Call Records for the last Seven Days Report Date Call Number Complaint Name Time 02/06/2015 15-02083 STRIKER,ART 5:39:03 am Badge No: 7923 Location Address 3653 CLUB LN SE GOSHEN TWP Narrative NARCOTICS Received a call from an subject advising that Eric Kramer was currently at his father's residence on Club Lane. Eric has outstanding warrants. The caller refuse to give their name. Deputies responded to the residence and attempted to make contact. Deputies were unable to make contact at the residence. Deputies could not get any subjects to answer the door. Report Date Call Number Complaint Name 02/05/2015 15-02082 PETERS, TANNER Badge No: R-35 Location Address 8022 NEWPORT RD SE Narrative SUSP PERSON Caller advised a male subject walking in the middle of Newport Rd. Time 9:57:04 pm MILL TWP I Deputy Stokey located Timothy McCamant and he advised that he had a verbal argument with his girlfriend in Uhrichsville and he was walking to his Grandmother's residence. Had Uhrichsville PD check on the female half. They advised that no assaults took place. Mr. McCamant was dropped off at his Grandmother's. Report Date Call Number Complaint Name Time 02/05/2015 15-02081 AMER PROTECT/214 9:31:51 pm Badge No: 7927 Location Address 5018 STATE ROUTE 183 NE SANDY TWP Narrative POLICE ALARM Central Dispatch advising of a police alarm at the Sandy Valley Elementary School showing interior and perimeter motion. Dispo: Cancelled while en route. Key holder Doug Needing stating that the alarm had been tripped accidentally. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/05/2015 15-02080 MURPHY, WILLIAM 9:14:15 pm Badge No: 7945 Location Address 208 S ST CLAIRSVILLE ST PT WSHNGTN VL Narrative RECK OPER Central Dispatch advised that they received a call from William Murphy of 107 Luther Dr. Port Washington. William advised that Preston Stocker is driving around the neighborhood in a Jeep Cherokee and he is operating in a reckless manor. Dispo: I responded to the area and located Preston Stocker (OLN TS167619) he was not operating the Jeep upon my arrival, however I did make him aware of the complaint and that his current drivers license status does not permit him to be driving. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name 02/05/2015 15-02079 MALE CALLER Badge No: 7933 Location Address 3653 CLUB LN SE Narrative WARRANTS Unknown caller advised Eric Kramer was at his fathers residence. Eric has a warrant. Time 7:55:46 pm GOSHEN TWP Units checked the residence no one would answer the door. N/R Friday, February 6, 2015 Page 1 of 23 Report Date Call Number Complaint Name 02/05/2015 15-02078 RENNICKER-SENSEL, CAROLYN Badge No: 7933 Location Address 2772 ELK DR SE Narrative SOLICITATION Complainant called about someone soliciting for utility company. Time 6:48:48 pm GOSHEN TWP I spoke with the complainant, she did not open the door. The company left information on the porch. The complainant was advised she was outside the village limits and there is no permit needed for solicitation. The complainant was advised to have her son that takes care of her bills look at the information and handle same. N/R Report Date Call Number Complaint Name 02/05/2015 15-02077 USA CENTRAL STATION/716 Badge No: 7927 Location Address 5934 OLD ROUTE 39 NW Narrative POLICE ALARM Central Dispatch advising of a police alarm at Breitenbach Winery. Time 6:55:03 pm SUGAR CRK TWP Dispo: Cancelled while en route. Individual on scene was able to provide the proper passcode. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name 02/05/2015 15-02076 PARKINSON, STEPHANIE Badge No: SO79 Location Address 3075 STATE ROUTE 39 NE Narrative VANDALISM Complainant called and advised her mail box was damaged. Time 6:09:36 pm GOSHEN TWP I spoke with the complainant. The mail box was struck by a plow truck. N/R Report Date Call Number Complaint Name 02/05/2015 15-02075 GRITZAN,TROY Badge No: SO79 Location Address 1086 HAUETER SQ NE Narrative SUSP VEHICLE Suspicious Vehicle Time 5:30:36 pm LAWRENCE TWP The caller, Mr. Troy Gritzan reports that an unknown vehicle has pulled into his driveway for the past two (2) days (tracks in the snow) while his has not been home. Mr. Gritzan has not seen this vehicle in his driveway however he is concerned as no one should have been at his house while he is not there. Mr. Gritzan wants this for record only. No signs of anyone being around his home or even getting out of the car while it was in Mr. Gritzan's driveway. N/R Deputy B. R. Watson -7925 Report Date Call Number Complaint Name 02/05/2015 15-02074 BOYD, KEVIN Badge No: SO79 Location Address 5321 SATTLER BOTTOM RD NE Narrative ID THEFT Resident advised someone was trying to file an income under his name. Time 4:55:42 pm SANDY TWP Kevin Boyd provided I/O with a letter he had received from the IRS regarding his return. His information was correct but the letter had a female listed that is not his wife. I/O provided identity theft packet to Mr. Boyd and they were in the process of contacting the IRS and other parties. Friday, February 6, 2015 Page 2 of 23 Report Date Call Number Complaint Name 02/05/2015 15-02073 CHADWICK,JOHN Badge No: 794 Location Address 563 SCHOOL ST Narrative THREATS John Chadwick reporting issues with his live in girlfriend, Regina Bollerud. Time 2:03:44 pm TUSCARAWAS VLG I spoke with John who stated he wanted to obtain a civil protection order against his live in girlfriend, Regina Bollerud. John went on to say that he permitted her to move back in this past Saturday and during the early morning hrs. of Tuesday 2/3/15. He woke up to her reportedly standing over him holding a machete. John said that there were not threats or attempts to use it, only that Regina saying that he could be killed at anytime. This incident was not reported and John did not wish to at this time. John also said that since this time, he has overheard conversations Regina has had on the phone with unknown subjects where she has requested they bring a U-Haul down on Monday after he goes to work. John was told that this agency does not issues protection orders and directed him to contact the county prosecutors office for further assistance. He was further told that if any future issues arise, contact this office immediately Report Date Call Number Complaint Name Time 02/05/2015 15-02072 CARTER, MARISSA 1:55:46 pm Location Address Badge No: R-3 822 SHARON VALLEY RD SW CLAY TWP Narrative SUSP VEHICLE Central Dispatch received a call from a juvenile at 822 Sharon Valley Rd. that there were 2 male subjects at his residence knocking on the door and he did not know who they were. Units responded and met with the juvenile. The juvenile advised that there were 2 male subjects at his residence and had been knocking on the door. The juvenile advised that he did not know the subjects and they had left the residence. The juvenile advised that he had called his father Chris Enos, who arrived before units cleared the residence. Chris stated that he had located the subjects a few houses down and he had spoke to them. Chris stated that he had been told by the subjects that they were going around and inquiring about purchasing standing timber. Units located the subjects who were identified as being Kim Marker and Matt Miller. Matt reportedly owns a Lumber company and he was going to residents property in the area to inquire about purchasing timber. The subjects were advised of the complaint and they stated that they are finished for the day. N/R Anderson/796 Report Date Call Number Complaint Name Time 02/05/2015 15-02071 MARCINCAVAGE,STEVEN 11:41:20 am Badge No: 794 Location Address 6806 BUEHLER HILL RD SW JEFFERSON TWP Narrative WELFARE CHEC Steven Marcincavage request units check the welfare of his brother George at this location, ref. he had not had any contact with him in the past two weeks. This is out of the norm for his brother who has health issues. s upon reaching the home which had to be accessed with a 4 wheel drive truck we found George fine. George reported that his phone was not working at this time and due to the weather, he had not been out. I used my cell phone to contact the caller from the location and George did speak with his brother. All ok. Report Date Call Number Complaint Name 02/05/2015 15-02070 VERIZON WIRELESS Badge No: 796 Location Address 2262 FRYS VALLEY RD SW Narrative Friday, February 6, 2015 Time 11:19:14 am CLAY TWP Page 3 of 23 CIVIL Central Dispatch received a phone call from a male subject requesting a deputy at 2262 Fry's Valley Rd and then hung up. Writer responded and met with Eric Morris who was on scene. Eric advised that his aunt Vicki Morris and her husband Eric own the property at 2262 Fry's Valley Rd. Eric advised that there area 2 apartments at the location and one of them is occupied by Daryl Martini and the other is occupied by a Maggie Addy. Eric stated that there had been an old dryer in the garage area at the 2 apartments that belongs to his aunt Vicki. Eric claimed that he was told by Vicki that he could obtain the non-working dryer and try to repair same. Eric claimed that he had arrived at the residence on todays date to try and obtain the dryer. Eric stated that Daryl had came out of his apartment and confronted him with a baseball bat and told him that he was not taking the dryer. Eric stated that he had contacted law enforcement and after doing same Daryl had left the area. Writer spoke to Vicki and confirmed that she owned the dryer and that Eric could have possession of same. Eric refused to cooperate and file a written statement on the matter and advised that nothing further was needed. N/R Anderson/796 Report Date Call Number Complaint Name Time 02/05/2015 15-02069 BOLON, MICHAEL 3:30:23 am Badge No: 7945 Location Address 9419 CRUM RD NE WARREN TWP Narrative SUSP VEHICLE Central Dispatch received a call advising of a vehicle with someone in it sitting along the roadway on Crum Rd. near 9419 Crum Rd. N.E. Warren Twp. Dispo: I responded to the above location and located Gary Crites (OLN RP110709) and the vehicle he was driving a Kia SUV (reg. FSD-4026) stuck in the snow. The vehicle was off the roadway out of the lane of travel. Gary was given a ride home by a friend and will retrieve the vehicle at a later time. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name Time 02/04/2015 15-02068 BRENNAMEN, DENNIS 11:15:22 pm Badge No: 7945 Location Address 8712 CANAL RD NE LAWRENCE TWP Narrative MDP Central Dispatch received a call from Dennis Brenneman advising his wife is having some mental health difficulties and is currently acting out. Dennis is requesting a Deputy and EMS for assistance. Dispo: I responded to the above location and spoke with Dennis, and his wife Patricia Brenneman (OLN. RG070292) and Patricia was calm at this point and was refusing assistance from the EMS staff of Bolivar Fire Department. After speaking with Patricia it was her request to leave the residence for the evening and go to a friends house. Patricia was invited to go to her friend Melody Niblick's (OLN. RN042513) residence at 9743 Bimeler St. N.E. and spend the evening there so there would not be any further problems between her and her husband. I transported Patricia to the Niblick residence and she advised she would stay there for the evening and did not need any further assistance. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name Time 02/04/2015 15-02067 SHEPARD,BEN 10:56:44 pm Badge No: 7927 Location Address 11067 STRASBURG BOLIVAR RD NW FRANKLIN TWP Narrative OVERDOSE Benjamin Shephard reporting that his live-in girlfriend, Amber Larson, has struck him several times and is now threatening to cut herself. Amber is also reported to have taken an unknown amount of pills. Dispo: Units arrived on scene and made contact with Benjamin Shephard (OLN RD322273) and Amber Larson (OLN UJ439658). After speaking with both parties, Amber was ultimately transported to Affinity Hospital in Massillon for treatment and a report will be sent to the prosecutor requesting a warrant for Amber's arrest following her discharge from the hospital. Report to follow. Deputy A. Fisher 7927 Report Date Call Number Complaint Name 02/04/2015 15-02066 LUNA, MARTHA Badge No: 7927 Location Address 8750 E 1ST ST Narrative Friday, February 6, 2015 Time 10:36:27 pm MNERL CTY VLG Page 4 of 23 UNK TYPE COM Martha Luna reporting that an unknown individual is shining a bright light into a window on the rear of the house. Dispo: I responded to the scene and after speaking to Ms. Luna determined that the light was some sort of spot light which was coming from the alley behind her property. Ms. Luna states the light was shown into the window a few times, but does not know if anyone would be doing this on purpose. I was ultimately unable to locate any persons shining or using spot lights in the area. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/04/2015 15-02065 MAGNOLIA POLICE 9:59:53 pm Badge No: 7927 Location Address 5130 STATE ROUTE 183 NE SANDY TWP Narrative AUTO ACCIDEN Magnolia Police Department advising of a private property crash involving a school bus at the Sandy Valley High School. Dispo: Arrived on scene at the bus garage after not observed a bus anywhere on the school property. At the bus garage, I made contact with Thomas Shipman (OLN RQ341777), who was attempting to leave the building as I arrived. Upon speaking with Mr. Shipman, he advised that he was operating a school bus and backed into another vehicle on school property. After calling law enforcement, Mr. Shipman contacted his supervisor, Doug Needing. Mr. Needing advised Mr. Shipman that he would take care of the crash in the morning. He also told Mr. Shipman that law enforcement would not come on private property to handle the crash. Mr. Shipman was informed that law enforcement would indeed respond to private property crashes and since the crash involved a school bus a report should be made; however, that would be up to Mr. Needing at this point. NOTE: There were children on the school bus at the time of the crash and there was damage to the other vehicle. The school bus was moved from its original location, all the children and other witnesses had left the scene and the vehicle which was struck was no longer present. N/R at this time. Deputy A. Fisher 7927 Report Date Call Number Complaint Name 02/04/2015 15-02064 SMITH,BRANDI Badge No: 799 Location Address 2123 EAST HIGH AV Narrative THEFT Caller reporting a theft of items. Time 8:18:08 pm GOSHEN TWP Disposition: Brandi Smith reporting a theft of a makeup brush and a dress while staying at Harbor House. I spoke with Brandi who stated while she was away Tuesday that someone took her MAC makeup brush and a black jersey dress. Under investigation. 799 Report Date Call Number Complaint Name 02/04/2015 15-02063 COOL,PATSY Badge No: 799 Location Address 4372 WHITE BRIDGE RD NE Narrative BURGLARY Patsy Cool calling requesting a deputy check her residence. Time 5:57:39 pm GOSHEN TWP Disposition: Units checked the residence and found the wind had blown a window on the porch down and it broke on the floor. No break in. 799 Report Date Call Number Complaint Name 02/04/2015 15-02062 RIDDLE,AUSTIN Badge No: 794 Location Address 3655 CLUB LN SE Narrative Friday, February 6, 2015 Time 5:08:54 pm GOSHEN TWP Page 5 of 23 WARRANTS Caller reporting Eric Kramer at the above address who has a felony warrant. Units went to the above address and got no answer at the door. We did speak to a neighbor who stated that Eric had left about 5 minutes prior to units arrival with a male by the name of Kirk Hostettler in a vehicle. Report Date Call Number Complaint Name 02/04/2015 15-02061 ALLEY,MARJORIE Badge No: 794 Location Address 213 SCHOOL ST Narrative WELFARE CHEC Caller was requesting a welfare check on her 90 yr. old mother at the above address. Time 4:40:24 pm TUSCARAWAS VLG I spoke with the female who when asked stated she was the female, but when asked said she had no family members in the state of florida. The female I spoke with was aware of her surroundings and lucid when speaking with. The original caller was made aware of findings. Report Date Call Number Complaint Name 02/04/2015 15-02060 PD31-WOODBY Location Address Badge No: 796 5367 E STATE RD SW Narrative SUSP VEHICLE Central Dispatch received a complaint of a subject in a vehicle sleeping at the car wash on East State Rd. Time 2:45:47 pm OXFORD TWP Writer responded and checked the area. The subject appeared to have left the area prior to units arrival on scene. N/R Anderson/796 Report Date Call Number Complaint Name 02/04/2015 15-02059 796 Badge No: 796 Location Address 4649 RUSH CHURCH RD SE Narrative FOUND ITEM Deputy Anderson was stopped by a subject who had given him a license plate that he had located. Time 1:58:02 pm RUSH TWP Writer had been stopped by Scott Sanders, who resides on Rush Church Rd. Scott stated that there had been an automobile accident near his residence the night prior, which he did not notice until todays date. Scott stated that he had located a license plate near the accident scene and turned same over to writer. Writer will take the plate and return same to the owner Billy Meyer. N/R Anderson/796 Report Date Call Number Complaint Name 02/04/2015 15-02058 GUARDIAN-STACY Badge No: SO79 Location Address 7950 KENDLE RD NW Narrative POLICE ALARM Alarm Activation Time 11:12:56 am LAWRENCE TWP Dispo: Writer arrived and checked the residence with the home owner finding everything ok. Report Date Call Number Complaint Name 02/04/2015 15-02057 FRANTZ, CHAD Badge No: 7916 Location Address 7424 PENN RD SE Narrative Friday, February 6, 2015 Time 10:17:55 am UNION TWP Page 6 of 23 UNAUTH USE Chad Frantz called to report his truck stolen last night by his girl-friend (Meleah McAtee). Chad advised that he was out with his buddies all night drinking and when he came home he went to drive his companies (Advanced Oilfield) truck he noticed that the seat was up close to the steering wheel. Chad then drove the truck and noticed that there was a very bad vibration in the front of the truck. Chad told R/O that he received a text message from Meleah stating that she was glad that his truck was not stuck anymore. R/O noticed that the drivers side rims were full of mud and there was a little small dent on the front bumper. Chad advised that he was going to take the truck to the shop to see what the problem was. R/O spoke with the business owner (Todd Riordan) who advised that he did not want to pursue the matter that he would take care of the issue with Chad and that he was not going to spend a lot of money in court for a bumper that may only cost $200.00. R/O did speak with Meleah who advised that Chad has let her drive his trucks before and that she has lived with him since he bought this residence a year ago. Meleah advised that she did drive the company truck this morning to a location on SR 800 and was only gone for 10 minutes and she did not get the truck stuck. Meleah told me that she did send that text message to Chad because his personal truck had been stuck the other day and Chad had been out all night drinking with his oil well buddies. Todd advised that he wanted this on file with our office. Report Date Call Number Complaint Name 02/04/2015 15-02056 FEMALE REFUSED Badge No: 796 Location Address BALTZLEY AV SE Narrative ANIMAL COMP Central Dispatch received a call of a cow in the roadway. Time 9:51:49 am GOSHEN TWP Writer checked the area and was unable to locate any cattle in the roadway. N/R Anderson/796 Report Date Call Number Complaint Name 02/04/2015 15-02055 GROSS, ROBERT Badge No: 794 Location Address 6589 ROCKY RIDGE RD SW Narrative HARASSMENT Robert Gross reporting a pattern of harassment since 2000. Time 9:14:59 am AUBURN TWP I spoke with Robert who turned in several hand written statements documenting the pattern of harassment which he alleges that Michael Furiato has done against him. After reading the several pages, it appears that this matter would be handled more through the civil courts rather than criminal. I will contact Robert and advise him of same. Report Date Call Number Complaint Name 02/04/2015 15-02054 PERSHING,KARINA Badge No: 794 Location Address 2082 MAIN ST Narrative DISTURBANCE Caller reporting issues with her next door neighbor. Time 8:58:40 am MIDVALE VLG I spoke with the caller who indicated issues with her neighbors driving onto her yard and yard items have been damaged. It was requested that complaint be forwarded to Midvale PD to contact the caller by phone to speak with her about this ongoing matter. She was also told if incidents occur during the night hrs. contact this office. Report Date Call Number Complaint Name 02/04/2015 15-02053 ANONYMOUS Badge No: 7916 Location Address CLUB LN SE Narrative WARRANTS PENDING Time 5:39:02 am GOSHEN TWP Report Date Call Number Complaint Name 02/03/2015 15-02052 FEMALE CALLER Badge No: 7911 Location Address 735 N WATER ST Narrative Time 7:48:18 pm UHRICHSVILLE Friday, February 6, 2015 Page 7 of 23 WARRANTS 15-02052 Uhrichsville PD requested a relay as they had arrested Shanna M, Smith on two open warrants. One of the Warrants CBR 1200296 was out of Tuscarawas County Court on a failure to appear for a domestic violence case and the other was out of New Philadelphia Municipal Court CBR 1200427 for a failure to appear for a speed violation. Deputy Stocker responded to Ember Care Center on N. Water St ext and transported Ms. Smith to the Tuscarawas County Jail. Report Date Call Number Complaint Name 02/04/2015 15-02051 DIEBOLD//195 Badge No: 7964 Location Address 10896 INDUSTRIAL PKWY NW Narrative POLICE ALARM PENDING Time 4:54:51 am LAWRENCE TWP Report Date Call Number Complaint Name 02/04/2015 15-02050 KELLEY, PAUL Badge No: 7937 Location Address 6088 STATE ROUTE 212 NE Narrative DOMESTIC DIS 15-02050 Time 12:41:31 am FAIRFIELD TWP Report Date Call Number Complaint Name 02/03/2015 15-02049 LYONS, BILL Badge No: 7964 Location Address 5225 N WOOSTER AV EXT NW Narrative SHOOTING On this date central dispatch advised of a shooting that had occurred at the incident location. 15-02049 Time 11:08:17 pm PARRAL VLG Dispo: Prior to units arrival Mr. William Lyons advised dispatch that he had shot a friend of his in self defense. Upon arrival units were met by the caller Mr. William Lyons at the doorway to his residence. Mr. Lyons was ordered to turn away from units and place his hands on the wall of his residence. He complied and was patted down for weapons. The victim was located inside the residence and had indeed suffered an apparent gun shot wound. The victim was transported by ambulance and life flighted to Aultman Hospital for treatment. The victim was later pronounced dead due to the injuries sustained during this incident. Mr. Lyons was taken into custody and booked into the Tuscarawas County Justice Center pending formal felony charges. Further investigation and report to follow. Report Date Call Number Complaint Name Time 02/03/2015 15-02048 ESLIN, NATHANIEL 10:46:29 pm Location Address Badge No: 7911 3641 CLUB LN SE GOSHEN TWP Narrative OPEN DOOR Tuscarawas County Central Dispatch received a call from an anonymous person called to report that an individual was inside an abandon residence on Club Ln. Dispo: Deputy Stocker responded to the residence and found an open door, however; and searching the residence found no one was inside. The door to the abandon residence was re-secured. Report Date Call Number Complaint Name Time 02/03/2015 15-02047 LOAR, ALYCIA 9:24:49 pm Badge No: 7911 Location Address 7098 FUHR DR SE UNION TWP Narrative UNWANTED PER Tuscarawas County Central Dispatch received a call from a Rachelle Loar who reported that a Paul Snodgrass was at her residence and she did not wish for him to be there. Dispo: Deputy Stocker and Shott responded to the scene and found that Mr. Snodgrass was invited to the home by her live-in boyfriend Everette Cochran. It was explained to Ms. Loar that her boyfriend does have the right to invite whoever he wanted. No criminal had occurred at the residence. Friday, February 6, 2015 Page 8 of 23 Report Date Call Number Complaint Name 02/03/2015 15-02046 CHARNETZKY, ROBERT Badge No: 7964 Location Address 4690 RACE RD NWB Narrative OVERDOSE On this date central dispatch advised that a female subject at this location had overdosed on her medications. 15-02046 Time 9:20:41 pm FRANKLIN TWP Dispo: Upon arrival it was determined that the female victim had taken the rest of her prescription medications due to depression. Female subject was transported to Mercy Hospital for treatment. Report Date Call Number Complaint Name 02/03/2015 15-02045 MARTIN, NANCY Badge No: 7937 Location Address 8456 S HIGH ST Narrative PROPERTY DAM 15-02045 Time 5:21:57 pm MNERL CTY VLG Report Date Call Number Complaint Name Time 02/03/2015 15-02044 VIVENT ALARM / P587 5:09:05 pm Badge No: 7923 Location Address 107 ASH ALLEY STONE CREEK Narrative POLICE ALARM Received a call of an alarm going off at the business located at 107 Ash Alley Stonecreek. The alarm company advised the alarm indicated side door motion. R/O responded to the business and checked the perimeter. The perimeter checked secure. No keyholder responded. Report Date Call Number Complaint Name 02/03/2015 15-02043 JFS-MANDY Badge No: 7923 Location Address 8828 REED RD NW Narrative WELFARE CHEC Job and Family Services contacted our office in reference a juvenile at 8828 Reed RD possibly harming herself. Time 4:27:40 pm LAWRENCE TWP Deputies arrived and spoke with 12yr old Morgan Burkert. She stated she posted a message on social media to her friends. She stated she made the statement for attention and does not want to harm herself. Deputies spoke with the father, Shaun Burkert, and advised him of the complaint. When Deputies arrived, Vince Edwards 19yr old who is Morgan's brother, was at the residence. The father stated Morgan could be left in his care until their mother arrives. No report. Report Date Call Number Complaint Name Time 02/03/2015 15-02042 NEWMAN, STEVE 2:30:17 pm Location Address Badge No: 7923 1803 OLDTOWN VALLEY RD SE GOSHEN TWP Narrative DISABLED VEH Received a call from Steve Newman. Steve advised that a vehicle with a female driver was stuck in his yard near the driveway. Steve was concerned about the vehicle damaging his property. Steve request a Deputy respond to his residence to check on the vehicle and the female driver. R/O responded to the residence and located the vehicle. R/O spoke with the driver of the vehicle, Valerie Dieter. She advised that she was attempting to turn around in the driveway and slide on the ice. Valerie had already contacted a tow company to come and remove the vehicle. R/O advised Steve that a tow truck was en route to remove the vehicle. Steve just requested the incident on record in case of any damage to property is found after the snow melts. Report Date Call Number Complaint Name 02/03/2015 15-02041 DRAHER, ALVIN Badge No: SO79 Location Address 8682 DUTCH VALLEY RD SE Narrative Friday, February 6, 2015 Time 12:13:35 pm RUSH TWP Page 9 of 23 FRAUD Received a call from Alvin Draher. Alvin wished to speak with a Deputy reference possible fraud. Alvin was at Uhrichsville Police Department to make a report. R/O responded to Uhrichsville Police Department and spoke with Alvin. He advised that he had received a letter from the Ohio Department of Taxation. They advised that someone had filed 2013 tax in Alvin's name. Alvin advised that he had not filed any taxes for 2013. Alvin had already made contact with several different law enforcement agencies about the incident. Alvin advised he need to make a report with The Sheriff's Office to begin the investigation. R/O advised the incident will be on record. Report Date Call Number Complaint Name 02/03/2015 15-02040 TUERLER, LOTTIE Badge No: 7923 Location Address 4712 YACKEY DR NW Narrative PHONE HARASS PENDING Time 11:20:37 am FRANKLIN TWP Report Date Call Number Complaint Name 02/03/2015 15-02039 MAXWELL, PAM Badge No: 797 Location Address 9968 HESS MILL RD NE Narrative MDP Caller stating when she is not home someone enters her residence and uses her laptop computer. Time 11:19:11 am LAWRENCE TWP R/O spoke with Pam Maxwell by telephone. She stated a computer hacker came into her home and accessed her laptop computer. She stated she hides it behind her dryer laying down. On today's date she noticed it standing upright. I advised her this complaint will be on record at our office. Report Date Call Number Complaint Name Time 02/03/2015 15-02038 RAGERSVILLE ELEM/TRAVIS, CASEY 10:08:34 am Badge No: 7910 Location Address 2425 BOLTZ ORCHARD RD SW AUBURN TWP Narrative SUSP VEHICLE On 2-3-2015 dispatch received a call from Ragersville Elementary advising of a green Honda Civic parked across from the school. They would like someone to check on it. 7910 responded and was utl on the vehicle. R/O learn that the vehicle was ran back in October of last year because it was broke down on Stonecreek Road. R/O advised the principal of same. Report Date Call Number Complaint Name 02/03/2015 15-02037 THOMPSON, MIRANDA Badge No: S1110 Location Address 6836 STATE ROUTE 93 NW Narrative SHOOTING PENDING Time 1:59:10 am WAYNE TWP Report Date Call Number Complaint Name 02/02/2015 15-02035 BAYER, KENNY Badge No: SO79 Location Address 1798 TABOR RIDGE RD NE Narrative VANDALISM PENDING Time 3:42:13 pm GOSHEN TWP Report Date Call Number Complaint Name 02/02/2015 15-02034 PATTERSON,SONTONA Badge No: 7911 Location Address 8882 STATE ROUTE 800 SE Narrative Time 8:51:52 pm Friday, February 6, 2015 MILL TWP Page 10 of 23 ID THEFT 15-02034 Tuscarawas County Central Dispatch received a call from a Sontona R. Patterson who advised that her cousin, Amanda Patterson had stolen her Ohio drivers license. Sontona also stated that Amanda was arrested in Belmont County where she provided her Ohio drivers license and claimed to be her. Dispo: Deputy Stocker responded to the call and spoke to Sontona Patterson. Ms. Patterson explained that Belmont County S.O. called her family to inform them that Sontona had been arrested. The family informed Belmont County S.O. that Sontona was currently at her residence and that there was a mistake. The correction was made and Deputy Stocker made contact with Belmont County in regards to the Ohio drivers license that was in Amanda Patterson's possession. A report will be sent to the County Prosecutor's Office on the charge of "Identity Fraud" O.R.C. 2913.49 . Report Date Call Number Complaint Name Time 02/02/2015 15-02033 USA CENTRAL STATION/716 6:13:12 pm Badge No: 7937 Location Address 5934 OLD ROUTE 39 NW SUGAR CRK TWP Narrative POLICE ALARM ADT contacted our office regarding an Alarm activation at the Breitenbach Winery. Upon arrival I spoke with Scott Kohler who is the manger of the Winery, we both walk through the business and all checked out ok. All secure at this time. Report for record only. Report Date Call Number Complaint Name Time 02/02/2015 15-02032 ADT/CBP 5:45:23 pm Badge No: 7937 Location Address 4209 GARBER DR NW FRANKLIN TWP Narrative POLICE ALARM ADT security contacted our office regarding a alarm activation at the Newton residence. Upon arrival all doors secure and no one was at home at that time. All ok. ADT was advised. Report Date Call Number Complaint Name Time 02/02/2015 15-02031 VETERANS AFFAIRS POLICE- WITHROW 3:34:16 pm Badge No: 7923 Location Address 3717 TALL TIMBER RD NE FAIRFIELD TWP Narrative WELFARE CHEC Received a call from Veterans Affairs Police. They wished to have Deputies check a residence on Tall Timber Road for Joe Evans. They advised that Joe is missing from their care and threatening to harm himself. Deputies responded to the residence. Deputies were unable to locate any one at the residence. Deputies then began checked the perimeter an out building on the property. Joe was not located. Veteran Affairs advised that they were unsure if Joe was currently residing at the residence. Deputies not able to locate any one around the residence either. Dispatch advised Veteran Affairs Police of same. Report Date Call Number Complaint Name 02/02/2015 15-02030 3003 Badge No: 7923 Location Address 4359 FRYS VALLEY RD SW Narrative WARRANTS PENDING Time 3:00:16 pm SALEM TWP Report Date Call Number Complaint Name Time 02/02/2015 15-02029 MALE CALLER 3:08:22 pm Badge No: 7923 Location Address 2175 BARNHILL RD BARNHILL VLG Narrative SUSP VEHICLE Received a call from a male subject advising of a male subject sitting in a gold vehicle in the area. The caller wished to have a Deputy respond and check the area. R/O responded to the area and checked for the vehicle with the male subject. R/O was unable to locate any vehicle with a male subject sitting in the area. Friday, February 6, 2015 Page 11 of 23 Report Date Call Number Complaint Name Time 02/02/2015 15-02028 1905 1:56:13 pm Badge No: 7910 Location Address MILL TWP 8091 NEWPORT RD SE Narrative ASSAULT On 2-2-2015 dispatch received a call from Uhrichsville P.D. advising they have two subject on their station wanting to report an assault. 7910 responded and spoke with Kyle Harmon and Chawna Fredrickson. Kyle advised Chawna is his ex-girl friend and they have a child in common. Kyle said he was driving down Waterworks Hill Road with his friend, Jack Tinney Jr. and he saw Chawna and her sister, Catrina Beatty drive up behind him blowing the horn. Kyle pulled over at the water treatment plant. Kyle said Chawna came running up to the car yelling and hitting the window. Chawna opened the door and started punching Kyle. Chawna said she saw Kyle smoking spice in the car with their child and she wanted to get the child back. Chawna said Kyle hit her. I obtained written statements from everybody involved and pictures of Kyle's injuries. Chawna was arrested for domestic violence and 7923 transported her to the Justice Center awaiting arraignment. Report Date Call Number Complaint Name 02/02/2015 15-02027 SNYDER, ANNABELLE Badge No: 797 Location Address 6514 BAERTOWN RD NW Narrative PHONE HARASS Phone harassment. Time 11:34:24 am FRANKLIN TWP R/O spoke with the complainant and advised her I attempted to contact the phone number she provided. The number came back as disconnected. Report Date Call Number Complaint Name 02/02/2015 15-02026 MILLER,JORDAN Badge No: SO79 Location Address 745 KINGWOOD DR NE Narrative THEFT Caller reporting his vehicle was entered into overnight. Time 10:20:38 am LAWRENCE TWP Jordan Miller advised Central Dispatch he did not want a Deputy to respond. Just wanted it on record. Report Date Call Number Complaint Name 02/02/2015 15-02025 MUNICIPAL COURT Badge No: 797 Location Address 11105 STRASBURG BOLIVAR RD NW Narrative IMMOBILE VEH Deputy responded to 11105 Strasburg-Bolivar Rd. for a court ordered vehicle Immobilization. Time 8:00:14 am FRANKLIN TWP Vehicle plates were removed per the court order. All documents completed. Copies sent to Municipal Court and Ohio BMV. Report Date Call Number Complaint Name 02/02/2015 15-02024 TWISS, SHANE Badge No: 797 Location Address 780 GARBERDALE SQ NEK Narrative THEFT Caller reporting his vehicle was entered overnight. 15-02024 Time 8:19:00 am LAWRENCE TWP Mr. Twiss advised his 2010 Hyundai was entered. the vehicle was unlocked and parked in a residential lot. He advised nothing was taken. Report for record. Report Date Call Number Complaint Name 02/02/2015 15-02023 SPROWL, RON Badge No: 7929 Location Address 3127 HIGH HILL RD SE Narrative Friday, February 6, 2015 Time 7:23:42 am PERRY TWP Page 12 of 23 SUSP VEHICLE Mr. Sprowl reported a dark colored truck, with a male and female occupant, were sitting in his driveway. Sprowl went out to speak with them and they wanted to enter his residence and use the phone. Sprowl denied them entry and told them to be on their way. A relative of Sprowl found the vehicle still in the area, several hours after initial contact, and called our office to report the suspicious vehicle. Lt. Alford was advised and responded to the area. After patrolling the area, the vehicle was located travelling on Laurel Valley Rd. The occupants were found to be 28 yoa Tara N. Shea and 48 yoa Thomas Gough, both of 23099 Twp. Rd. 409 out of Warsaw Oh. The couple reported that they were in the area to pick up another female, prior to heading to West Virginia. The female, who they report lives on High Hill Rd. decided no to go with them out of state. R/O did not feel their story made sense and requested permission to search the vehicle. A loaded 9mm handgun and three additional high capacity magazines were located and a small amount of Marijuana. Tara Shea reported that the gun and drugs were her's and she would take responsibility. Shea was issued a summons for Improper Handling of a Firearm in a motor vehicle and for possession of marijuana. Both were then released from the scene and advised to appear at Southern District court on 02/10/2015 at 1300hrs. Report Date Call Number Complaint Name 02/02/2015 15-02022 LEGG,OLIVIA Badge No: 797 Location Address 779 KINGWOOD DR NEB Narrative THEFT Caller reporting her vehicle was broken into overnight. 15-02022 Time 5:48:10 am LAWRENCE TWP Olivia Legg stated around 05:15 am her vehicle was broken into and personal papers were stolen. The vehicle was parked and locked at her residence. No damage to the vehicle was observed. Pending investigation. Report Date Call Number Complaint Name 02/02/2015 15-02021 SAXON, PATTY Badge No: 7927 Location Address 201 E OHIO AV Narrative DOMESTIC DIS Patricia Saxon reporting that her daughter and her daughter's boyfriend are having an argument. Time 12:25:49 am DOVER TWP Dispo: I responded to the scene and made contact with Natalie L. Saxon (OLN TM030511) and Matthew A. Poulson (CA OLN F2923410). Both parties advised they had just ended their relationship and have been arguing over personal issues and the posting of same on social media. Both deny any physical assaults or altercations. Natalie willingly left the residence for the evening in order to avoid any further problems. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/01/2015 15-02020 WATSON, BARBARA 11:46:22 pm Badge No: 7945 Location Address 6726 BETHEL RD SE MILL TWP Narrative HANGUP 911 Central Dispatch received a 911 hang up call from 6726 Bethel Rd. S.E., upon call back there is just static on the line. Dispo: I responded to the above location and spoke with the home owner Barbara Watson and everything is fine. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name 02/01/2015 15-02019 YODER, CURT Badge No: 7927 Location Address 2772 SIMONS DR NW Narrative SUSP VEHICLE Curtis Yoder reporting a vehicle parked in the Valley View Church parking lot. Time 11:32:59 pm SUGAR CRK TWP Dispo: I responded to the scene and located a Maroon Ford Fusion (OH Reg EZV3388). The vehicle was unoccupied with no one around. The building was checked and found to be secure with nothing appearing to be out of place. N/R Deputy A. Fisher 7927 Friday, February 6, 2015 Page 13 of 23 Report Date Call Number Complaint Name Time 02/01/2015 15-02018 DUDA, FRANK 10:48:27 pm Badge No: 7927 Location Address STRASBURG VLG 435 N WOOSTER AV Narrative SUSP VEHICLE Dispatch reporting a white Crown Vic following a vehicle around Strasburg. The vehicle then pulled into the driveway of 435 N. Wooster Ave where the caller resides. Dispo: I assisted Strasburg PD and patrolled the area in an attempt to locate the vehicle. Units were ultimately unable to locate any vehicle matching the description given. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/01/2015 15-02017 GARDNER, MICHAEL 8:53:55 pm Badge No: 7927 Location Address 9713 STATE ROUTE 93 NW FRANKLIN TWP Narrative SERVICE CALL Michael Gardner reporting that he and his wife located a dog which had fallen through the ice in a small body of water on the west side of 93 across from his house. Dispo: Units responded along with the Strasburg and Beach City Fire Departments. Several unsuccessful attempts were made to rescue the dog. The canine ultimately could not be reached due to the thin ice and succumbed due to the elements. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/01/2015 15-02016 DOVER PD 8:11:21 pm Badge No: 7927 Location Address SALTWELL RD NW DOVER TWP Narrative SUSP PERSON Dover PD advising they received a call from an unknown individual reporting a female in her bathrobe standing along Saltwell Rd. Dispo: I responded to and patrolled the area. I was unable to locate anyone standing outside or along the roadway. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 02/01/2015 15-02015 DUNHAM,CHRIS 7:11:09 pm Badge No: 7925 Location Address 12268 SHERMAN CHURCH RD NE LAWRENCE TWP Narrative CHILD ENDNGR Welfare Check Mr. Christopher Dunham called reporting that he is concerned that his son, Christopher Dunham Jr. is not home at this time and is concerned about him being at school in the morning. Mr. Dunham reports that his ex-girlfriend (son's mother) left the home two (2) days ago with Chris and has not returned. Contact was made with Ms. Melinda Howard (02-14-1986). Ms. Howard reports that she and Mr. Dunham have broken up and that she has moved out and will not be returning to the house on Sherman Church, Rd., Lawrence Township. Ms. Howard reports that she and Chris Jr. are ok and she is making arrangements for school, etc. Both parties advised that they should seek the assistance from their attorney (s) and the Juvenile Courts for visitation, place of residence, etc., if they are not going to be living together as a family. N/R Deputy B. R. Watson -7925 Report Date Call Number Complaint Name 02/01/2015 15-02014 MAURER, DAVID Badge No: 7916 Location Address 3460 STATE ROUTE 800 NE Narrative Friday, February 6, 2015 Time 4:16:57 pm DOVER TWP Page 14 of 23 TRESPASSING David Maurer reporting his nephew, Adam Bott is on the property he has sole use of. This office has been to this location several times dealing with this dispute. David states that the property is currently in a trust, in which he and sisters are involved. The family is in a dispute over ownership and use of this property. It has been documented that the nephew, Adam Bott has permission to hunt on this land. David was requesting a unit either go in the woods, or wait til Adam comes out of the wood and request to see his ODNR permission slip. I explained to David that just like in previous complaints, although he is the executor of the esates, siblings have an invested right to enter the property, or give permission for someone to enter the property and hunt. I attempted to explain to David that he and his attorney and his sisters attorney get together and attempt to mediate this issue. David said he was going to contact his attorney. Davis also wanted it documented that he vehicle belonging to his nephew was parked on a neighboring property with permission. Report Date Call Number Complaint Name Time 02/01/2015 15-02013 ANONYMOUS 4:17:38 pm Badge No: 796 Location Address 450 GRAVEL LICK RD SW WASHINGTON TW Narrative DOMESTIC DIS On 02-01-2015 Central Dispatch received a third party complaint of a domestic incident at 450 Gravel Lick Rd in Port Washington. Units responded and made contact with Jeremy Hensel and Jennifer Stevens. Jennifer stated that she had received a text message from a male subject that she is friends with. Jennifer stated that Jeremy was not happy with contents of the message and they began to argue about same. Neither party reported any threats or assaults taking place. Jennifer left the residence and was going back to her residence in New Philadelphia. N/R Anderson/796 Report Date Call Number Complaint Name 02/01/2015 15-02012 JONES,MATHAN Badge No: 794 Location Address 412 N RAY ST Narrative THEFT Caller reporting overnight, he caught a male attempting to steal diesel fuel from three of his parked semis. 15-02012 Time 3:08:58 pm BALTIC VLG I spoke with, obtained a statement and photographed the spilled diesel fuel that was left behind after the caller, Nathan Jones located a male on his property with a hose and can with gallons of diesel fuel inside. When confronted, the male stated his name was John Morris and was driving a silver mini van with green doors and fenders. When Nathan attempted to contact this office, the man fled in his vehicle. I attempted to locate the above described vehicle in the are without success. I will continue during my next scheduled day and follow up on same. Report Date Call Number Complaint Name Time 02/01/2015 15-02011 WALKER,TODD 2:11:37 pm Badge No: 794 Location Address 8883 CUTLER RD NE WARREN TWP Narrative UNK TYPE COM Todd Walker reporting that his neighbor, who is a family member swerves at him when he is in the roadway with his utility vehicle going to and from the location where his horses are kept. I spoke with Todd, who has a utility vehicle, which he uses to haul straw to his horses. The vehicle is equipted with both front and back lights, turn signals and a slow moving placard visible . The neighboring female, who he states is a cousin does not like that he uses this mode to carry straw to and from and when he is going down the side of the roadway she will swerve at him which he think she is trying to cause an accident whereas he will be cited. The caller only wanted this reported for record and to have a unit look at the type of utility vehicle he is using. I did explain to him that any further type action by the female neighbor to contact this office. Report Date Call Number Complaint Name 02/01/2015 15-02010 RENNAD,GEORGE Badge No: 796 Location Address 11083 RIVER RD SW Narrative Friday, February 6, 2015 Time 1:58:27 pm SALEM TWP Page 15 of 23 AUTO ACCIDEN Central Dispatch received a phone call of an automobile accident in the vicinity of 11083 River Rd in Port Washington. Writer checked the area and was not able to locate an accident. While checking the area it was noticed where a section of guard rail had been struck but there was no one at the scene. While writer was further checking the area Central Dispatch received a phone call from a male subject who resides in Harrison County. The male subject advised that his 12 year old son had made a bogus complaint and there was reportedly no accident. Complaint appeared to be unfounded. N/R Anderson/796 Report Date Call Number Complaint Name 02/01/2015 15-02009 SILVERSTONE,AILEEN Badge No: SO79 Location Address 5916 MIDDLE RUN RD NW Narrative THEFT Caller believes someone is taking her parents dogs. Time 12:30:05 pm DOVER TWP Dispo: Eileen Silverstone is calling from California to report that someone has been taking her elderly parents dogs. One dog had been let out and was located by the dog warden in Dover. Now a second dog has come up missing from inside the barn. There is no way the dog got out on its own. During the course of the investigation r/o learned that the second dog is in the custody of the Humane Society who had allegedly received a call about the living conditions. This information was passed along to Eileen Silverstone. No report Deputy Rick A. Morrison #7916 Report Date Call Number Complaint Name 02/01/2015 15-02008 SCHWEIZER, DEVON Badge No: 7916 Location Address 873 KERNS DR NEA Narrative DOMESTIC DIS Devon wanted his girlfriend removed from the residence. Time 10:10:20 am LAWRENCE TWP Dispo: Devon called and wanted to have his girlfriend/ex-girlfriend (Amanda Marteny) removed from his apartment. Devon advised they had just moved into the apartment on Friday 1-30-2015 and Amanda had paid him $450.00 towards the rent. They've had an argument and since she is not on the lease he wants her out. Devon was told he has civil agreement with Amanda and that he would have to have her evicted. It was suggested to him to pay back the $450.00 and to help her move out to another location in a civil manner to remedy the situation. Amanda Marteny claims she and her young daughter have no where to go; no one she can move in with at this time. She claims she can not move back in with her mother. R/o suggested she keep searching diligently in order to get out of this situation. Amanda claims she has been trying to avoid Devon and does not want to argue. She also claims Devon has been drinking and that is one of their issues. Devon is old enough to consume alcohol legally. No threats or violence took place. No one wished to complete a statement. No report Deputy Rick A. Morrison #7916 Report Date Call Number Complaint Name 02/01/2015 15-02007 DEVORE,CODY Badge No: 794 Location Address 4671 W CENTER ST Narrative DISTURBANCE Caller requesting a unit ref. to his fiancé parents are at the home harassing him. Time 9:25:58 am MNERL CTY VLG I spoke with both sides. The caller was a victim of domestic violence last evening and his fiancé was arrested. Today, her parents arrived at the home demanding he move from the home. I explained to both parties that since it is agreed that the caller (Cody) does live at this home, he could not be forced to leave the home by myself or either them without a court order. The parents were not happy with this, but did leave the home at Cody's request. Friday, February 6, 2015 Page 16 of 23 Report Date Call Number Complaint Name Time 02/01/2015 15-02006 SICKELS,ANN 8:30:09 am Badge No: 7933 Location Address MIDVALE VLG 4319 W STATE ST Narrative WELFARE CHEC Caller reporting a female at this residence, assaulted her boyfriend a few days ago. Caller also feels that this female smokes and takes pills while pregnant and is abusing her children. I attempted contact at the home and got no answer at the door. It was learned from a neighbor that the female works on Sundays. I did forward this complaint to afternoon unit for follow up. Report Date Call Number Complaint Name Time 02/01/2015 15-02006 SICKELS,ANN 8:30:09 am Badge No: 7933 Location Address 4319 W STATE ST MIDVALE VLG Narrative WELFARE CHEC Caller reporting a female at this residence, assaulted her boyfriend a few days ago. Caller also feels that this female smokes and takes pills while pregnant and is abusing her children. I attempted contact at the home and got no answer at the door. It was learned from a neighbor that the female works on Sundays. I did forward this complaint to afternoon unit for follow up. Report Date Call Number Complaint Name 02/01/2015 15-02006 SICKELS,ANN Badge No: 7933 Location Address 4319 W STATE ST Narrative WELFARE CHEC follow up for 794. Ann Sickels called about possible child abuse. Time 8:30:09 am MIDVALE VLG I spoke with Tori and Michael this was over Ann's boyfriend cheating on her and now she is causing problems for Tori at work and with her childs father. N/R Report Date Call Number Complaint Name 02/01/2015 15-02006 SICKELS,ANN Badge No: 7933 Location Address 4319 W STATE ST Narrative WELFARE CHEC follow up for 794. Ann Sickels called about possible child abuse. Time 8:30:09 am MIDVALE VLG I spoke with Tori and Michael this was over Ann's boyfriend cheating on her and now she is causing problems for Tori at work and with her childs father. N/R Report Date Call Number Complaint Name Time 02/01/2015 15-02005 DEVORE,CODEY 2:38:31 am Badge No: 7945 Location Address 4671 W CENTER ST MNERL CTY VLG Narrative DOMESTIC DIS Central Dispatch received a call from Cody Devore 4671 Center St. Mineral City advising that his fiancé Tonya Tullos has left the residence on foot and she is intoxicated. Cody stated that he is concerned for her safety due to her intoxicated state. Dispo: I responded to the area along with Sgt. Jones and located both the complainant Cody Devore and his fiancé Tonya Tullos (OLN. RY373774) walking in the middle of Center St near their residence. We spoke with both parties and they advised that there were no physical altercations, that they had just had an argument. Both parties agreed to go home and go to bed and discuss their situation at a later time. Both Sgt. Jones and myself had left the area, I had not been gone for more than approximately ten minutes when Central Dispatch advised they were receiving 911 hang up calls from the Center St. residence again. I returned to the residence and spoke with both parties learning that Tonya Tullos had assaulted Cody DeVore. Cody advised that he wished to pursue charges against Tonya and provided a written statement of the events. Tonya Tullos was arrested for domestic violence and assault and taken to the Tuscarawas County Justice Center for incarceration. Report to follow. Deputy K. Limbacher 7945 Friday, February 6, 2015 Page 17 of 23 Report Date Call Number Complaint Name 02/01/2015 15-02004 ADT/WIF Badge No: SO79 Location Address 8226 STATE ROUTE 800 SE Narrative POLICE ALARM ADT called an alarm activation at the above residence. Time 1:59:53 am MILL TWP I responded and spoke with the home owner, she never received a call that the alarm was activated and it never went off in the residence. N/R Report Date Call Number Complaint Name 02/01/2015 15-02003 D-KAYS/JOANNA BYERS Badge No: 7933 Location Address 2959 BRIGHTWOOD RD SE Narrative ASSIST REND D Kay 'S bar called and reported that it had a patron that was refusing to leave. Time 1:22:03 am WARWICK TWP I spoke with the owner of the bar who stated that she called and then the patron left. N/R Report Date Call Number Complaint Name 02/01/2015 15-02002 SIMMONS,AMANDA Badge No: 799 Location Address 1496 PLEASANT HILL RD NW Narrative SUSP PERSON Caller reporting seeing a man walking in her woods. Time 12:06:43 am DOVER TWP Disposition: Units checked the woods where the caller said she seen the man. Units found no footprints from any human. 799 Report Date Call Number Complaint Name 02/01/2015 15-02001 HARVEY,DANIEL Badge No: 7925 Location Address 11286 STRASBURG BOLIVAR RD NW Narrative TRESPASSING Trespassing - ATVs on Bolivar Sportsman's Club property Time 12:04:05 am LAWRENCE TWP Mr. Harvey reporting that an unknown number of person (s) are riding ATV's on his property and were last seen riding on the Sportsman's club's property. I patrolled Strasburg- Bolivar road and back around to the caller's address on Ridge rd. I was not able to located the ATV's at either location. I stayed in the area for a while and was not able to hear the ATV's in the woods. - UTL N/R Deputy B. R. Watson -7925 Report Date Call Number Complaint Name 01/31/2015 15-01506 TALL TIMBER-WOOD,ERIC Badge No: 799 Location Address 1921 TALL TIMBER RD NE Narrative SHOTS FIRED Woods Tall Timer Resort reporting shots in the area. Time 11:44:23 pm GOSHEN TWP Disposition: I checked the area and was not able to locate anyone shooting. 799 Friday, February 6, 2015 Page 18 of 23 Report Date Call Number Complaint Name Time 01/31/2015 15-01505 LANZER,RICHARD 10:20:44 pm Badge No: 7945 Location Address FRANKLIN TWP 5817 DUNDEE STRASBURG RD NW Narrative PHONE HARASS Central Dispatch received a call from Richard Lanzer reporting for her neighbor Lawanna Rine at 5817 Dundee-Strasburg Rd. that she has been receiving phone calls from a male subject stating that she has won a new car and money. Richard requests that a Deputy respond to the residence and speak with Ms. Rine due to the possibility of this being a scam. Dispo: I responded to the above location and spoke with Lawanna Rine (OLN. RN042192), she advised that a male subject stating his name is David Williams ( ph# 1-876-846-0528) is telling her that she has won a new car and $150.000.00 and could claim her winnings at her nearest drug store. I attempted to call David Williams at the number he called from and left a message to stop calling the Rine residence. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name 01/31/2015 15-01504 BEANS,PATRICA Badge No: 7933 Location Address 8669 MCKINLEY AV NE Narrative CIVIL Complainant wanted to speak with a Deputy reference getting a dog from his ex-girlfriend. Time 10:38:34 pm SANDY TWP I spoke with the complainant she had already retrieved her stuff. N/R Report Date Call Number Complaint Name 01/31/2015 15-01503 NPPD Badge No: 7933 Location Address 1000 UNION AV NW Narrative ASSIST/OFFIC N.P.P.D. called and requested K-9. Time 10:08:24 pm NEW PHILA I was canceled while in route. N/R Report Date Call Number Complaint Name 01/31/2015 15-01502 CADLE, RANDALL Badge No: 7933 Location Address 4584 E STATE ST Narrative SUSP VEHICLE Complainant called and advised he seen a green mini van in the area. Time 9:13:58 pm MIDVALE VLG I checked the area and did not locate and green van. N/R Report Date Call Number Complaint Name Time 01/31/2015 15-01501 RAMBAUND,ANNA 7:34:40 pm Badge No: SO79 Location Address 11276 EAST AV NE SANDY TWP Narrative THREATS Central Dispatch received a call from Anna Rambaud at 11276 East Ave. Sandyville, Anna stated she received a phone call from a male subject with a foreign accent requesting money from her. Anna requests to speak with a Deputy, she beives this is possibly a scam. Dispo: I responded to the above location and spoke with Anna Rambaud (OLN. RQ332704) and her son Earl Rambaud, they advised a male subject with a foreign accent called and spoke with Anna, the male subject requested $1000.00 dollars from Anna and advised her he would come to her residence to get it. Anna and Earl both believe this to be a scam, she does not have caller identification and could not provide the number that she received the call from, they request to have this matter on record and extra patrol in the area of the residence. N/R Deputy K. Limbacher Friday, February 6, 2015 Page 19 of 23 Report Date Call Number Complaint Name Time 01/31/2015 15-01500 HOSTETLER,RUTH NICOLE 6:34:04 pm Badge No: SO79 Location Address DOVER TWP 3422 BROAD RUN DAIRY RD NW Narrative SUSP PERSON Central Dispatch received a call from Ruth Hostetler at 3422 Broad Run Dairy Rd. N.W. Dover Twp. advising of a male subject that was at her door knocking and stated that he had a gift for her if he could interview her. Ruth advised the male subject left in a vehicle, possibly a Lexus, (unknown color or model) last seen going toward Stony Point Rd. Dispo: I responded to the area and was unable to locate any male subjects in a Lexus going door to door at this time. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name Time 01/31/2015 15-01499 ADT/OSK 5:55:45 pm Badge No: 7945 Location Address 7924 EBERHART RD NW LAWRENCE TWP Narrative POLICE ALARM Central Dispatch received a call from ADT advising of an alarm activation at 9724 Eberhart Rd. N.W. Lawrence Twp. Dispo: I responded to the above location and met with a key holder Paula Jo Foltz (OLN. RP068168) she stated that everything was fine, she actually activated the alarm herself. She spoke with the home owner on the telephone while I was on scene and advised them of the same. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name 01/31/2015 15-01498 BUTCHKO, JON Badge No: 794 Location Address 5124 M ST NE Narrative THREATS Caller wanted advice about a subject who has been living with them and won't leave. Time 2:12:25 pm SANDY TWP Dispo: Jon and his wife Audry let a friend (Joseph Perchinske) stay with them but now he wont leave. Today he allegedly was upset with Audry not turning the wireless internet on and yelled at her. He gathered his belongings and moved out when his girlfriend came and picked him up. Jon and Audry were given several suggestions and told a record of the call would be on file. Joseph Perchinske is not wanted at their residence and does not reside at their residence. No report Deputy Rick A. Morrison #7916 Report Date Call Number Complaint Name 01/31/2015 15-01497 TYCO- IAI Location Address Badge No: 796 5554 GUNDY DR Narrative POLICE ALARM Central Dispatch received a complaint in regards to an alarm activation at the above listed business. Time 1:44:23 pm MIDVALE VLG Writer checked the business and everything appeared to check. No key holder responded. N/R Anderson/796 Report Date Call Number Complaint Name 01/31/2015 15-01496 ROTUNNO,JUSTIN Badge No: 7918 Location Address 1082 NORTH ORCHARD RD NE Narrative ID THEFT Carrie Rotunno called to report the her credit/debit card had been used. Time 12:09:45 pm LAWRENCE TWP R/O spoke with Carrie who advised that she got on line this morning and noticed that there was a $99.00 transaction made on her Master Card around 0230 hours this morning. Carrie checked with her husband and was advised that he did not use the card. Carrie said that it was used in Canton, Michigan. It appears that it was used at a pump outside the Speedway. Carrie had already cancelled that card and was advised by her bank (St. Joseph Credit Union) that she needed to report this to our office. Carrie just wanted this on record at this time. Friday, February 6, 2015 Page 20 of 23 Report Date Call Number Complaint Name 01/31/2015 15-01495 ADT / GLJ Badge No: 7918 Location Address 4209 GARBER DR NW Narrative POLICE ALARM McDonald called to report that they have two cars parked blocking the trash hopper. Time 12:18:19 pm FRANKLIN TWP Units made contact with both vehicle owners who had parked there thinking they were out of the way as they car pulled with others. The owners responded back and moved their vehicle. All okay. Report Date Call Number Complaint Name 01/31/2015 15-01494 MALE CALLER Badge No: 794 Location Address CLUB LN SE Narrative WARRANTS Caller reporting Eric Kramer, who has an entered warrant was just seen in the area. Time 12:18:34 pm GOSHEN TWP I checked the last known address and the next door address and did not locate the wanted subject. Report Date Call Number Complaint Name 01/31/2015 15-01493 ADT- DG8 Badge No: 796 Location Address 7285 GREEN RIDGE RD SE Narrative POLICE ALARM Alarm drop at listed address. Time 12:05:08 pm UNION TWP Dispo: R/o responded and the homeowner was home prior to units arrival. She advised all was o'k. Possibly the dog. She has an appointment for next week with ADT. No report Deputy Rick A. Morrison #7916 Report Date Call Number Complaint Name 01/31/2015 15-01492 MCDONALDS- MEREDITH Badge No: 7918 Location Address 11123 STATE ROUTE 212 NE Narrative PARKING COMP PENDING Time 11:46:35 am LAWRENCE TWP Report Date Call Number Complaint Name Time 01/31/2015 15-01491 ANONYMOUS CALLER 9:53:13 am Location Address Badge No: 796 8143 TINNEY RD SE UNION TWP Narrative WELFARE CHEC Central Dispatch received a call requesting a welfare check on a female and her children, due to the female selling spice and consuming same in front of her children. Writer responded and attempted contact with the female at her address at 8143 Tinney Rd in Dennison. Writer attempted to make contact with the female in question Nicole Tinney with no success. The complaint appeared to be unfounded due to the residence not being lived in and it appears that no one has been at the residence for sometime. N/R Anderson/796 Report Date Call Number Complaint Name 01/31/2015 15-01490 7916 Badge No: 7916 Location Address 11239 WEST AV NE Narrative WARRANTS R/o and Deputy Beckley executed a search warrant on the residence in reference case number 14-09480. Time 9:01:08 am SANDY TWP Deputy Rick A. Morrison #7916 Friday, February 6, 2015 Page 21 of 23 Report Date Call Number Complaint Name 01/31/2015 15-01489 MALICKY, MIKE Badge No: SO79 Location Address DUNDEE STRASBURG RD NW Narrative SUSP VEHICLE Unknown caller reporting a vehicle stuck in the mud along the roadway on Yackey Dr. Franklin twp. Time 8:57:35 am FRANKLIN TWP I located the vehicle which appeared to have become stuck off the side of the road along Yackey Dr. Contact was made with the vehicle owner, who was taking steps to move the vehicle. Report Date Call Number Complaint Name 01/31/2015 15-01488 MILLER, ROY Badge No: 794 Location Address 9203 CROOKED RUN RD SW Narrative HANGUP 911 911 hang up call from the above address. Caller stayed on the line and advised it was a misdial. Time 8:40:26 am AUBURN TWP I spoke with the caller and her husband who both stated it was a misdial, she was trying to dial another number. Report Date Call Number Complaint Name 01/31/2015 15-01487 LEIDNER, THOMAS Badge No: 796 Location Address 106 EAST AV NE Narrative CIVIL Thomas Leidner called to request a deputy to assist him in getting some of his items. Time 8:13:23 am TUSCARAWAS VLG Units stood by while Thomas and his father removed a dirt bike from the garage. Units also advised both parties not to have any contact with each other by phone or text messaging. All parties under stood. Report Date Call Number Complaint Name Time 01/31/2015 15-01486 MALE CALLER 6:55:22 am Badge No: 7916 Location Address 2844 SIMPSON RD SE MILL TWP Narrative SUSP VEHICLE Caller who would not give his name advising a subject has two children left in the vehicle that is running and she is not in the car. She is in the house. Dispo: R/o located a red Ford TK leaving the listed driveway. R/o stopped and spoke with the female driver (Donna Bland). She advised she received a text message from her estranged husband (Boyd Bland) telling her he changed the locks on their house and she had better come get her stuff out now. Donna said she responded and removed her clothing from the residence. She does have two children in the vehicle that she babysits for, and she left the vehicle running so that they would be warm. She gathered her clothing, put them in the truck and is leaving. She advised Boyd is upset over the divorce and is trying to get her in trouble. Donna was allowed to leave. The children were fine. No endangerment observed. No report Deputy Rick A. Morrison #7916 Report Date Call Number Complaint Name 01/31/2015 15-01485 CHARTER ONE/ELIEL Badge No: 7916 Location Address 11113 FAIROAKS RD NE Narrative POLICE ALARM Dispatch received an alarm at the bank. Time 6:01:49 am LAWRENCE TWP 7927 checked the bank and all was okay. Report Date Call Number Complaint Name 01/31/2015 15-01484 LEIDNER,THOMAS Badge No: 799 Location Address 106 EAST AV NE Narrative Friday, February 6, 2015 Time 5:00:51 am TUSCARAWAS VLG Page 22 of 23 UNK TYPE COM Caller reporting his soon to be ex-wife is sending harassing text messages. Caller wants to meet a unit. Disposition: I met with Thomas Lieidner who showed me the text messages. Thomas also showed me the order from the court that Stephanie had filed for divorce. Thomas was advised that I would make contact with Stephanie and tell her to stop sending the messages or she will be charged. Units attempted to contact Stephanie and she would not answer the door. I will have dayshift unit attempt to contact her. 799 Report Date Call Number Complaint Name 01/31/2015 15-01483 SECURITY CENTRAL/ MONIQUE Badge No: 7945 Location Address 2932 STATE ROUTE 259 SE Narrative POLICE ALARM Central Dispatch reporting of an alarm activation at the Insurance Auto Auction showing perimeter motion. Time 3:36:43 am GOSHEN TWP Dispo: Units responded to the scene and checked the area finding it all to be secure. N/R Sgt. Jones Report Date Call Number Complaint Name Time 01/31/2015 15-01482 WATKINS, MICHAEL 2:57:56 am Location Address Badge No: 7927 2909 CIRCLEVIEW DR NW DOVER TWP Narrative POLICE ALARM Michael Watkins reporting that he received a call from ADT reporting that his residential alarm was activated by a motion in his basement. Mr. Watkins is currently at the residence and did not hear anything but states that he is a heavy sleeper. Mr. Watkins is requesting that a unit respond and check the area. Dispo: Units responded to the residence and did not observe any fresh foot prints in the snow. Upon checking the exterior of the residence, everything was found to be secure. N/R Deputy A. Fisher 7927 Report Date Call Number Complaint Name Time 01/31/2015 15-01481 SAILS,RYAN 2:11:15 am Badge No: 7945 Location Address 6298 STATE ROUTE 800 SE MILL TWP Narrative FIGHT Central Dispatch received a call advising of a fight in progress at Tammie's Tavern 6298 State Route 800 S.E. Mill Township. Dispo: I responded to the above location along with Deputy Fisher, Deputy Martin, and Sgt. Jones, upon our arrival we learned that there was an altercation between three intoxicated female patrons. The parties involved, Lacie Hanshaw (OLN. TE982235), Brooke Henry (OLN. TE980540), and Julie Hunt (OLN. SZ569852) had an argument along with a physical altercation however all parties declined to pursue charges against each other and were sent on their way. N/R Deputy K. Limbacher 7945 Report Date Call Number Complaint Name 01/31/2015 15-01480 BROWN,BETTY Badge No: 7933 Location Address 2376 SHADYVIEW RD SW Narrative NOISE Complainant called and reported she heard a gun shot. Time 1:20:44 am YORK TWP Units checked the area and did not locate anything. Friday, February 6, 2015 Page 23 of 23
© Copyright 2026