COMPUTOS METRICOS PROYECTO: CONSTRUCCIÓN TINGLADO U.E. HUACUYO B COMUNIDAD: HUACUYO ITEM NRO 1 UNIDAD LARGO ANCHO ALTO ÁREA VOLUMEN 1.00 1.00 2 1.50 1.50 3.78 3.78 8.00 8.00 30.24 30.24 TOTAL 60.48 1.80 1.80 1.30 1.30 0.05 0.05 0.12 0.12 8.00 8.00 0.94 0.94 TOTAL 1.87 6.05 6.05 TOTAL 12.10 4.54 2.38 TOTAL 6.91 24.19 24.19 -3.46 TOTAL 44.93 8.00 TOTAL 8.00 424.45 -80.00 424.45 -80.00 TOTAL 688.90 80.00 80.00 TOTAL 160.00 0.60 0.60 1.40 1.40 0.30 0.30 0.76 0.76 ESTRUCTURA METALICA PERFIL C 100*50*20*2 (PORTICO) 1.80 1.80 0.60 0.30 0.30 3.15 1.65 0.57 0.30 12 1.40 1.40 0.30 1.20 1.20 -1.20 3.02 3.02 -0.22 8.00 8.00 16.00 8.00 M2 CUBIERTA C.G. TRAPEZOIDAL Nº 28 PREPINTADO 33.16 -10.00 33.16 -10.00 12.80 1.60 12.80 1.60 424.45 -16.00 424.45 -16.00 1.00 5.00 1.00 5.00 M2 CUBIERTA C.PLAST. TRAPEZOIDAL.Nº 12 10.00 10.00 1.60 1.60 16.00 16.00 5.00 5.00 M CUMBRERA DE CALAMINA GALVANIZADA PLANA N°28 33.16 1.00 33.16 TOTAL 33.16 33.16 33.16 1.00 1.00 33.16 33.16 TOTAL 66.32 23.84 20.20 TOTAL 44.04 M CANALETA DE CALAMINA GALVANIZADA PLANA N°28 EJE 1 EJE 2 13 8.00 8.00 PZA cubierta plastica lado izuierdo cubierta plastica lado derecho 11 8.00 8.00 M3 RELLENO Y COMPACTADO CON MATERIAL COMUN lado izquierdo cubierta plastica lado izuierdo lado derecho cubierta plastica lado derecho 10 1.00 1.40 1.40 1.00 9 1.00 TOTAL M3 COLUMNAS DE HORMIGON ARMADO EJE 1 EJE 2 MENOS COLUMNAS 8 1.00 1.80 1.80 1.80 1.80 EJE 1 EJE 2 7 1.00 M3 ZAPATAS DE HORMIGON ARMADO EJE 1 EJE 2 6 1.00 TOTAL M3 HORMIGON POBRE DE NIVELACION EJE 1 EJE 2 5 TOTAL M3 EXCAVACION (0-2 M.) S. SEMIDURO EJE 1 EJE 2 4 PARCIAL GLB REPLANTEO Y TRAZADO 1.00 3 Nº VECES GLB INSTALACION DE FAENAS M BAJANTE CALAMINA GALVANIZADA PLANA N°28 EJE 1 EJE 2 5.96 5.05 14 LIMPIEZA GENERAL DE LA OBRA GLB 15 PLACA DE ENTREGA DE OBRAS PZA 4.00 4.00 1.00 1.00 1.00 TOTAL 1.00 1.00 1.00 1.00 TOTAL 1.00
© Copyright 2024