Location - Pro Ecuador

Cumbre de Inversiones Ecuador 2016
Investment Summit
Ministerio de Comercio Exterior - PROECUADOR
Strategic Investment in energy
projects
Adrián Moreno Díaz
Undersecretary of Renewable Energy
and Energy Efficiency
Octubre 2016
VII Seminario Latinoamericano y del Caribe de Eficiencia Energética
Importance of the direct foreign investment
“…in the productive matrix is set the essence of the
economical and social reality of the countries. For
Ecuador, its transformation becomes the main action in
order to solve the unemployment, poverty and inequity,
….where the direct foreign investment as complement to
the national investment, complies a main role in the
national economical development, and respect the
responsibility of the employees, the society, and the
environment…”
National Plan of Good Living
Investment projects in non
conventional renewable
energy (NCRE)
Small Hydro
Power Plants
INFIERNILLOS 19,64 MW
Location:
Saraguro Canton – province of Loja
Characteristics of the project:
River:
Average height:
Type of hydro plant:
Design water flow:
Net head:
Turbine type:
Installed power:
Annual average energy:
Factor of plant:
Interconnection:
Main data:
• 30 thousand habitants (13,36%
urban, 86,64% rural);
• 70% of economically active
population;
• 9449 houses in the canton have
electrical service.
Paquishapa
1500 masl
Pass-throu
7,2 m³/s
312 m
Pelton of horizontal shaft
19,64 MW
120 GWh
0,70
S/E Saraguro at 69 kV of
16,8 km
Costs:
Investment: 39,7 MMUSD
Operation & maintenance: 229
thousand USD/year
HUAPAMALA 5,2 MW
Location:
Saraguro Canton – province of Loja
Main data:
• 30 thousand habitants (13,36%
urban, 86,64% rural);
• 70% of economically active
population;
• 9449 houses in the canton have
electrical service.
Characteristics of the project:
River:
Average height:
Huapamala
2600 masl
Type of Hydro Plant:
Pass-throu
Design water flow:
Gross head:
Turbine type:
Installed power:
Annual average energy:
Factor of plant:
1,24 m³/s
514 m
Pelton of horizontal shaft
5,2 MW
31,76 GWh
0,70
Interconnection point:
S/E Saraguro at 69 kV of 30 km
and Manú Feeder at 13,8 kV of
2 km
Costs:
Investment: 10,04 MMUSD
Operation & maintenance: 192
thousand USD/year
CHINAMBÍ 9,95 MW
Location:
Mira canton – province of Carchi
Characteristics of the project:
River:
Average height:
Type of Hydro Plant:
Design water flow:
Net head:
Turbine type:
Installed power:
Annual average energy:
Factor of plant:
Main data:
• 12 thousand habitants (33%
urban, 66% rural);
• 77% of economically active
population;
• 4126 houses in the canton have
electrical service.
Interconnection:
Chinambí
772 masl
Pass-throu
4,8 m³/s
244,04 m
Two Pelton turbines of
vertical shaft
9,95 MW
45,24 GWh
0,51
S/E La Carolina at 69kV
of 9,1 km
Costs:
Investment: 29,76 MMUSD
Operation & maintenance: 165
thousand USD/year
SARDINAS 6,54 MW
Location:
El Chaco canton – province of Napo
Main data:
• 8 thousand habitant (50% urban,
50% rural);
• 44% of economically active
population;
• 1513 houses of the canton have
electrical service.
Characteristics of the project:
River:
Average height:
Type of Hydro Plant:
Design water flow:
Gross head:
Sardinas Grande
1600 masl
Pass-throu
8 m³/s
99,41 m
Turbine type:
Francis of horizontal shaft
Installed power:
Annual average energy:
Factor of plant:
6,54 MW
42 GWh
0,69
Interconnection:
Distribution line El Chaco
at 22,8 kV of 1 km
Costs:
Investment: 18,2 MMUSD
Operation & maintenance: 170
thousand USD/year
CALUMA PASAGUA 4,03 MW
Location:
Caluma canton - province of Bolívar
Main data:
• 13 thousand habitants (48%
urban, 52% rural);
• 43% of economically active
population;
• 5139 houses in the canton have
electrical service.
Characteristics of the project:
River:
Average height:
Type of Hydro Plant:
Area of Contributor Basin:
Design water flow:
Net head:
Turbine type:
Installed power:
Annual average energy:
Factor of plant:
Interconnection point
Escaleras
775 masl
Pass-throu
117 km²
3,6 m³/s
130 m
Pelton of horizontal shaft
4,03 MW
27 GWh
0,77
S/E Caluma 69 kV of 13
km
Costs:
Investment: 12,23 MMUSD
Operation & maintenance: 232
thousand USD/year
TRIGEURCO 3,44 MW
Location:
Guaranda canton – province of Bolívar
Main data:
• 91 thousand habitants (26%
urban, 73% rural);
• 80% of the economically active
population;
• 27138 houses in the canton have
electrical service.
Characteristics of the project:
River:
Average height:
Payagua
1200 masl
Type of Hydro Plant:
Pass-throu
Area of Contributor Basin:
Design water flow:
Net head:
Turbine type:
Installed power:
Annual average energy:
Factor of plant:
50,7 km²
2,4 m³/s
180 m
Pelton of horizontal shaft
4,03 MW
22,4 GWh
0,74
Interconnection point:
S/E Guanujo at 69 KV of 14 km
Costs:
Investment: 13,47 MMUSD
Operation & maintenance: 219
thousand USD/year
Wind Projects
GARCÍA MORENO 22 MW - 33 MW
Location:
Bolívar canton – province of Carchi
3000 masl
Pre-feasibility & feasibility:
• 7 m/s of average speed (approx. 80
m of height – metering during 1
year);
• 0,872 kg/m3 of air density;
• 31,16% - 28,82% of factor of
plant.
Characteristics of the project:
Number of wind generators:
11
Unitary nominal power (kW):
2.000 - 3.000
Total installed power (MW):
22 - 33
Height of shaft (m):
75 - 85
Diameter of rotor (m):
90 - 125
Gross average production (MWh/year):
68.466 - 94.975
Net average production (MWh/year):
60.104 - 83.375
Eq. hours at nominal power:
2.732 - 2.527
Costs:
Investment: 48,87 MMUSD –
61,52 MMUSD
SALINAS, MEMBRILLO & CHINCHAS
Location:
Salinas – province of Imbabura
Chinchas & Membrillo – province of Loja
Results:
Proyecto
Salinas
Wind metering campaigns:
10 metering towers were used according
international Standards: IEC, AIE,
Measnet:
• 3 in Salinas (60 meters)
• 3 in Membrillo (80 meters)
• 4 in Chinchas (80 meters)
Observación
Salinas
Salinas fase 1
Chinchas
Membrillo
Velicidad Densidad
superior 63 m- del aire
(m/s)
(kg/m3)
6,64
0,982
Potencial
insuficiente, fp <
20%
Salinas 1 fase 2 6,06
0,997
Salinas 2 fase 2
Membrillo
Ducal
Capilla 1
Capilla 2
Chinchas
Huacacocha 1
Huacacocha 2
Huacacocha 3
Las Chinchas 1
4,29
0,982
9,85
8,30
7,65
0,889
0,886
0,891
Alto potencial,
34 MW - 48 MW,
fp 37% - 45%
8,19
7,91
6,59
9,15
0,915
0,944
0,972
0,927
Alto potencial,
33 MW - 53 MW,
fp 28% - 36%
EL ARENAL
Location:
Province of Bolívar
4.321 masl
Metering campaigns:
• 10,5 m/s of average speed (approx.
80 m of height);
• 0,772 kg/m3 of air density;
• 611 mbar of atmospheric pressure;
• 2,67 °C of average temperature;
Wind metering campaigns:
Investment projects in
Galapagos Islands
UPDATE IN 4,75 MW OF BALTRA WIND FARM
Location:
Object:
Increase in 4,75 MW additional to the current
installed power. Expected total power of 7 MW.
I. Baltra
I. Santa Cruz
Main components:
• Feasibility study and environmental licenses.
• Installation of wind generators.
• Integration to the existent wind farm.
Expected benefits:
• Energy contribution: estimated average energy of
12,00 GWh/year.
• Diesel reduction: approx. 1 MM gallon/year.
• CO2 reduction: approx. 7200 ton/year.
Estimated time:
• 2 years
Available information:
• Data of the wind resource of the current installed
wind farm.
Investment: 20 MMUSD
UPDATE FROM 65 kWp TO 200 kWp OF BALTRA PV PLANT
Location:
Object:
Increase 135 kWP additional to the current power.
Total expected power of 200 kWP.
I. Baltra
I. Santa Cruz
Main components:
• Environmental licenses
• Construction, installation.
• Integration to the current system.
Expected benefits:
• Estimated average energy of 140 MWh/year.
• Diesel reduction:
approx. 12 thousand
gallon/year.
• CO2 reduction: approx. 84 ton/year.
Estimated time:
• 1 year.
Investment: 1,6 MMUSD
500 kWp PV PROJECT IN SAN CRISTÓBAL
WITH BATTERY STORAGE SUPPORT
Object:
Installation of the new PV power plant of 500
KWp with 1 MW of battery storage.
Location:
I. San Cristóbal
Main components:
• Feasibility study, design, environmental
licenses.
• Construction and implementation.
• Integration to the system and automated
control.
Expected benefits:
• Estimated average energy of 530 MWh/year.
• Diesel reduction: approx. 44 thousand
gallon/year.
• CO2 reduction: approx. 300 ton/year.
• Displacement of thermal generation in peak
hours.
Estimated time:
• 1 year.
Investment: 10 MMUSD
VII Seminario Latinoamericano y del Caribe de Eficiencia Energética
Strategic projects
Thanks to the implementation of our generating
and transmission emblematic projects, as well as,
of small scale projects using non conventional
renewable resources, Ecuador is an inclusive
country and is projected as a regional leader in
energy sustainability.
Thanks for your
attention