1ST PAGE

REPUBLIC OF THE PHILIPPINES
THE SITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
9.22
0 m.
NEGROS OCCIDENTAL 4TH DISTRICT ENGINEERING OFFICE
BAGO CITY, NEGROS OCCIDENTAL
T
PUNTA TAYTAY BRIDGE
I
10.4
70 m
WIDENING OF NATIONAL ARTERIAL ROADS
.
TALOC
A
S00155NR - BACOLOD SOUTH BY-PASS ROAD
10.7
K0022 + 178.00 to K0022 + 348.00, L = 170.00 l.m.
K0022 + 626.00 to K0023 + 057.00, L = 438.00 l.m.
CONCRETING = 300mm
NET LENGTH = 608.00 ln.m.
75 m
.
TABUNAN
TALOC BRIDGE
FOOT BRIDGE 2
R
CALUMANGAN
CALUMANGAN BRIDGE
BAGO CITY
TAPONG
POBLACION
SAMPINIT
DULAO
SIBUD BRIDGE
10.9
95 m
.
CULO
PAG-AYON
9.73
TO
9.72
5 m.
ATIPULUAN BRIDGE
5.25
0m
UBAY
.
IN
G
IN
L
A
MALINGIN
PATIC
ER
P
RO
P
GO
MABINI
PALAKA NORTE
HINALU-AN BRIDGE
18
GA
ST SOL
AT IN
IO E
N
MA-AO
QUEZON BRIDGE
S
B
BAGROY
MARAGANDANG BRIDGE
PALAKA SUR
CARIDAD
5.31
0m
.
ALIANZA
E
CO XIS
NC TIN
RE G
TE
SAGASA
A
00
PATIC BRIDGE
UTOD
Y
+1
ATIPULUAN
CR. PULUPANDAN
.M
TO
ABUANAN
BAGO BRIDGE
NAPOLES
BEG. OF PROJECT (widening)
K0022 + 178.00 (S00155NR)
G
R
5 m.
14
BALINGASAG
LAG-ASAN
BA
C
CI OL
TY O
D
9.57
CANJUSA
PULUPANDAN
5 m.
BUSAY
HIMUANG BRIDGE
LACARON
PALOMA
A
OB
END OF PROJECT (widening)
K0022 + 348.00 (S00155NR)
T
AYUNGON
VALLADOLID
2.68
5 m.
BAYABAS
V I C I N I T Y
5.41
0m
MA-AO CENTRAL
M A P
.
E
CO XIS
NC TIN
RE G
TE
2.55
4 m.
INDEX OF SHEETS
5.35
8 m.
+3
00
8.68
5 m.
1
-
VICINITY MAP, LAY OUT PLAN, AND INDEX OF SHEETS.
2
-
TYPICAL ROADWAY SECTION 1, 2, SUMMARY OF QUANTITIES
3
-
DETAILED OF THERMOPLASTIC RUMBLE STRIPS AND PEDESTRIAN
LANE, PLAN-0.30 m. THICK, and DETAIL OF DOWELS and TIE
BARS and PART LANE CLOSURE DETAIL
4
-
GENERAL NOTES and SPECIFICATIONS
5
-
APPROACH SLAB DETAIL
6 - 7
-
PLAN AND PROFILE
2.58
5 m.
+4
00
8.65
0 m.
2.38
5
B
BR AG
ID O
GE
m.
BEG. OF PROJECT (widening)
K0022 + 626.00 (S00155NR)
+5
0
0
8 - 10 -
8.85
0 m.
CROSS-SECTION
2.08
5 m.
+6
0
0
8.78
5
0.08
m.
LEGEND :
9.13
0 m.
E
CO XIS
NC TIN
RE G
TE
5 m.
+7
0
PROPOSED WIDENING BOTHSIDES (PCCP)
0
PROPOSED RIPRAP & GROUTED RIPRAP
8.58
5 m.
EXISTING PCCP/WIDENING
9.41
0 m.
EXISTING RIPRAP
+8
89
4.
50
00
K0
02
2+
E
CO XIS
NC TIN
RE G
TE
-A
.M
A
+9
7
GY
END OF PROJECT (widening)
K0023 + 057.00 (S00155NR)
BR
TO
40 m
7.
40
EN
10.8
K0
0
TR
-2
AN
CE
00
22
EX
I
T
0 m.
+9
GE
8
O
9.34
D
OF PWH
FI
CE
.
W6
-1P
23
+0
0
0
W2
-1
KM
PO
23 ST
G2
-1
DA
N
TO
PA
N
LL
PU
LU
LAY - OUT PLAN
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
NEGROS OCCIDENTAL 4TH DISTRICT ENGINEERING
OFFICE
BAGO CITY, NEGROS OCCIDENTAL
PROJECT TITLE & LOCATION:
WIDENING OF NATIONAL ROADS
S00155NR BACOLOD SOUTH BY-PASS NATIONAL ARTERIAL ROAD
K0022 + 178.00 to K0022 + 348.00
K0022 + 626.00 to K0023 + 057
BAGO CITY, NEGROS OCCIDENTAL
NET LENGTH = 608.00 ln.m.
SHEET CONTENTS :
1
:
2,000 m
SURVEYED : NOLI C. ALVAREZ
AD
OL
ID
TO
SCALE
VA
CHECKED :
SUBMITTED :
RECOMMENDING APPROVAL :
APPROVED :
SET NO.
SHEET NO.
INSTRUMENTMAN
LAY-OUT PLAN, INDEX OF SHEETS, VICINITY MAP
SUMMARY OF QUANTITIES
DRAWN/CAD : MARLON A. SECUELAN
DESIGNED :
DOMINGO M. SASOTA JR.
ENGINEER II
MARIO T. MULETA
BALTAZAR D. JAVA JR.
GENARO M. PANGANIBAN
NOEL L. PINEDA
ENGINEER II
ENGINEER III
OIC - ASSISTANT DISTRICT ENGINEER
OIC - DISTRICT ENGINEER
1
10
widening_bacolod_south_road_2015