Leeds: roadworks, road closures and special events (pdf)

ROAD WORKS, CLOSURES
AND SPECIAL EVENTS IN
LEEDS DISTRICT
From:
05 February 2015
To:
15 February 2015
Issued by Metro
West Yorkshire Combined Authority
Wellington House
40 - 50 Wellington Street
LEEDS
LS1 2DE
Tel. 0113-251 7299
ROAD CLOSURES & SPECIAL EVENTS IN LEEDS DISTRICT
Date of Issue: 5 February 2015
SECTION OF
EVENT and DIVERSION
DATES OF
BUS
ROUTE
WORK
OPERATOR
Town Street
Armley
Bridge Road
Boston Spa
Resurfacing works
Buses will divert as follows:
5 from Crab Lane via Wesley Road,
Tong Road and Whingate to
Whingate Road to resume normal
route and vice versa;
16 16A from Hall Lane via Wesley
Road, Tong Road and Whingate to
Hill Top Road to resume normal route
and vice versa;
38 from Cockshott Lane via
Stanningley Road, Henconner Lane,
Green Hill Road and Hill Top Road to
Whingate to resume normal route and
vice versa;
86 from Hall Lane via Wesley Road,
Tong Road, Whingate, Hill Top Road
and Green Hill Road to Henconner
Lane to resume normal route and
vice versa.
Bridge Works
Transdev will divert via Moor End,
A168 before re-joining its usual route
on Walton Road.
Transdev will still access all stops on
High Street, Boston Spa before
turning and continuing on its usual
route.
As such stops on The Village,
Dowkell Lane, Walton Road (at HMP
Wealstun Prison), Wetherby Road,
Walton Road will be missed.
Broadlea Hill
Bramley
Resurfacing
Buses will operate via Broad Lane
Sundays 1
and 8
February
First
5 16 16A 38 86
Saturday 14
Transdev
– Sunday 15 770 771
February &
Saturday 21
– Sunday 22
February &
Saturday 28
February –
Sunday 01
March.
Works will
start at 0800
on the
Saturday and
continue until
1800 Sunday.
Weekend
Works Only
Monday 16 – First
Friday 20 and 49
Monday 23 –
Friday 27
February
0930 – 1530
each day
Halton Moor Ave
Halton
Resurfacing Works
During this closure, First services 5 &
91 will divert from Neville Parade via
(R) Halton Moor Avenue and Halton
Moor Road back onto route at
Osmondthorpe Lane.
Monday 2
February –
Friday 13
February,
0930 – 1530
Weekday
Works
First
5 91
Monday 19
January –
Monday 9
February
Off peak
(0930 –
1530)
First
91
A shuttle service will be in operation
from 0930 until 1600:
Halton Moor Ullswater Crescent stop
24987: 0930 0950 1010 then 30 50
10 until 1550
Selby Road Wykebeck Mount stop
10770: 0936 0956 1016 then
36 56 16 until 1556
Selby Road Dunhill Rise stop 12807:
0938 0958 1018 then 38 58 18 until 1558
Halton Moor Ullswater Crescent stop
24987: 0946 1006 1026 then 46 06 26
until 1606
Harehills Lane
Harehills
Resurfacing Works
Buses will divert via Harehills Ave.,
Chapeltown Road, and vice versa.
PLEASE NOTE
THESE WORKS
HAVE BEEN
BROUGHT
FORWARDS
New York Road
(westbound)
Leeds
Valley Road
Pudsey
Repairs to Woodhouse Tunnel
Diversion via Marsh Lane and York
Street to Leeds Bus Station
Resurfacing works
Buses will be diverted as follows
during the works
62A via Lowtown and Kent Road
711 via Lowtown
X14 via Lowtown and Robin Lane
Ongoing for
12 – 24
months
Tuesday 3
February
For up to six
weeks
0930 – 1530
Monday –
Friday only
Transdev
770 771
First
X14
Geldard’s
711
Yorkshire Tiger
62A
Junction 44
Roundabouts
Stourton
SECTION OF
ROUTE
Armley Road
Armley
Greenhill Road
Armley
Old Lane
Beeston
Town Street
Henconner Lane
Bramley
Harehills Lane at
Strathmore Drive
Harehills
Domestic Street
Holbeck
Broadway
New Road Side
Roundabout
Horsforth
Brownberrie Lane
Horsforth
Junction 44 Pinch Point Scheme
During this closure Arriva services
167 168 189 410 will divert via the
446 route: A639, Wakefield Road,
Wood Lane, Haigh Road and vice
versa.
Thursday 22 &
Friday 23 both
nights – 2000
– 0530
With the
closure
recommencing
Monday 9
February for
two weeks,
2000 – 0530
Arriva
167 168 189
410
ROAD WORKS IN LEEDS DISTRICT
Date of Issue: 05 Feb 2015
NATURE AND EFFECT OF WORK DATES OF
BUS
WORK
OPERATOR
Renew hydrant
Thursday 5 –
First
Controlled by temporary lights as
Wednesday 11 72 85 87 x6 x14
required
February
Geldard’s
X11
Yorkshire Tiger
62 62A
Cabling works
Monday 9 –
First
Controlled by temporary lights as
Saturday 14
16 16A
required
February
Footway and carriageway works
Monday 5
First
Controlled by temporary lights as
January –
64 74
required
Friday 27
February
Construction of cycleway
Saturday 1
First
Controlled by lane closures as
November
16 16A 49 85 86
required
2014 –
87 91
Thursday 31
Yorkshire Tiger
December
80
2015
Electrical Connections
Tuesday 3
First
Multiway signal.
February –
42 91
Saturday 17
February
New connection
Monday 9
First
Controlled by stop / go boards as
February –
55 64 74 86
required
Sunday 8
March
Signalisation and remodelling of the Ongoing until
First
roundabout
July 2015
9 33 33A x33
Controlled by lane closures as
Yorkshire Tiger
required
757
Traffic management works
Monday 5
First
Controlled by stop / go boards as
January –
97
required
Friday 13
February
Bridge Road
Kirkstall
Junction works
Controlled by temporary lights and
lane closures as required
Monday 19
January –
Monday 30
March
Boar Lane
at the jct with
Lower Basinghall
Street
Leeds City
Centre
Scotchman Lane
Morley
Gas works
Controlled by temporary lights as
required
Monday 2
February for
up to 4 weeks
Resurfacing
Controlled by temporary lights as
required
Removing vegetation
Controlled by temporary lights as
required
Monday 5 –
Friday 6
February
Tuesday 10
February
0930 – 1530
Chapeltown
at jct with
Uppermoor and
Greenside
Pudsey
Lowtown
Pudsey
Construction of pedestrian refuge
Controlled by temporary lights as
required
Monday 2 –
Friday 13
February
Gas works
Controlled by temporary lights as
required
Monday 19
January –
Friday 20
February
Larkfield Road
Rawdon
Gas works
Controlled by temporary lights as
required
Gas works
Controlled by temporary lights as
required
Signalisation and remodelling of the
roundabout
Controlled by lane closures as
required
Saturday 14 –
Monday 16
February
Tuesday 17 –
Wednesday 25
February
Ongoing until
July 2015
Town Street
Stanningley
Construction of cycle superhighway
Lane closure along the whole road
as required
Thornbury
Roundabout
Thornbury
Highway reconstruction works
Controlled by lane closures and
temporary lights as required.
Monday 1
December –
Thursday 31
December
2015
Ongoing
Bradford Road
Otley
Town Street
Rawdon
Rodley Lane
Horsforth New
Road
Roundabout
Rodley
Delays likely.
First
38 49 91 508
670 671
Transdev
Keighley
760
Arriva
First
Yorkshire Tiger
Arriva
221
First
33A
Harrogate
Coach Travel
962 x53
TLC 967
First
4 4A 611 x14
Geldard’s
X11
First
4 4A 9 90 x14
Geldard’s
711
Yorkshire Tiger
62
First
97
First
97
First
9 670 671
Harrogate
Coach
8 8A
Transdev
Keighley
760
First
9 14 16 16A 72
91
First
72 508 611 x6
Geldard’s
711