PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 09 DE ENERO DE 2015 MES: ENERO 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-01-15 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 562.277 556.620 557.352 557.321 554.925 552.268 556.559 557.132 127.434 124.782 125.171 124.787 124.682 120.871 122.387 122.672 434.844 431.839 432.181 432.535 430.243 431.397 434.172 434.460 573 285 287 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP, BLOQUE 58: CUYABENO 8, desplazan bomba jet. SECOYA-48, esperan PROMEDIO ENERO 2015 REAL 556.807 124.098 432.709 PROMEDIO ENERO 2015 META 576.730 124.960 451.770 DIFERENCIA REAL-META ENERO 2015 -19.923 -862 -19.061 % DE META EN ENERO 2015 96,5% 99,3% 95,8% work over. SECOYA-24, recuperan varilla. BLOQUE 61: AUCA CENTRAL 5, Incrementan BSW. AUCA CENTRAL 94, monitoreando producción y BSW. CONONACO 15, Cerrado para build up. BLOQUE-44: PUCUNA-10, 14, falla mecánica en planta. BLOQUE 7: OSO-60 entra en work over, OSO 112, 114, migración de cargas a tablero definitivo. *CIA. TECPECUADOR S.A. Pozo Bermejo Sur-08-17 apagado esperando trabajos de pulling, continúa. *CIA. REPSOL ECUADOR S.A, 16 pozos cerrados temporalmente por restricción de producción por facilidades (alto nivel de agua en tanques), pozos: Amo B-9 cerrado por baja producción, Amo B-8 falla de BES, Daimi-A12, Iro-A8 e Iro-A9, esperando reacondicionamiento, Pozo Daimi-A23WD cerrado en reacondiconamiento, Ginta-A19 falla en instrumentos. Trabajos varios de mantenimiento de facilidades. *CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8-31 bajo aporte, Homiguero Sur- 01, Hormiguero-31 bajo aporte, Hormiguero-25-41 apagado por build up, continúa. *CIA. PEGASO S.A, Pozos: Puma-12 falla en la completación, Puma-9-11 esperando reacondicionamiento. *CÍA CONSORCIO PALANDA YUCA SUR., Pozos: Llumpak-1D incremento de BSW. Yuca Sur-8D bajo aporte. CIAS./CONTRATOS PRODUCCION ACTUAL *CIA. ANDES PETROLEUM ECUADOR LTD., pozos: Fanny 18B-163 y 164 apagados 4 horas para cambio de MTU, Fanny 18B-61 apagado a las 02H00 por sobre carga. Colibri-6 arranca a las 17H00. Mariann-6 apagado 7 horas para manatenimento de bomba Jet, Mariann-23 apagado 7 horas por falla de UBH. Fanny 18B163 y 164 arrancan las 18H00, Mariann 4A-1 arranca a las 16H30 finaliza Work Over, Fanny 18B-44 arranca a las 20H00 finaliza Work Over. Colibri-6 apagado 24 horas. *CIA. RIO NAPO CEM, Pozos: Sacha-112 cambio de bomba, Sacha-246 atascamiento de motor, Sacha- PETROAMAZONAS EP RIO NAPO COMPAÑIAS PRIVADAS 359.892 74.568 180 reubicación de líneas, Sacha-448, bajo aporte, Sacha-322-372 alta temperatura del motor. *CIA. ENAP SIPEC: Pozos: MDC-05 apagado, trabajos de reacondicionamiento, Paraiso-2 apagado una hora por mantenimiento de generador. 122.672 *CIA. PETROBELL: SIN DATOS DE LA OPERADORA PETROBELL, TODO EL PERSONAL , Y FUNCIONARIO DE ARCH-CO EVACUA CAMPAMENTO POR CIERRE DE CAMPO Y CONFLICTOS CON LA COMUNIDAD WAORANI, CONTINUA. TOTAL PETROLEO NETO 557.132 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: ENERO 2015 FECHA DE REPORTE: 09 DE ENERO DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-01-15 359.837 75.007 434.844 02-01-15 03-01-15 04-01-15 05-01-15 06-01-15 07-01-15 08-01-15 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 356.837 357.179 357.704 355.405 356.546 359.367 359.892 75.002 75.002 74.831 74.838 74.851 74.805 74.568 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 359.892 74.568 434.460 431.839 432.181 432.535 430.243 431.397 434.172 434.460 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: ENERO 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-01-15 723 2.800 4.594 3.352 2.834 11.488 30.343 34.540 11.574 12.837 8.030 1.475 1.721 1.120 127.434 02-01-15 616 2.804 4.601 3.325 2.828 11.458 29.041 34.556 11.572 12.997 6.650 1.453 1.711 1.169 124.782 03-01-15 470 2.857 4.665 3.327 2.822 11.523 30.147 34.363 11.592 12.492 6.646 1.423 1.706 1.139 125.171 04-01-15 461 2.798 4.700 3.308 2.814 11.412 30.012 34.263 11.589 12.474 6.638 1.450 1.708 1.160 124.787 05-01-15 462 2.759 4.707 3.224 2.654 11.278 30.367 34.454 11.589 12.239 6.635 1.421 1.713 1.178 124.682 06-01-15 458 2.828 4.722 3.123 0 11.209 29.389 34.462 11.579 12.203 6.640 1.414 1.701 1.143 120.871 07-01-15 457 2.756 4.730 3.158 0 11.432 30.044 34.266 11.568 12.289 7.400 1.404 1.697 1.188 122.387 08-01-15 456 2.781 4.740 3.216 0 11.507 30.120 34.443 11.568 12.336 7.226 1.405 1.696 1.178 122.672 513 2.798 4.682 3.254 1.744 11.413 29.933 34.418 11.579 12.483 6.983 1.431 1.707 1.159 124.098 PROMEDIO ENERO 2015 META 836 2.589 4.925 1.880 2.873 12.494 29.841 30.731 12.115 12.601 10.645 1.064 671 1.695 124.960 DIFERENCIA REAL -META ENERO 2015 -323 209 -243 1.374 -1.129 -1.081 92 3.687 -536 -118 -3.662 367 1.035 -536 -862 % DE META ENERO 2015 61,3% 108,1% 95,1% 173,1% 60,7% 91,4% 100,3% 112,0% 95,6% 99,1% 65,6% 134,5% 254,2% 68,4% 99,3% 09-01-15 10-01-15 11-01-15 12-01-15 13-01-15 14-01-15 15-01-15 16-01-15 17-01-15 18-01-15 19-01-15 20-01-15 21-01-15 22-01-15 23-01-15 24-01-15 25-01-15 26-01-15 27-01-15 28-01-15 29-01-15 30-01-15 31-01-15 PROMEDIO ENERO 2015 REAL
© Copyright 2024