BHARAT COKING COAL LIMITED A Subsidiary of Coal India Limited) P.O.Nawagarh: Block II Area Dist: Dhanbad. Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 TENDER NOTICE Dated : 31.1.2015 Sealed Tenders are invited for item wise rate from the experienced, eligible and financially sound contractors for the works mentioned below: Sl.no. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Name of Work (1) Dismantling of 6.6 KV OH line D/L feeder for clear the area to proposed new view point after OB filling and one span 3.3 KVOH line and three nos. pole dismantling for materials recovery of BOCP Mine. (2) Dismantling of 6.6KV OH line Benedih feeder for clear the area to advancing out sourcing face near Box cut-II,BOCP Mine. Dismantling transporting of Boiler of F/B to I.T. face (II) Dismantling of 8” dia pipe Box cut-II lower bench for HEMM activities at BOCP Mine. Failed 2000 GPM pump withdrawal and transportation from I.T. patch to RRWS (II) Shifting of 4000 GPM pump lower bench of I.T. patch(III) Dismantling and re- installation of tanker filling point. (IV) Installation of 8”/8” 2000 GPM pump at coal face ,BOCP Mine. (I) Shifting of 8”/8” dia centrifugal pump at coal face (II)Fabrication and installation of tanker filling point near Box cut-II Fire Zone (III) Shifting of 4000GPM pump centrifugal pump at I.T. patch ,BOCP Mine. Diversion of pipe line 8” dia and shifting of pumps 2000 GPM,4000GPM and 6000 GPM at I.T. patch ,BOCP Mine. Repairing and maintenance of HT/LT OH line and B/D attending and cable work for power supply and light fittings at different place at JOCP. Dismantling of pontoon on 4000 GPM pump 6.6 KV motor along with delivery and suction at JOCP. Shifting of II nd 2000 GPM pump motor set on drum pontoon along with re-erection of delivery and suction at coal face. Erection of lighting OH line and light fitting at different places for illumination of Haul road and OB dump and face /Mine lighting of BOCP Mine. Fixing of new pick holder and picks with crusher drum f feeder breaker No.1 with materials and labour cost at ist feeder Breaker of JOCP. Estimated cost in (Rs) 23314.00 Earnest money 1% of estimated cost Cost of tender 100.00 Time of Completion 15 days 9630.00 -do- 100.00 10days 33851.00 -do- 100.00 15days. 32,722.00 -do- 100.00 15days 49,830.00 -do- 100.00 15days. 38,548.00 -do- 100.00 15 days. 23417.00 -do- 100.00 10days. 41,986.00 -do- 100.00 15days 34779.00 -do- 100.00 15days 36,850.00 -do- 100.00 15 days. 1. The tender paper can be had from the office of the Area Manager(E&M), BII Area on any working days on production of money receipt as cost of tender fee mentioned above (non-refundable). The date of issue of tender paper will be from 3.2.2015 to 12.2.2015 Tender document purchased from the above office or downloaded from BCCL web site will only be accepted for further evaluation. Any other form of submitted tender will be rejected. 2. The tenderer should mention clearly on the top of the sealed envelop the NIT No. date of Opening part I / Part II (Price bid )whichever is applicable and sl.no. of the job . 3 The tenderer should mention clearly on the left bottom corner of the envelop their name &address, failing which the offer will be rejected. 4. Sealed & complete tender has to be dropped in the tender box kept at the office of AM(E&M)BII Area up to 1.00 PM on 13.2.2015 and same will be opened on the same day at 4.00 PM in the office of the undersigned in presence of the tenderers or their authorised representative. 5. The earnest money @ 1% of the estimated cost should be deposited along with the tender offer in the form of Demand Draft drawn on SBI, Dhanbad in favour of Bharat Coking Coal Limited, payable at Dhanbad or in cash. 6. The cash for earnest money will be accepted by Area Finance Manager, Block II Area from 9.30 AM to 4.00 PM in all working days other than Saturday. However, on Saturday the cash will be accepted from 9.30 AM to 12.00 PM. 7. Tenders not accompanied with the earnest money 42961will not be considered. The earnest money of the unsuccessful tenderers will be refunded without any interest and the earnest money of the successful tenderer will also not carry any interest and will be converted into security money. 8. Qualifying requirements for techno-commercial bid(Part-I) The following qualifying requirements must be fulfilled in the techno-commercial bid (Part-I)for the intending tenderers. If the qualifying requirements submitted along with the bid falls short of the qualifying requirements as given below, the tender will be outright rejected. ELIGIBILITY:A) The bidder must have the experience for similar nature of job. B) The tenderer must have experience of similar work during last seven years ending last day of month previous to the one in which tenders are invited as any one of the following :i) Three similar completed works each not less than 40% of the estimated value of the tender. ii) Two similar completed work each not less than 50% of estimated value of the tender. iii) One similar completed work not less than the amount equal to 80% of the estimated value of the tender. C). The average annual financial turn over during the last three financial year ending 31st March should be at least 30% of the estimated value. 9. The desirous tenderer may contact with the undersigned for their any clarification regarding submitting their offer. It will be presumed that the tenderer has gone through the tender document in details before submitting his offer. 10. The tenderer should submit their experience certificate copy, valid licence, Last 3 years income Tax Return copy and PAN copy. 11. If the contractor fails to fulfil to contracted agreement, the management reserves the right to employ another contractor at the risk and cost of the defaulting contractor. 12. No interest will be paid for the earnest money and security deposit. 13. The price quoted must be firm during the entire period of operation of the contract and the offers made must remain open and valid for at least 120 days from the date of opening of tender. 14. sealed offer for Sl. no. 3,4,5,6,8,9 & 10 to be submitted in two parts i,e. Part –I& Part –II.(price Bid) in separate sealed envelop. These two sealed envelops have to be put inside a third envelop. This third envelop has to be sealed and NIT No. etc. should be clearly mentioned as described in Sl.No.2 above/prepage . 15. Tenderer should clearly mention that they are agreed to all terms & conditions of NIT failing which tender will be treated as cancelled /rejected. If the tenderer remain silent about this in his offer ,it will be presumed that the tenderer is agreed to all terms & conditions of the NIT. 16. If any offer is found open or unsealed, that particular offer / tender will be rejected. 17. The order will be placed to the L1 firm on aggregate ;However the company / Management does not bind itself to accept the lowest (L1) tender and reserve the right to reject any or all the tenders at any point of time without assigning any reason whatsoever and split up the work between two or more tenderers or accept the tender in part and not in entirety. 18. The tenderer / bidder is required to sign in all documents submitted by him along with his offer by blue ball point pen with date and seal (Rubber Stamp); failing which the offer will be rejected. 19 . Incomplete tender, conditional tender will be rejected. 20. The Tender committee reserves the right to reject or accept any or all the tenders on part or in full at any point of time without assigning any reason what so ever. 21. The tenderer will also sign and seal (Rubber stamp )the tender document with blue ball point pen and submit the same along with part I of the offer as a token of acceptance of all terms & conditions of NIT . Chief Manager (E&M) Area Office, BII Area Distribution: 1. A.G.M, B-II Area. 2. A.F.M, B-II Area. 3. A.M (E&M), All Areas of BCCL. 4. Notice Board, Block-II Area . BILL OF QUANTITY.(SL.NO 1) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Dismantling of 6.6 KV OH line D/L feeder for clear the area to proposed new view point after OB filling and one span 3.3 KVOH line and three nos. pole dismantling for materials recovery of BOCP Mine. (2) Dismantling of 6.6KV OH line Benedih feeder for clear the area to advancing out sourcing face near Box cut-II,BOCP Mine. Dismantling f 6.6 KV OH line and two nos. Idle poles Sl.No. Particulars. Qty. Rate Amount. 1. Dismantling of ACSR Dog conductor 300m 2. Dismantling of disc insulator 6nos. 3. Dismantling of HT Pin insulator 6nos. 4. Dismantling of iron materials 170kg. 5. Dismantling of stay set 7nos. 6. Dismantling of 6”/4” dia pipe pole 5nos. 7. 8. Transporting of poles Disconnection of conductor jumper on poles Dismantling of 3.3 KVOH line and one no.Idle rail pole Sl.No. Particulars. 1. Dismantling of ACSR Dog conductor 2. Dismantling of earth wire 3. Dismantling of disc insulator 4. Dismantling of HT pin insulator 5. Dismantling of iron materials 6. Dismantling of stay sets 7. Dismantling of rail pole 90 Lbs. 8. Dismantling of 6 “ diia pipe poles 9. Disconnection of conductor jumper on pole 10. Transporting of pole 5nos. 3nos. Qty. 150m 50m 6nos. 3nos. 160kg. 3nos. 1no. 2nos. 3nos. 3nos. Rate Amount. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 1) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 . (2) Dismantling of 6.6KV OH line Benedih feeder for clear the area to advancing out sourcing face near Box cutII,BOCP Mine. Dismantling f 6.6 KV OH line and two nos. Idle poles Sl.No. Particulars. Qty. Rate Amount. 1. Dismantling of ACSR Dog conductor 360m 2. Dismantling of earth wire 120m 3. Dismantling of disc insulator 12 nos. 4. Dismantling of iron materials 160kg. 5. Dismantling of stay set 5nos. 6. Disconnection o f conductor jumper 6nos. 7. 8. Dismantling of 6 “ dia pipe pole Transportation of poles 4nos. 4nos. BILL OF QUANTITY.(SL.NO 2) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Dismantling transporting of Boiler of F/B to I.T. face (II) Dismantling of 8” dia pipe Box cut-II lower bench for HEMM activities at BOCP Mine. Sl.No. Particulars. Qty. Rate Amount. 1. Requirement of DA+ Oxygen 2nos. 2. Labour Charge LS 3. Dismantling of 8 “ dia pipe 340ft. 4. Transporting of8 “ dia pipe 340ft. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 3) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Failed 2000 GPM pump withdrawal and transportation from I.T. patch to RRWS (II) Shifting of 4000 GPM pump lower bench of I.T. patch(III) Dismantling and re- installation of tanker filling point (IV) Installation of 8”/8” 2000 GPM pump at coal face ,BOCP Mine. Failed 2000GPM pump withdrawl Sl.No. Particulars. Qty. Rate Amount. 1. Dismantling of 8 “dia suction and delivery 160ft. 2. Dismantling of 8” dia SV, NRV, Foot valve bend 6nos. 3. Withdrawal of pump set 1no. 4. Transportation of pump set from I.T. patch to RRWS. 1set Shifting of 4000 GPM Pump Sl.No. Particulars. 1. Dismantling of 10”dia Hose pipe and metal pipe ,suction 2. Dismantling of8” dia delivery pipe 3. Dismantling of8 “ dia SV,NRV and foot valve bend 4. Dismantling and re-installation of tanker point 5. Placement of pump set on sleeper 6. Alignment of pump at bed plate 7. Laying and jointing of 10:” dia suction 8. Laying and jointing of 8 “ dia delivery pipe 9. Fitting of SV,NRV,Foot Valve ,bend 10. Matching of suction and delivery 11. Re-laying of armored cable 12. Priming of pump Qty. 30ft. 140ft. 7nos. 1no. 1set 1set 25ft. 260ft. 8nos. 1no. 30m 1time Rate Amount. Installation of 8”/8” 2000 GPM Pump Sl.No. Particulars. 1. Dismantling of 8 “ dia suction and delivery 2. Dismantling of 8 “ dia foot valve ,NRV,SV and bend 3. Placement of pump on sleeper 4. Alignment of pump motor 5. Laying and jointing of 8 “ dia suction & delivery 6. Fitting of SV,NRV and foot valve and bend 7. Matching of suction and delivery 8. Re-laying of armored cable 9. Operation and maintenance of pump Qty. 140ft. 7nos. 1no. 1no. 220ft. 8nos. 1no. 50m 100Hrs. Rate Amount. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 4) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Shifting of 8”/8” dia centrifugal pump at coal face (II)Fabrication and installation of tanker filling point near Box cut-II Fire Zone (III) Shifting of 4000GPM pump centrifugal pump at I.T. patch ,BOCP Mine. Shifting of 8” /8” centrifugal pump Sl.No. Particulars. Qty. Rate Amount. 1. Dismantling of suction and delivery 100ft. 2. Dismantling of SV, NRV, Foot valve bend etc. 6nos. 3. Transporting of 8 “ dia pipe from pumping challa to coal 140ft. face 4. Placement of pump on sleeper 1no. 5. Alignment of pump motor with coupling 1no. 6. Laying and jointing of 8” dia suction and delivery 240ft. 7. Fitting of SV,NRV,Foot Valve and bend ,nipple etc. 7nos. 8. Matching of suction and delivery 1no. 9. Re- laying of armored cable 50m Fabrication and installation of tanker point Sl.No. Particulars. 1. Cutting of 8 “ dia pipe 2. Cutting of 6 “ dia pipe 3. Cutting of 4” dia pipe 4. Welding of 8” dia flange 4x25” Welding of 6 “dia flange 3x19” Welding of4 “ dia flange2x13 “ 5. Installation of fabricated tanker point 4000 GPM pump Sl.No. Particulars. 1. Dismantling of 10 “ dia suction pipe 2. Dismantling of10” dia foot valve ,bend, nipple 3. Dismantling of 8 “ dia delivery pipe 4. Dismantling of pump motor 5. Placement of pump motor on sleeper 6. Alignment of pump motor on base plate 7. Transporting of 8 “ dia pipe 8. Laying and jointing of 8 “ dia delivery 9. Fitting of SV,NRV, bend, nipple 10. Fitting of 10 “dia foot valve ,bend nipple 11. Laying and jointing of 10 “ dia Hose pipe and metal pipe Qty. 100” 57” 26” 183 “ Rate Amount. Rate Amount. 1no. Qty. 30ft. 3nos. 340ft. 1no. 1no. 1no. 460ft. 400ft. 5nos. 3nos. 30ft. 12. 13. for suction . Matching of suction and delivery Re-laying of armored cable 1no. 40m Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 5) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Diversion of pipe line 8” dia and shifting of pumps 2000 GPM,4000GPM and 6000 GPM at I.T. patch ,BOCP Mine. Sl.No. Particulars. Qty. Rate Amount. 1. Dismasntlingof8” dia delivery line with bend 240ft. 2. Placement of pump on sleeper 1set 3. Laying and jointing of 8”dia suction and delivery with 270ft. bend nipple 4. Fitting of SV, NRV, foot valve 3nos. 5. Matching of suction and delivery 1no. 6. Laying of armored cable 30m 7. Priming of pump 1 time 8. Dismantling and re-installation of tanker filling point 1set (8”/6”) with matching of delivery . 9. Suction extension of4000 GPM & 6000 GPM pump at I.T. 4nos. patch for 2 time x2 nos. pumps . 10. Transporting of 4000 GPM pump dala from I.T. patch to 1no. RRWS 11. Replacement of 10 “/8” dia pipe line with matching 2 end. 4000 GPM Ist pump Sl.No. Particulars. 1. Dismantling of 8 “ dia delivery pipe with bend nipple 2. Dismantling of 12 “ dia suction pipe 3. Placement ofpump 4. Alignment of pump motor 5. Laying and jointing of 8 “ dia delivery 6. Fitting of SV, NRV, Foot valve, bend 7. Laying f 12 “ dia suction 8. Matching of suction and delivery 9. Shifting of starter 10. Laying of cable Qty. 150ft 30ft. 1no. 1set 230ft. 5nos. 20ft. 1no. 1no. 25m Rate Amount. 4000 GPM 2nd pump Sl.No. Particulars. 1. Dismantling of8 “ dia delivery pipe 2. Dismantling of 12 “dia suction pipe 3. Placement of pump 4. Alignment of pump motor 5. Laying and jointing of 8 “ dia pipe Qty. 100ft. 30ft. 1set 1set 100ft. Rate Amount. 6. 7. 8. 9. Fitting of SV,NRV, Foot valve &bend Laying of 12 “ dia suction Matching ofsuction delivery Laying of cable 5nos. 30ft. 1no. 30m Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 5) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 6000 GPM Pump Sl.No. Particulars. 1. Dismantling of 10”dia pipe 2. Dismantling of12” dia suction pipe 3. Placement ofpump 4. Alignment of pump motor 5. Laying of 10”dia delivery pipe 6. Fitting of SV,NRV,Foot valve etc. 7. Laying of 12” dia suction 8. Matching of suction and delivery 9. Laying of armored cable 10. Priming of pump Dated : 31.1.2015 Qty. 100ft. 30ft. 1set 1set 100ft. 5nos. 30ft. 1no. 30m 1time Rate Amount. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 6) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Repairing and maintenance of HT/LT OH line and B/D attending and cable work for power supply and light fittings at different place at JOCP. Sl.No. Particulars. Qty. Rate Amount. 1. Disconnection of conductor jumper for HT /LT 69nos. lighting OH line 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Conductor jump ring for Ht/LT OH line during fault rectification Withdrawal of light set at different places Fitting of light set at different places Dismantling of 6/4” dia pipe pole Re-erection of 6/4”dia pipe pole Dismantling of iron materials Erection of iron materials Dismantling of disc insulator Dismantling of pin insulator Fitting of disc insulator Fitting of pin insulator Repairing of stay set Re-erection of conductor Fitting, lowering & cable handling PVC armored cable Disconnection of cable lead jump ring and re-jump[ ring during B/D rectification and cable shifting for power supply 69nos. 38nos. 38nos. 3nos. 3nos. 205kg. 205kg 12 nos. 15nos 12 nos. 15nos. 24nos. 900m 105m 27nos. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 7) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Dismantling of pontoon on 4000 GPM pump 6.6 KV motor along with delivery and suction at JOCP. Sl.No. Particulars. Qty. Rate Amount. 1. Dismantling of Box pontoon with balancer and 1set loading ,unloading from coal face to V point ,JOCP 2. 3. 4. 5. 6. Dismantling of 10” dia MS pipe suction and delivery Loading and unloading of 10 “dia MS pipe Dismantling of NRV, Foot valve and sluice valve etc. Loading and unloading of pump motor from coal face to RRWS Cable handling of 6.6 KV grade 815ft. 815ft. 3nos. 1set 78m Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 8) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Shifting of II nd 2000 GPM pump motor set on drum pontoon along with re-erection of delivery and suction at coal face. JOCP. Sl.No. Particulars. Qty. Rate Amount. 1. 1set Transporting of drum pontoon with four balancer Assembling of drum pontoon Installation of pump, motor 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Dismantling of8” dia MS pipe Dismantling of 6 “ dia MS pipe Transporting of 8” dia MS pipe Transporting of 6 “ dia MS pipe Erection of 8 “ dia MS pipe Erection of 6 “ dia MS pipe Cutting of pipe nipple taper etc Welding of flange nipple taper etc. Transporting of pump motor set 2000 GPM A) Dismantling of casing of 4000 GPM pump B) Dismantling of rotating part C)Fitting of Impeller and replacement of bearing D) Assembling of complete rotating unit inside the casing and fitting of the casing Cable handling of 6.6 KV grade 400ft. 460ft. 400ft. 460ft. 380ft. 440ft. 912” 912 “ 1set 1 set. 65m Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 9) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Erection of lighting OH line and light fitting at different places for illumination of Haul road and OB dump and face /Mine lighting of BOCP Mine. Sl.No. Particulars. Qty. Rate Amount. 1. 10 nos. Erection of 6”/4” dia pipe pole 2. Transporting of poles 10nos. 3. Erection of iron materials 480kg. 4. Providing & erection of clamp /nut ,bolt etc. 48kg 5. Providing and erection of shackle insulator (LT) 16nos. 6. Providing and erection of pin insulator (LT) 10 nos. 7. Dismantling ff6”/4” dia pipe pole(Idle pole for different 6nos. places for pole use the above OH line 8. Conductor jump ring of OH line 8nos. 9. Erection of stay set 5nos. 10. Providing &erection of cradle guard 80m 11. Drawing of ACSR (rabbit) conductor 850m 12. Fitting of light set(HV,SV lamp) at different places 21 nos. Chief Manager (E&M) Block-II Area. BILL OF QUANTITY.(SL.NO 10) Ref. No. GM/BII/(E&M)/TENDER/14-15/ 31/3436 Dated : 31.1.2015 Fixing of new pick holder and picks with crusher drum f feeder breaker No.1 with materials and labour cost at ist feeder Breaker of JOCP. Sl.No. Particulars. Qty. Rate Amount. 1. Old worn out pick holders to be removed by gas 55nos. cutting or gauging electrodes surface preparation before fixing the new pick holders with the crusher drum by the combination of suitable electrodes welding etc.(Picks holders and picks will be provided by department ) Chief Manager (E&M) Block-II Area.
© Copyright 2024