Cumbre de Inversiones Ecuador 2016 Investment Summit Ministerio de Comercio Exterior - PROECUADOR Strategic Investment in energy projects Adrián Moreno Díaz Undersecretary of Renewable Energy and Energy Efficiency Octubre 2016 VII Seminario Latinoamericano y del Caribe de Eficiencia Energética Importance of the direct foreign investment “…in the productive matrix is set the essence of the economical and social reality of the countries. For Ecuador, its transformation becomes the main action in order to solve the unemployment, poverty and inequity, ….where the direct foreign investment as complement to the national investment, complies a main role in the national economical development, and respect the responsibility of the employees, the society, and the environment…” National Plan of Good Living Investment projects in non conventional renewable energy (NCRE) Small Hydro Power Plants INFIERNILLOS 19,64 MW Location: Saraguro Canton – province of Loja Characteristics of the project: River: Average height: Type of hydro plant: Design water flow: Net head: Turbine type: Installed power: Annual average energy: Factor of plant: Interconnection: Main data: • 30 thousand habitants (13,36% urban, 86,64% rural); • 70% of economically active population; • 9449 houses in the canton have electrical service. Paquishapa 1500 masl Pass-throu 7,2 m³/s 312 m Pelton of horizontal shaft 19,64 MW 120 GWh 0,70 S/E Saraguro at 69 kV of 16,8 km Costs: Investment: 39,7 MMUSD Operation & maintenance: 229 thousand USD/year HUAPAMALA 5,2 MW Location: Saraguro Canton – province of Loja Main data: • 30 thousand habitants (13,36% urban, 86,64% rural); • 70% of economically active population; • 9449 houses in the canton have electrical service. Characteristics of the project: River: Average height: Huapamala 2600 masl Type of Hydro Plant: Pass-throu Design water flow: Gross head: Turbine type: Installed power: Annual average energy: Factor of plant: 1,24 m³/s 514 m Pelton of horizontal shaft 5,2 MW 31,76 GWh 0,70 Interconnection point: S/E Saraguro at 69 kV of 30 km and Manú Feeder at 13,8 kV of 2 km Costs: Investment: 10,04 MMUSD Operation & maintenance: 192 thousand USD/year CHINAMBÍ 9,95 MW Location: Mira canton – province of Carchi Characteristics of the project: River: Average height: Type of Hydro Plant: Design water flow: Net head: Turbine type: Installed power: Annual average energy: Factor of plant: Main data: • 12 thousand habitants (33% urban, 66% rural); • 77% of economically active population; • 4126 houses in the canton have electrical service. Interconnection: Chinambí 772 masl Pass-throu 4,8 m³/s 244,04 m Two Pelton turbines of vertical shaft 9,95 MW 45,24 GWh 0,51 S/E La Carolina at 69kV of 9,1 km Costs: Investment: 29,76 MMUSD Operation & maintenance: 165 thousand USD/year SARDINAS 6,54 MW Location: El Chaco canton – province of Napo Main data: • 8 thousand habitant (50% urban, 50% rural); • 44% of economically active population; • 1513 houses of the canton have electrical service. Characteristics of the project: River: Average height: Type of Hydro Plant: Design water flow: Gross head: Sardinas Grande 1600 masl Pass-throu 8 m³/s 99,41 m Turbine type: Francis of horizontal shaft Installed power: Annual average energy: Factor of plant: 6,54 MW 42 GWh 0,69 Interconnection: Distribution line El Chaco at 22,8 kV of 1 km Costs: Investment: 18,2 MMUSD Operation & maintenance: 170 thousand USD/year CALUMA PASAGUA 4,03 MW Location: Caluma canton - province of Bolívar Main data: • 13 thousand habitants (48% urban, 52% rural); • 43% of economically active population; • 5139 houses in the canton have electrical service. Characteristics of the project: River: Average height: Type of Hydro Plant: Area of Contributor Basin: Design water flow: Net head: Turbine type: Installed power: Annual average energy: Factor of plant: Interconnection point Escaleras 775 masl Pass-throu 117 km² 3,6 m³/s 130 m Pelton of horizontal shaft 4,03 MW 27 GWh 0,77 S/E Caluma 69 kV of 13 km Costs: Investment: 12,23 MMUSD Operation & maintenance: 232 thousand USD/year TRIGEURCO 3,44 MW Location: Guaranda canton – province of Bolívar Main data: • 91 thousand habitants (26% urban, 73% rural); • 80% of the economically active population; • 27138 houses in the canton have electrical service. Characteristics of the project: River: Average height: Payagua 1200 masl Type of Hydro Plant: Pass-throu Area of Contributor Basin: Design water flow: Net head: Turbine type: Installed power: Annual average energy: Factor of plant: 50,7 km² 2,4 m³/s 180 m Pelton of horizontal shaft 4,03 MW 22,4 GWh 0,74 Interconnection point: S/E Guanujo at 69 KV of 14 km Costs: Investment: 13,47 MMUSD Operation & maintenance: 219 thousand USD/year Wind Projects GARCÍA MORENO 22 MW - 33 MW Location: Bolívar canton – province of Carchi 3000 masl Pre-feasibility & feasibility: • 7 m/s of average speed (approx. 80 m of height – metering during 1 year); • 0,872 kg/m3 of air density; • 31,16% - 28,82% of factor of plant. Characteristics of the project: Number of wind generators: 11 Unitary nominal power (kW): 2.000 - 3.000 Total installed power (MW): 22 - 33 Height of shaft (m): 75 - 85 Diameter of rotor (m): 90 - 125 Gross average production (MWh/year): 68.466 - 94.975 Net average production (MWh/year): 60.104 - 83.375 Eq. hours at nominal power: 2.732 - 2.527 Costs: Investment: 48,87 MMUSD – 61,52 MMUSD SALINAS, MEMBRILLO & CHINCHAS Location: Salinas – province of Imbabura Chinchas & Membrillo – province of Loja Results: Proyecto Salinas Wind metering campaigns: 10 metering towers were used according international Standards: IEC, AIE, Measnet: • 3 in Salinas (60 meters) • 3 in Membrillo (80 meters) • 4 in Chinchas (80 meters) Observación Salinas Salinas fase 1 Chinchas Membrillo Velicidad Densidad superior 63 m- del aire (m/s) (kg/m3) 6,64 0,982 Potencial insuficiente, fp < 20% Salinas 1 fase 2 6,06 0,997 Salinas 2 fase 2 Membrillo Ducal Capilla 1 Capilla 2 Chinchas Huacacocha 1 Huacacocha 2 Huacacocha 3 Las Chinchas 1 4,29 0,982 9,85 8,30 7,65 0,889 0,886 0,891 Alto potencial, 34 MW - 48 MW, fp 37% - 45% 8,19 7,91 6,59 9,15 0,915 0,944 0,972 0,927 Alto potencial, 33 MW - 53 MW, fp 28% - 36% EL ARENAL Location: Province of Bolívar 4.321 masl Metering campaigns: • 10,5 m/s of average speed (approx. 80 m of height); • 0,772 kg/m3 of air density; • 611 mbar of atmospheric pressure; • 2,67 °C of average temperature; Wind metering campaigns: Investment projects in Galapagos Islands UPDATE IN 4,75 MW OF BALTRA WIND FARM Location: Object: Increase in 4,75 MW additional to the current installed power. Expected total power of 7 MW. I. Baltra I. Santa Cruz Main components: • Feasibility study and environmental licenses. • Installation of wind generators. • Integration to the existent wind farm. Expected benefits: • Energy contribution: estimated average energy of 12,00 GWh/year. • Diesel reduction: approx. 1 MM gallon/year. • CO2 reduction: approx. 7200 ton/year. Estimated time: • 2 years Available information: • Data of the wind resource of the current installed wind farm. Investment: 20 MMUSD UPDATE FROM 65 kWp TO 200 kWp OF BALTRA PV PLANT Location: Object: Increase 135 kWP additional to the current power. Total expected power of 200 kWP. I. Baltra I. Santa Cruz Main components: • Environmental licenses • Construction, installation. • Integration to the current system. Expected benefits: • Estimated average energy of 140 MWh/year. • Diesel reduction: approx. 12 thousand gallon/year. • CO2 reduction: approx. 84 ton/year. Estimated time: • 1 year. Investment: 1,6 MMUSD 500 kWp PV PROJECT IN SAN CRISTÓBAL WITH BATTERY STORAGE SUPPORT Object: Installation of the new PV power plant of 500 KWp with 1 MW of battery storage. Location: I. San Cristóbal Main components: • Feasibility study, design, environmental licenses. • Construction and implementation. • Integration to the system and automated control. Expected benefits: • Estimated average energy of 530 MWh/year. • Diesel reduction: approx. 44 thousand gallon/year. • CO2 reduction: approx. 300 ton/year. • Displacement of thermal generation in peak hours. Estimated time: • 1 year. Investment: 10 MMUSD VII Seminario Latinoamericano y del Caribe de Eficiencia Energética Strategic projects Thanks to the implementation of our generating and transmission emblematic projects, as well as, of small scale projects using non conventional renewable resources, Ecuador is an inclusive country and is projected as a regional leader in energy sustainability. Thanks for your attention
© Copyright 2024