671
30.085
34.384
11.624
13.071
7.250
1.411
1.695
1.148
125.236
PROMEDIO
ENERO 2015
META
836
2.589
4.925
1.880
2.873
12.494
29.841
30.731
12.115
12.601
10.645
1.064
671
1.695
124.960
DIFERENCIA
REAL -META
ENERO 2015
-355
230
-163
1.260
-1.177
-823
244
3.653
-491
470
-3.395
347
1.023
-547
276
% DE META
ENERO 2015
57,5%
108,9%
96,7%
167,0%
59,0%
93,4%
100,8%
111,9%
95,9%
103,7%
68,1%
132,6%
252,4%
67,7%
100,2%
21-01-15
22-01-15
23-01-15
24-01-15
25-01-15
26-01-15
27-01-15
28-01-15
29-01-15
30-01-15
31-01-15
PROMEDIO
ENERO 2015
REAL