THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 WEEKLY PLAN LIST - Friday, January 30, 2015 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date 1/30/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 131 2:00 PM DUBLIN SANTA RITA JAIL (SRJ) CONDENSER WATER SYSTEM UPGRADE 2 The Work of this Contract consists of replacing all condenser water system equipment that serves a chilled water plant located in the Santa Rita Jail chiller refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the demolition and installation of two 800-ton cooling towers, two condenser water pumps and pump motors equipped with new variable frequency drives, central plant water softener, the installation of a new water filtration system, the installation of a chemical treatment system, and all ancillary equipment and controls. 442 2:00 PM ROCKLIN ZONE 1 WELL UPGRADE AND EXPANSION PROJECT (ONLINE ONLY) Div 1-11, 13 & 15-17. The Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of Improvements to Sunset Well, including well liner, casing and screen, submersible pump, valves piping, appurtenances, chemical feed facilities, building site work, etc. The Project also includes improvements to the Tinker Road well including a new vertical turbine pump, valves, piping and appurtenances, well house, tank mixer, site work and all other associated work described in these documents. Additionally, due to urgent water supply needs of the Agency, the Contractor will be required to provide temporary power, pumping, disinfection, and piping facilities to provide access water from both wells. Project is available for viewing ONLINE ONLY!!! Page 1 of 31 Planroom & Online Online Bid Date 1/30/2015 Plan # Bid Time Location 45 2:00 PM PLEASANTO N # of Addenda Plans Plan Name CSI Divisions / Job Description BERNAL COMMUNITY PARK PHASE 2 The construction of a community park and Oak Woodland area, all within the vacant 4 land directly across from the Alameda County Fairground generally bounded within Bernal Avenue, Oak Vista Way, Valley Ave and the SPRR track. Park features three synthetic multi-purpose fields, turf areas, group picnic areas, area for future children's play equipment, drinking fountains, two-lane access road, parking lot, concrete walkways, decomposed granite paving, concrete site walls, concrete steps, grandstand, granite pavers, granite benches, shade structures, aluminum bleachers, chain link fencing and gates, sports lighting pathway lighting, premanufactured restroom, storage building, and trash enclosure, site furniture, signage, planting, site grading and drainage. Synthetic field turf will be supplied by the City and installed and warranted by a City selected vendor. Bidder will coordinate installation with the city. The Oak Woodland area includes asphalt and decomposed granite walkways, concrete paving concrete split rail fencing, boulders, granite benches, site furniture, boardwalk, planting, site grading, drainage and signage. Page 2 of 31 Planroom & Online Bid Date 1/30/2015 Plan # Bid Time Location 89-92 2:00 PM IONE Plan Name CSI Divisions / Job Description # of Addenda Plans HEALTH CARE FACILITY IMPROVEMENT Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 7 PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at MCSP is to remedy deficiencies in its existing health care components. The Project consists of five sub-projects, which includes one to three sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, renovation, building pad preparation, accessible paths of-travel and infrastructure upgrades. The Projects are located within the existing secure perimeter. The new buildings and additions will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new buildings, including communication/signal, electrical, storm drain, water, and sewer lines. All existing buildings are sprinklered with the exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic sprinkler systems will be installed for I-3 and B occupancy in new buildings in accordance with the requirements of the California Building Code. Paving and resurfacing work includes, but is not limited to, the following: new sidewalks and asphalt at accessible parking stalls, new concrete and asphalt at the new buildings, all sidewalks, and path-of-travel. The sub-projects are as follows: SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq. ft. of the existing Central Health Services Building will be renovated to provide appropriately sized Triage and Treatment Area (TTA), specialty care and clinical spaces. The renovated TT A will include two standard bays, one urgent bay, an observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility rooms and additional inmate-patient holding rooms. SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C; and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards A, B, and C will be reconfigured, renovated, and expanded into the adjacent clothing exchange areas, and new buildings at each yard will be constructed for clothing exchanges. The renovated clinics will include primary care exam rooms, multi use exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic support space. Three new stand-alone pre-engineered buildings will be constructed to replace the three existing clothing distribution facilities being vacated to allow the expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft. at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq. ft. each. SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health Page 3 of 31 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care exam rooms, one dental operatory, mental health clinician treatment rooms, clean and soiled utility rooms and clinic support spaces. The area of new construction is approximately 6,111 sq. ft. SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy and Laboratory Building will be constructed central to Yards A, B, and C, and the Central Health Services Building. It will include a shipping, receiving, and manifesting area, an order entry area, an authorization/verification area, a dual filling station, an IV preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic station, and a laboratory. The area of new construction is approximately 2,471 sq. ft. SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program Space in the Prison Industry Authority Building at Facility A will be renovated for Health Care Administration services and will include office spaces, support spaces such as a copy room, break room, conference room and toilet rooms. The total area of renovation is approximately 8,098 sq. ft. 2/2/2015 419 1:00 PM CHICO AMERICAN WEST BANK - CHICO (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!! 1 Online 1 Online Project consists of interior wall demolition, drywall and metal stud framing, acoustical ceilings, painting, ceramic tile, carpeting, millwork, doors/frames/hardware, window coverings, mechanical, electrical, plumbing and some fire sprinkler work. Project is available for viewing ONLINE ONLY!!! 448 11:00 AM SACRAMENT O WALMART - SACRAMENTO STORE #2735-218 (ONLINE ONLY) Div 1-3, 5-11, 13 & 15-16. Project consists of limited remodel to an existing 195,250 sq. ft. building. SITE WORK TRADES NEEDED: Striping, Site Concrete & Truncated Dome replacement. BUILDING TRADES NEEDED: Demolition, Carpentry, Millwork, FRP, EIFS Repair, Caulking/Sealants, Doors, Metal Stud Framing, Drywall, Ceramic Tile, Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Fire Sprinklers, Plumbing, EMS and Electrical. Project is available for viewing ONLINE ONLY!!! Page 4 of 31 Bid Date 2/3/2015 Plan # Bid Time Location 120 2:00 PM SACRAMENT O Plan Name CSI Divisions / Job Description SEQUOIA HALL ORGANIC CHEMISTRY LAB REMODEL AT CSU SACRAMENTO Div 1-3, 5-12, 22-23, 26-27 & 32. Prevailing wages applied. In general, the work consists of the remodel of an Organic Chemistry Laboratory Classroom 538 and support spaces 538A, B and C on the fifth floor of the Sequoia Hall building. The remodel includes removal and replacement of flooring, ceilings, casework and mechanical and electrical systems. There will be limited work on the fourth floor of Sequoia to reroute new electrical and mechanical systems. The construction period for this project is 120 calendar days. # of Addenda Plans 2 Planroom & Online 2 Online 2 Planroom & Online A pre-bid walkthrough and conference will be held on January 6, 2015 at 10:00 a.m. The meeting will be held at Facilities Management. It is strongly recommended that both general contractors and subcontractors attend the walkthrough, as it will be the only time bidders can visit the site with the Design Architect. 438 2:00 PM SAN CARLOS EL CAMINO REAL LIGHTING AND LANDSCAPING - BUSH TO ARROYO (ONLINE ONLY) The Scope of Work generally includes planting 24 trees, 24 streetlights, new curb, gutter and sidewalk. Bids are required for the entire Work described herein, in accordance with the Instructions to Bidders. Project is available for viewing ONLINE ONLY!!! 86-87 2:00 PM SAN FRANCISCO MCKINLEY ELEMENTARY SCHOOL MODERNIZATION PROJECT Div 1-3, 5-12 & 15-16. General School Modernization and reconstruction including, but not limited to, ADA Access and Fire/Life-Safety upgrades, Painting, New Building Addition, Fire Alarm and Fire Sprinkler Modifications, Miscellaneous Site Work, Installation of Interim Housing, Hazardous Material Remediation and other Miscellaneous Interior Renovation Work. 437 3:00 PM PALO ALTO RECYCLED WATER PIPELINE MAINTENANCE AND REPAIR (ONLINE ONLY) The City of Palo Alto is seeking quotes from qualified contractors to maintain buried 1 mainline valves, buried blowoff valves, combination air valves, cathodic protection systems, and other miscellaneous systems. The Contractor is to provide on-call maintenance services. The required Work and required performance conditions are described in the Scope of Work. Online Project is available for viewing ONLINE ONLY!!! 2/4/2015 410 1:30 PM ALAMEDA ALAMEDA INTERCEPTOR REHABILITATION EBMUD (ONLINE ONLY) Div 1-3 & 31-33. Work includes rehabilitation of seventeen manholes, demolition and replacement of one manhole, slip lining of approximately 4,525 feet of pipe, CIPP of approximately 120 feet of pipe, and performance of related required work complete as shown on the Drawings and specified. The Work is located in Clement, Grand, and Buena Vista Avenues, and Constitution Way in the City of Alameda, California. Contact Pam Hopkins, Project Engineer, at (510) 287-1326 with any questions. Project is available for viewing ONLINE ONLY!!! Page 5 of 31 1 Online Bid Date 2/4/2015 Plan # Bid Time Location 435 1:30 PM SAN CARLOS Plan Name CSI Divisions / Job Description # of Addenda Plans FIRE STATION #16 SEISMIC UPGRADE PROJECT The Scope of Work generally includes seismic upgrade at the apparatus bay doors (ONLINE ONLY) of Fire Station #16, including removing and replacing wood siding, demolishing and replacing interior gypsom board, installing exterior and interior plywood sheathing, installing framing connections at shear wall and installing holdown posts. Bids are required for the entire work described herein in accordance with the Instructions to Bidders. 1 Online The Project work is generally described as Irrigation System Upgrades and includes 1 the installation of irrigation controller communication equipment, trenching, master valves and flow sensors as further described in the bid package. Online Project is available for viewing ONLINE ONLY!!! 478 10:00 AM DUBLIN NEW IRRIGATION SYSTEM UPGRADES (ONLINE ONLY) This Project is available for viewing ONLINE ONLY!!! 62-63 12:00 PM LARKSPUR NEIL CUMMINS ELEMENTARY SCHOOL MODERNIZATION & NEW CONSTRUCTION PHASE 2 Div 1-3, 5-10, 12, 22-23, 26-28 & 31-32. The Project generally consists of construction of one-story, Type VB classroom/restroom buildings approximately 8,100 sq. ft. in size on an existing elementary school campus, site improvement work including landscaping and site paving and roofing of existing classroom and library buildings. 449 2:30 PM SAN FRANCISCO ALAMO ELEMENTARY SAFE ROUTES TO SCHOOL PROJECT (ONLINE ONLY) 2 The Work to be done under this Contract consists of doing traffic routing, constructing medians with a pedestrian refuge, curb ramps, bulb-outs and drainage work on California St at 21st Ave, 22nd Ave and 24th Ave, constructing traffic speed humps between California St and Clement St on 22nd Ave and 23rd Ave in San Francisco, California, all as shown on the Drawings and as specified in these Specifications. Planroom & Online Online Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions. Project is available for viewing ONLINE ONLY!!! 132 3:00 PM MONTEREY NEW FED-EX OFFICE REMODEL PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! This is an open store remodel and all work must be performed between the hours of 9 PM and 6 AM. Please provide pricing accordingly and note in all proposals that this is included. All questions should be directed to: [email protected]. Page 6 of 31 Planroom & Online Bid Date 2/5/2015 Plan # Bid Time Location 454 10:00 AM MILL VALLEY # of Addenda Plans Plan Name CSI Divisions / Job Description CORNWALL PIPELINE REPLACEMENT PROJECT - MMWD (ONLINE ONLY) This Contract is for furnishing labor and equipment for the installation of 1450 feet of 8-inch and 6-inch welded steel pipe with valves, fittings and appurtenances. The Work to be done is located in Mill Valley within the County of Marin, California. Online Contact Jake Miller, Project Manager at (415) 945-1580 with any questions. Project is available for viewing ONLINE ONLY!!! 133 2:00 PM CORTE MADERA NEW IVIVVA ATHLETICA STORE #11107 TENANT IMPROVEMENT PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! 1 Planroom & Online See Specifications on the floor plans for complete Scope of Work. PLEASE NOTE: KDC Construction is NOT soliciting Roofing or Fire Sprinklers bids. The Owner has their own subcontractors for these two trades. Contact Kathy Arslan with any questions at (714) 632-6717, or by email at: [email protected] 153 2:00 PM HAYWARD LKQ PICK YOUR PART PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New Wood Frame Scale Building 828 sq. ft.; and Sitework. Contact Bob Alton, Project Estimator, with any questions at: [email protected] 27 2:00 PM SANTA CRUZ 14TH AND 16TH AVENUE PUMP STATION ABANDONMENT PROJECT Page 7 of 31 1 Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new sewer force main from the pump station to East Cliff Drive, install new sewer gravity lines using pilot tube microtunneling and trenching from the existing 14th and 16th Avenue pump stations to the 15th Avenue pump station and abandon and demolish these two pump stations. Work will take place within the public right of ways of 14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will also take place in Black Point Lane and within 5 private property easements in the area. Planroom & Online Bid Date 2/5/2015 Plan # Bid Time Location 403 2:00 PM LAFAYETTE Plan Name CSI Divisions / Job Description # of Addenda Plans LAFAYETTE TOWN CENTER PHASE III (ONLINE This is a NON-Prevailing Wage project. Contact Ben Honsvick, Project Estimator, ONLY) at (707) 559-2336 or by email at: [email protected] with any questions. 3 Online 2 Online 1 Online Project consists of the demolition to the existing single story unreinforced masonry 1 building in its entirety (approximately 5,000 sf +/-), including all interior building systems, associated site work according to the Plans and Specifications as prepared by Hanna & Brunetti Architects and according to the Contract Documents. Online Trades include concrete; concrete unit masonry; simulated stone; structural steel framing; cold-formed metal framing; metal fabrications; metal stairs; ornamental metal; rough carpentry; laminated veneer lumber; wood I-Joists; shop-fabricated wood trusses; glue-laminated construction; finish carpentry; self adhered underlayment and flashings; membrane (below grade) waterproofing; building insulation; concrete roofing tile; preformed exterior siding; built-up (cool roof) roofing; sheet metal; firestopping; caulking and sealants; hollow metal doors; wood doors and frames; fiberglass French glass doors; special doors; access doors; sectional overhead doors; aluminum storefront windows; fiberglass windows; finish hardware (pending); glass and glazing; louvers and vents; metal support systems; lath and plaster; gypsum wallboard; tile masonry; resilient flooring; carpet; painting; building specialties; bath accessories; mirrored wardrobe doors; kitchen and laundry equipment; site furnishings; elevators; trash chute; plumbing; HVAC; electrical; exterior improvements; and utilities (civil work). Project is available for viewing ONLINE ONLY!!! 417 2:00 PM SAN FRANCISCO SITE REMEDIATION AT 520 JOHN MUIR DRIVE (ONLINE ONLY) The Work mainly consists of excavating and removing and replacing soil. Major types of work include: grubbing, excavation, dirt import, grading, fence installation, wetland restoration and hydroseeding. Project is available for viewing ONLINE ONLY!!! 426 2:00 PM ALAMEDA COUNTY CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor (ONLINE ONLY) must have either a Class A License or one of the following Class C licenses: C-10, C-29. Project is available for viewing ONLINE ONLY!!! 432 2:00 PM GILROY 7350 ROSANNA PARKING IMPROVEMENT PHASE I DEMOLITION (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! Page 8 of 31 Bid Date 2/5/2015 Plan # Bid Time Location 444 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description # of Addenda Plans THE REHABILITATION OF SANITARY SEWERS IN THIS PROJECT IS A REBID!!! WEST GRAND AVE BETWEEN WOOD ST AND SAN PABLO AVE, AND IN 20TH ST BETWEEN The proposed Work consists, in general, of rehabilitating approximately 56 linear BROADWAY AND HARRISON ST - REBID feet of existing 30” diameter sewer pipes, approximately 3,085 linear feet of existing (ONLINE ONLY) 48” diameter sewer pipes and approximately 1,267 linear feet of existing 60” diameter sanitary sewer pipes by CIPP or FRMP method; rehabilitating approximately 1,072 linear feet of existing 60”x66” conduit sewer pipes and approximately 1,656 linear feet of existing 72”x78” conduit sewer pipes by CCFRPM method; rehabilitating approximately 340 linear feet of existing 3’x4’-10” conduit sewer pipes by Composite liner method; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house connections sewers, and other related works as indicated on the Plans and Specifications. Online This Project is available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 12/18/14. Old Plan #432) 468 2:00 PM SAN JOSE NEW SAN JOSE STATE UNIVERSITY CAMPUS VILLAGE PHASE 2 (ONLINE ONLY) Roebbelen Contracting is bidding on Bid Package 10-1 SPECIALTIES and bid package 32-1 SITE CONCRETE. Trades needed for the SPECIALTIES packete include: FRP, roof accessories, access doors, mirrors, overhead coiling doors and grilles, visual display surfaces, toilet compartments, wire mesh partitions, operable partitions, wall and door protection, toilet accessories, fire extinguishers and cabinets, bike lockers, appliances, projections screens, facility waste compactors, fabrics, window coverings, and facility chute. Trades needed for the SITE CONCRETE package include: site hard demolition, site furnishings, reinforcing, ready mix supply, and joint sealants. Bidders are to be aware that this is a Prevailing Wage Project and all subcontractors with onsite labor will have to enroll in the university’s OCIP (Owner Controlled Insurance Program). See division 0 and 1 for other administrative, schedule, jobsite logistics and other general requirements and information available to all bidders. Page 9 of 31 Online Bid Date 2/5/2015 Plan # Bid Time Location 480 2:00 PM Plan Name CSI Divisions / Job Description SANTA ROSA NEW SILVA AVENUE & KING STREET SEWER & WATER REPLACEMENT (ONLINE ONLY) # of Addenda Plans Project consists of Dust Control, Traffic Control, Existing Facilities, Earthwork Notification, Aggregate Base, Asphalt Concrete, Asphalt Concrete Trench Paving, Soil and Groundwater Disposal, Plastic Strom Drain Pipe, Reinforced Concrete Pipe, Sanitary Sewer System, Concrete Curbs and Sidewalks, Traffic Stripes and Pavement Markings, Pavement Markers, Water System, Material Recycling and Fees and Permits. Online Project is available for viewing ONLINE ONLY!!! 484 2:00 PM SAN FRANCISCO YERBA BUENA RECONFIGURE OFFICES (ONLINE ONLY) Project includes material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet and bath accessories, window treatments, manufactured casework, solid surface countertops, plumbing, HVAC, electrical, public address and fire alarm. Project is available for viewing ONLINE ONLY!!! Page 10 of 31 Online Bid Date 2/5/2015 Plan # Bid Time Location 486 2:00 PM ELK GROVE Plan Name CSI Divisions / Job Description # of Addenda Plans 5 FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet. Additionally, operational flexibility will be increased through the addition of berms in ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed to allow flow into each of the basins and drainage from each of the basins. Basin floors will be lined with roller compacted concrete (RCC) and basin berms will be lined with shotcrete. An underdrain system and associated pumping station will be constructed to relieve hydrostatic pressure from the groundwater beneath the basins. A permanent washdown system consisting of both manual and motorized water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed as part of this Project. There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM, Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Kathy Martin at: [email protected] with attendee names prior to the meeting. A general engineering contractor, Class A License is required as well as prequalification for the general contractors, roller compacted concrete subcontractors, electrical subcontractors, and instrumentation and control subcontractors. Additional project information and the prequalification list for the trades listed above can be found at: www.regionalsan.com/business-opportunities Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at: [email protected]. Project is available for viewing ONLINE ONLY!!! Page 11 of 31 Online Bid Date 2/5/2015 Plan # Bid Time Location 452 3:00 PM STOCKTON # of Addenda Plans Plan Name CSI Divisions / Job Description 700 YARD TRACK IMPROVEMENTS PROJECT (ONLINE ONLY) Div 1-2 & 31-34. The Project consists of approximately 24,700 track feet of new track and turnouts, grading, storm drainage facilities, access roads and associated demolition to support the new tracks Online The new construction will consist of modifications to existing tracks as well as the addition of two lead tracks, A and D, and 9 new yard tracks. All of the work will be located to the north of the existing 700 Yard tracks. A gravel access road will encompass the perimeter of the yard, at-grade crossings will consist of precast concrete panels and paved asphalt approaches. Existing utilities will be encased. Grading and drainage will consist of a network of solid storm drain lines and perforated underdrain piping. The piping will channel the water to a number of new storm drain structures that will drain into several existing storm drain trunk lines and outfall to an existing drainage canal. Several sections of these existing trunk lines will be replaced to accommodate the new track construction. This project will conform to the latest version of City of Stockton, Caltrans, UPRR, and AREMA Standards and Specifications. Project is available for viewing ONLINE ONLY!!! 69 3:00 PM SANTA CRUZ 481 4:00 PM SALINAS CENTRAL HEATING PLANT FACKLER COGENERATION-EMERGENCY GENERATOR REPLACEMENT AT UC SANTA CRUZ NEW FOREVER 21 - SALINAS (ONLINE ONLY) Project is to install (2) new 150kW generators. Construction of Fackler Genset Replacement includes demolition of existing diesel generator and gas compressor, install of (2) new generators with propane back up and replacing (2) VFD’s. Planroom & Online Project consists of Saw Cutting and Pour Back, Structural Steel, Finish Carpentry, Fixture Installation, Drywall, Paint, Flooring, Storefront Glazing, Mirrors, Doors, Plumbing, HVAC, Electrical, Signage Installation, Final Clean, Fire Alarm and Fire Sprinkler. Online Project is available for viewing ONLINE ONLY!!! Page 12 of 31 Bid Date 2/6/2015 Plan # Bid Time Location 439 2:00 PM SANTA ROSA Plan Name CSI Divisions / Job Description # of Addenda Plans BAILEY FIELD AND HAEHL PAVILION The following description summarizes the Scope of Work and is not intended to limit TRANSFORMER SWITCHGEAR REPLACEMENT or totally define all actions required under this Contract. Work of the Project AT SANTA ROSA JR COLLEGE (ONLINE ONLY) includes: Online 1. Demolition of (2) existing medium voltage selector switches including their associated fabricated metal bases. 2. Demolition and replacement of two (2) existing medium voltage substation transformers with (2) oil filled pad mount loop feed transformers. 3. Replacement of existing medium voltage cabling between the Bertolini Student Center and Forsyth Hall and related electrical and site work. 4. Preventive Maintenance and Testing of the existing 12 kV main service and distribution switchgear, switching equipment, and distribution transformers throughout the campus. 5. Provisions of temporary backup power generators for Burbank Auditorium and the Zumwalt Parking Pavilion during the scheduled periods of power outage. Project is available for viewing ONLINE ONLY!!! 441 2:00 PM SAN FRANCISCO JOHN ADAMS CENTER ROOF REPLACEMENT FOR CCSF (ONLINE ONLY) Div 1-2, 5 & 7. Project consists of replacement of existing roofing at Gym Building; Patching existing roof leaks and blisters where indicated at Main Building; Installation of roof access ladders and safety cages; and other miscellaneous work as indicated. Project is available for viewing ONLINE ONLY!!! Page 13 of 31 Online Bid Date 2/6/2015 Plan # Bid Time Location 460 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description # of Addenda Plans NEW UCSF BENIOFF CHILDREN'S HOSPITAL Turner Construction has been awarded the construction of a new, 6-story, steel OAKLAND OUTPATIENT CENTER 2 BID GROUP 3 frame, medical clinic, approximately 88,000 gsf, with associated landscaping, site (ONLINE ONLY) utility work and existing parking garage modifications. BID GROUP 3 TRADES: Invited to submit a proposal at this time: - Structrual Excavation / Site Demo / Earthwork / Paving - CMU - Metal Fabrications - Roofing / Waterproofing - Flashing / Sheet Metal / Expansion Joints - Garage Renovations - Deep Foundations / Drilled Piers - Micropiles - Site Concrete - Landscaping - Architectural Millwork - Lab Casework - Fireproofing - Doors, Frames and Hardware - Acoustical Ceilings / Wall Panels - Flooring - Ceramic Tile - Painting and Wall Coverings - Specialites: Signage / Toilet Partitions & Accessories / Coiling Doors / Window Coverings PROJECT SCHEDULE: Construction to begin in July 2015 with a 23-month duration. Refer to construction bid schedule for more information. PREQUALIFICATION: All subcontractors must be pre-qualified to submit a proposal. Pre-qualification information may be requested from Sylvia Strowe by email at:([email protected]). PROPOSAL FORMAT: A Turner Bid Form is provided. Proposals are to be submitted via the SmartBidNet link above or emailed to Shirley San Diego at:([email protected]). PROJECT LABOR AGREEMENT: This Project will have a Project Labor Agreement in effect. Project is available for viewing ONLINE ONLY!!! Page 14 of 31 Online Bid Date 2/9/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 245 2:00 PM SANTA ROSA FORSYTH HALL HVAC UNIT 1 & 2 REPLACEMENT AT SANTA ROSA JR COLLEGE See Specifications for complete Scope of Work. Technical Specifications are on the 2 floor plans. Planroom & Online 115 5:00 PM OAKLAND VALDEZ STREET MICRO UNITS TECHNICAL SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Project consists of new construction - 5-story building with 70 micro units, living quarters and 1 live work space. 2/10/2015 205 2:00 PM MARTINEZ 434 2:00 PM ELK GROVE NEW TREATMENT PLANT SAFETY ENHANCEMENTS, Div 1-3, 5, 7, 9 & 14-16. The Work generally consists of safety improvements to existing facilities in the treatment plant and ADA improvements. PHASE 4 SITE PREPARATION PROJECT (ECHO WATER PROJECT) - ONLINE ONLY Div 1-11, 22-23, 26-28, 31-34, 40 & 43. The Project Scope includes temporary and permanent roadway installation; utility installation, relocation, and demolition; extension of District 12kV electrical system for temporary power use; installation of new construction well; installation and demolition of fencing and gates, installation of a new security guard facility; site development for Echo Water Project contractor areas; demolition and relocation of several existing buildings; and other site work throughout the Sacramento Regional Wastewater Treatment Plant (SRWTP). Planroom & Online 3 Online Project is available for viewing ONLINE ONLY!!! 461 2:00 PM PLACERVILL NEW MAIN STREET REHABILITATION PROJECT E PHASE 1A: WATER LINE REPLACEMENT (ONLINE ONLY) The Project is located in the City of Placerville, El Dorado County. The Work to be done is shown on the Plans described in the Special Provisions and generally consists of, but is not limited to: Online Replacement of aged and deteriorated existing water lines within Main Street, located in Downtown Placerville. For bonding purposes, the anticipated project cost is less than $700,000. Project is available for viewing ONLINE ONLY!!! 469 2:00 PM ANTIOCH NEW PAVEMENT PLUGS AND BASE REPAIRS AT VARIOUS LOCATIONS (ONLINE ONLY) This Project consists, in general, of traffic control, pavement grind and base repair, 1 asphalt concrete plugs as marked in the field, storm water pollution control, pavement marking removal, pavement marking installation and all other work shown on the Plans and specified in the Project Special Provisions and Standard Specifications. The Work is more fully described in the Description of Project and other Contract Documents. Project is available for viewing ONLINE ONLY!!! Page 15 of 31 Online Bid Date 2/10/2015 Plan # Bid Time Location 53-55 2:00 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description PRESIDIO MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-16. General School Modernizations and reconstruction including ADA Access and Fire/Life-Safety upgrades, interior and exterior painting, classroom retrofit, new phone system, new clock paging system, new data infrastructure, new elevator and lift, miscellaneous site work and landscaping, hazardous material/Asbestos remediation, boiler replacement, other miscellaneous interior renovation work and Interim Housing installation and removal. Page 16 of 31 Planroom & Online Bid Date 2/10/2015 Plan # Bid Time Location 21-24 3:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans Div 1-3 & 5-16. The Work to be done under this Contract is located within the City of San Francisco as shown on the Plans. The Project generally consists of the construction of a new maintenance and operations building which will supplement the existing fuel/wash and annex buildings previously constructed. Work to be performed under this Project includes, but not limited to, Selective demolition for the installation of work to be performed; Utility work in both the public and private right of way including fire water, domestic water, fire hydrants, storm and sanitary sewer, electrical and communication work, manholes, utility boxes, gas service, etc.; Excavate, handle, reuse, transport, and dispose of site soils, groundwater and storm water controls, environmental mitigation controls, and environmental management of excavated materials; Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches; Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, and as determined by the contractor to perform the work to be constructed; Site work including street and sidewalk, concrete paving, fencing work, site lighting, signage and striping, site furnishings; Building construction including piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire alarm, fire protection systems, system integration, solar panel system, access control, security systems, etc.; Fluid systems including underground and aboveground tanks, piping and dispensing systems; Vehicle maintenance equipment including vehicle lifts, exhaust system, shop equipment, hoists and cranes;Replacement of existing manhole lids; Provide pre-construction and post construction survey, vibration and ground movement monitoring; Construction of shoreline improvements including the installation of benches, and the removal and replacement/re-grading of existing surfaces to align with the grade with the building entrances; Coordinating and scheduling of work with the various utility agencies for their service; Coordinating and scheduling of the special inspections and testing agencies, and inspections by the governing jurisdictions; Coordinating and scheduling of work with Muni Operations and Maintenance, and other projects working on the site or in the immediate area; Testing, Training, and Start-Up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract, including preparing operations and maintenance manuals, providing training for City’s operating and maintenance personnel, and completing start-up procedures and requirements as detailed in the Specifications. Contact Joon Park, Project Manager, at (415) 701-4742, or by email at: Page 17 of 31 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans [email protected] with any questions. (Previously scheduled bid date was 12/9/14. Old Plan # was the same). 459 4:00 PM REDWOOD CITY NEW REMODEL OF A DISTRICT RESIDENCE AT 20000 The purpose of this project is for the remodel of a District residence located at SKYLINE BLVD (ONLINE ONLY) 20000 Skyline Blvd in Woodside. The furnishing of all labor, materials and services required for the following designated scope of work: Replace deck; replace sliding glass door with window at the residence located in Russian Ridge Open Space Preserve. Online Mandatory Pre-bid / Site Visit: January 30th at 10 AM. RSVP Required: [email protected] by 4 PM on January 29th. Project is available for viewing ONLINE ONLY!!! 149 5:00 PM ALAMEDA NEW SPIN PIZZA RESTAURANT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online This is a Spin Pizza restaurant about 3,191 sq. ft. Scope includes, but is not limited to: demolition, concrete, concrete cutting, concrete countertops, insulation, interior finishes, millwork installation, drywall/framing, doors & frames, HVAC, electrical and plumbing. Please refer to the plans to determine the full Scope of Work. Look at the responsibility schedule on sheet G002 and the K-sheets more notes and details are in these sheets. This is Parkway Construction Project. If you have any questions, please Malone Bullock at (469) 322-3783, ext. 3083 or by email at: [email protected] 2/11/2015 413 1:30 PM EMERYVILLE EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately PHASE 1A - EBMUD (ONLINE ONLY) 2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street, Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards 65th in the City of Emeryville. Project is available for viewing ONLINE ONLY!!! Page 18 of 31 Online Bid Date 2/11/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 122 2:00 PM NEW AMBULATORY CARE CENTER (ACC) B1 PLAZA SAN FRANCISCO LEVEL ORTHOTICS & PROSTHETICS RELOCATIONS AT UCSF 433 2:00 PM MODESTO HONOR FARM BARRACKS FOUR, GUARD Project consists of Mobilization, Barracks 4 and Guard Shack (Modular) Demolition BOOTH AND SHOP PAINT BOOTH DEMOLITION and Disposal, Shop Paint Booth Demolition and Disposal. (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 1 Online 466 2:00 PM MARIN AND SONOMA COUNTIES 1 CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near CONSTRUCT NEW BRIDGE (ONLINE ONLY) Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32. Online 1 Div 1-2, 5-10, 22-23 & 26. Relocation of the existing Prosthetics and Orthotics Clinic and Shop Fabrication space from the Clinical Sciences Building (CSB) basement to the Ambulatory Care Center (ACC) Plaza location. The modular clinic area’s remodel will consist of some wall demolition and reconstruction to create five exam rooms; a Gait Room; two Offices; a new cross corridor hallway; and storage room. The Shop Fabrication area includes a complete gut and remodel to provide a shop equipment room; a plaster room; assembly area; and small storage area. In addition to the architectural construction, mechanical and electrical upgrades to serve the fabricating equipment space will be included in the Scope of Work. Area is approximately 4,100 sq. ft. Planroom & Online Available for viewing ONLINE ONLY!!! 476 2:00 PM OAKLAND NEW FRUITVALE ELEMENTARY SCHOOL BLEACHER Div 1, 6-7, 9-10, 12, 22, 26 & 32. The Project consists of restoration of bleachers; AND RESTROOM UPGRADES (ONLINE ONLY) construction of a new press box; remodel of student restrooms that includes, but is not, limited to replacement of toilet partitions, replacement of lavatories, removal/replacement of water closets, removal and replacement of toilet accessories, repair of wood roof deck, replacement of roofing, repair of fascia at eave, and installation of additional door hardware. Scope includes building components replacement and painting. 1 Online Contact David Haddad, Project Manager, at (510) 535-2726 with any questions. This Project is available for viewing ONLINE ONLY!!! 137 2:30 PM SAN FRANCISCO GILMAN PLAYGROUND RENOVATION Div 1, 3, 6, 9-12, 22, 26 & 31-33. The Work to be done under this Contract is located at 993 Gilman Avenue, San Francisco, 94124, known as Gilman Playground, and consists of site demolition; hazardous material abatement; new children’s play equipment, rubber surfacing and site furnishings; minor grading; drainage; lighting; irrigation; planting; paving; restroom renovation; and all appurtenant work in accordance with Specifications and Drawings. Contact Marvin Yee, Project Manager, at (415) 581-2541 with any questions. Page 19 of 31 Planroom & Online Bid Date 2/11/2015 Plan # Bid Time Location 453 3:00 PM SANTA CLARA # of Addenda Plans Plan Name CSI Divisions / Job Description TRIMBLE ROAD TRUNK SANITARY SEWER IMPROVEMENTS (ONLINE ONLY) Div 1-3, 5, 9 & 15. Trades include controlled low strength material, shaft excavation and support, settlement monitoring, erosion control (vegetative), pilot tube guided auger boring, pilot tube guided pipe ramming, pipe jacking using tunnel boring machine, sheeting, shoring and bracing, asphalt concrete pavement and base, slurry seal, high density polyethelene pressure pipe, large PVC non-pressure pip, steel casing pipe, casing spacers, sewer crack and joint grouting, cured-in-place pipe liner, cured-in-place manhole rehabilitation, calcium aluminate manhole rehabilitation, CCTV inspection of sanitary sewer mains, concrete, miscellaneous metals, PVC liner and stop gates. Online Project is available for viewing ONLINE ONLY!!! 456 3:00 PM SANTA CLARA NEW SCOTT BOULEVARD AND PARK AVENUE SANITARY SEWER IMPROVEMENTS (ONLINE ONLY) The Work shall consist of replacing approximately 800+/- feet of 8-inch sanitary sewer with 10-inch sanitary sewer at Scott Boulevard (between Homestead Road and Serra Avenue), and replacing approximately 672+/- feet of 10-inch sanitary sewer with 10-inch and 12-inch sanitary sewer at Park Avenue (between Bellomy Street and Poplar Street), replacement of approximately 22 existing sanitary sewer laterals and cleanouts, including sanitary sewer manholes, impacted traffic signal detector loops, and all other appurtenances required to make the work complete. Online Project is available for viewing ONLINE ONLY!!! 2/12/2015 301 1:30 PM SANTA CLARA COUNTY NEW INSTALLATION OF COOLING UNITS IN SIGNAL BUNGALOWS Work consists of furnishing all labor, material, and equipment necessary for the addition of 15 HVAC units and control thermostats to designated signal huts along the VTA Light Rail Corridor. All Work must conform to this document and all insurance, bonding, California Public Untilites Commission, and VTA Rail Safety requirements to work within the Light Rail right of Way. See Appendix 'A' for VTA Specified location of Signal Huts. 465 11:00 AM LODI NEW LODI TRANSIT STATION RESTROOM VAULT IMPROVEMENTS (ONLINE ONLY) Div 1-3, 6-10 & 12-13. Trades include selective building demolition, concrete, plastic laminate, rough carpentry, finish carpentry, wood casework, solid surface fabrications, building insulation, concrete slab vapor emissions and alkalinity control treatment, waterproof membrane, roofing, sealants, caulking and adhesive tape, steel knock down drywall frame, rolling steel door, rolling door motor, glass, glazing and window films, gypsum board, wall tile, resilient base, vinyl composition tile, epoxy mosaic composition flooring, decorative fiberglass reinforced wall panels, painting, toilet partitions, washroom accessories, baby changing station, fire extinguishers, entrance floor mats and frames, and security access and surveillance. 1 Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 200 2:00 PM NAPA LOS CARNEROS WATER DISTRICT (LCWD) RECYCLED WATER PIPELINE Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work. Page 20 of 31 4 Planroom & Online Bid Date 2/12/2015 Plan # Bid Time Location 425 2:00 PM SAN MATEO AND ALAMEDA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and FURNISHINGS, SIGNS, NATIVE PLANTING & Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The IRRIGATION (ONLINE ONLY) Contractor must have either a Class A License or one of the following Class C Licenses: C-27, C-13. Online Project is available for viewing ONLINE ONLY!!! 44 2:00 PM EL CERRITO EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp, IMPROVEMENTS renovation of an existing exterior stairway, and construction of an interior ramp. Planroom & Online PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will be conducted on this date by a representative of the County's Capital Projects Management Division. Tour will begin promptly at 9:00 AM, starting at the front entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito. 46 2:00 PM SAN FRANCISCO 473 2:00 PM ANTIOCH 60 2:00 PM RICHMOND STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!! SDPS-1C IMPROVEMENTS AT SFO Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps controls, SCADA system and electrical equipment for storm drain pump stations SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major airport runways. NEW SWIM LAGOON RESURFACING AND MISCELLANEOUS REPAIRS (ONLINE ONLY) RICHMOND CIVIC AUDITORIUM AMERICANS WITH DISABILITIES ACT BUILDING UPGRADES PROJECT 1 See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! Planroom & Online Online Div 1-2, 4-10 & 14-16. The City of Richmond will accept bids for the construction of 1 the Richmond Civic Auditorium Americans with Disabilities Act building upgrades project. Planroom & Online Trades include Selective Demolition; Site Concrete; Concrete; Structural Steel; Cold Formed Metal Framing; Metal Fabrications; Handrails and Guardrails; Carpentry; Finish Carpentry; Countertops; Water Repellants; Flashing and Sheet Metal; Joint Sealers; Steel Doors and Frames; Aluminum Storefront and Sliding Doors; Hardware; Glazing; Portland Cement Plaster; Gypsum Board Assemblies; Tile; Carpet; Modular Wall System; Paints & Coatings; Plastic Laminate Toilet Compartments; Signage; Toilet Accessories; Hydraulic Elevator; Fire Protection; Plumbing; HVAC; and Electrical. 61 2:00 PM SARATOGA WEST VALLEY COLLEGE MAIN TELECOMMUNICATIONS ROOM RENOVATION Div 1-3, 5-10, 21-23 & 26-28. Project consists of Renovation of an existing building to house the new telecommunications infrastructure and fiber backbone for the campus; Development of a service yard on the west side of the existing building.; Structural modifications to facilitate architectural, mechanical, and electrical remodel; and New fire suppression system to serve the telecommunications room. Page 21 of 31 1 Planroom & Online Bid Date 2/12/2015 Plan # Bid Time Location 82 2:00 PM RICHMOND # of Addenda Plans Plan Name CSI Divisions / Job Description SENIOR CENTER ADA RESTROOMS IMPROVEMENTS Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements 1 and relocation of kitchen and for all other Work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Planroom & Online Trades include site concrete; concrete; CMU construction; rough carpentry; finish carpentry; architectural woodwork; building insulation; flashing and sheet metal; firestopping; joint sealers; steel doors and frames; access doors and panels; door hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops; fire extinguisher cabinets; toilet accessories; food service equipment; appliances; plumbing; HVAC; lighting; and electrical. All questions regarding bid documents, construction Plans and Specifications must be submitted by email to Yader Bermudez, Project Manager, at: [email protected] no later than 5 PM, on February 5, 2015. Questions will be answered in a written response and will be available to bidders on the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days prior to the bid opening deadline. 2/13/2015 470 11:00 AM CONCORD NEW TODOS SANTOS PLAZA ARCHWAY (ONLINE ONLY) The Work to be done in general consists of fabrication and installation of two tubular steel archways and construction of supporting concrete columns and cast in drilled hole (CIDH) pier foundations, furnishing and installing cultured stone veneer on column faces, furnishing and installing bronze plaques, coordinating the work of sign fabricator (letters and LED lighting on backing plates, fabricated by others) assembly of signage in archway and providing electrical connection to existing service and all other work as shown on the Plans and as specified in these Special Provisions. Project is available for viewing ONLINE ONLY!!! Page 22 of 31 Online Bid Date 2/17/2015 Plan # Bid Time Location 109-110 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description LOWELL HIGH SCHOOL NEW CLASSROOM BUILDINGS Div 1-3, 5-12, 21-23, 25-28 & 31-33. # of Addenda Plans Planroom & Online NEW CLASSROOM BUILDING AND SITEWORK: Replace the existing portable classrooms on the Lowell campus with a permanent classroom complex consisting of a 12-classroom building and a 2-classroom building. In addition, the Project requires associated sitework to reconfigure the existing parking lot and landscaping including exterior lighting, improve circulation, upgrade underground utilities and ADA access. INTERIM HOUSING: In addition, (5) five new temporary relocatable classrooms and (2) two new temporary relocatable toilet buildings will be provided by the District as interim housing and will be located on the adjacent existing basketball court for the construction duration. All utilities and sitework associated with these new relocatables will be provided by this Contract. This Contractor will also be responsible for the hazardous material removal and utility disconnection of for all the existing relocatables and will be required to demolish and remove (7) seven relocatable classrooms and (2) two portable toilet buildings. After construction completion of the new classroom buildings, the utilities from the interim housing relocatable buildings will be disconnected in preparation for the District removal of these relocatables. The existing basketball court will be resurfaced and re-striped and new basketball poles and backstops will be installed to restore the court to the original condition. 180 2:00 PM HAYWARD NEW NEW HIGHLAND 1530 RESERVOIR PROJECT Div 1-3, 5, 7, 9, 11, 13 & 15-17. The Work consists, in general, of constructing a 1.2 MGD Welded Steel Tank Reservoir with valve vault and accompanying appurtenances, site improvements including paving, site preparation, earthwork, sheeting, shoring and bracing, concrete, anchor bolts, miscellaneous metal work hot-dip zinc coating, mechanical zinc coating, preformed joint fillers, sealants and caulking, coating systems, coating for steel water storage reservoir, equipment, cathodic protection, welded steel water storage tank, mechanical, electrical, instrumentation and controls. Page 23 of 31 Planroom & Online Bid Date 2/17/2015 Plan # Bid Time Location 300 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description NEW INSTALL MOTORIZED ROLLING GATE, SECURITY TURNSTILE, AND REMOVE FENCE MAN DOOR AT OKS - BART # of Addenda Plans Div 1-3, 20, 26 & 32-33. The Work of this Contract includes, but is not limited to, furnishing all labor, equipment, materials and services required to install one (1) automatic, motorized, side rolling security gate and one (1) security personnel turnstile. Existing fencing and two (2) man doors will be removed and replaced as needed at two (2) locations, as indicated in Contract Specifications and Drawings. Planroom & Online SCOPE OF WORK: A. Provide one (1) 30 ft. wide, side rolling motorized chain link gate at BART Oakland Shops driveway per Contract drawings, retracting into Union Pacific Railroad easement area, including steel lower track and its concrete support piers. Easement area is the area allotted to BARTO by Union Pacific on their property for installation of BARTO's retracting side rolling fence and support piers. B. Remove one (1) existing man door and surrounding fence as needed, and provide one (1) security turnstile with three 47" long arms at employee parking lot entrance as indicated on Contract Drawings. C. Remove one (1) existing man door at northwest corner of lot and replace with chain link fencing and barbed wire to match adjacent fence. 479 2:00 PM MOUNTAIN VIEW NEW RESIDENCE INN GUESTROOM ADDITION (ONLINE ONLY) 4 Div 1-3, 5-14, 21-23, 26-28 & 31-33. Project consists of demolition of 4 existing buildings and construction of a new ground-up 4 story 22,612 sq. ft. Guest Tower addition to an existing Residence Inn with site and offiste work to include: hazardous material abatement, demolition, surveying, earthwork, erosion control, utilities, landscaping, concrete, structural steel, rough/finish carpentry, architectural millwork, cultured marble/solid surfaces, waterproofing, insulation, siding, roofing, sheet metal, joint sealer, doors and hardware, storefront, windows, lath and plaster, metal stud/drywall, ceramic tile, acoustical ceiling, wall coverings, painting, toilet partitions/accessories, shelving, linen chutes, residential cabinetry, window treatment, FF&E, elevator, fire protection, plumbing, HVAC, electrical, fire alarm and low voltage. This Project is available for viewing ONLINE ONLY!!! Page 24 of 31 Online Bid Date 2/17/2015 Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description 1 Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition, abandonement and removal, sewage flow control, earthwork, soil stabilization, steel casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and monitoring, asphalt concrete paving, shaft construction, microtunneling, precast concrete structures, carrier pipe installation into casing, fused PVC sewer pipe, sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer system, building sewer (lateral) construction and reinstatement, traffic stripes and pavement markings, traffic control, traffic loops, adjust incidental structures to grade, controlled low strength material, concrete reinforcement, cast-in-place concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames and covers, and general piping. 35 3:00 PM SAN CARLOS INDUSTRIAL ROAD PARALLEL SANITARY SEWER PROJECT 450 3:30 PM ANDERSON ANDERSON MIDDLE SCHOOL ADMINISTRATION Div 1-3, 5-10, 12, 22-23, 26, 28 & 32. Work consists of the reconstruction and AND LIBRARY CONSTRUCTION (ONLINE ONLY) modernization of the Anderson Middle School Administration and Library. The following divisions are included: existing conditions, concrete, metals, wood, plastics and composites, thermal and moisture protection, openings, finishes, specialties, furnishings, plumbing, HVAC, electrical, electronic safety and security and exterior improvements. Planroom & Online 2 Online 1 Planroom & Online Project is available for viewing ONLINE ONLY!!! 2/18/2015 93-95 2:00 PM PACIFICA NEW HOLIDAY INN EXPRESS Div 1, 3-10, 14, 21-23, 26 & 31-32. SITE: Combine existing hotel site with newly acquired northerly site into one property; Demolish existing residential structure near creek to allow new addition; Demolish existing commercial building in northerly property to allow new addition and landscaping. existing creek side landscaping to remain and be protected during construction. EXISTING HOTEL: Conversion of high ceiling space above existing breakfast room to 1 guestroom at 2nd floor, enlarge 1 existing 3rd floor guestroom, conversion of parking spaces to hotel space and motorcycle parking, convert 2 existing parking spaces for new driveway into new parking garage. CREEKSIDE ADDITION: Addition of 9 upper floor guest rooms, breakfast room, meeting space and back-of-house renovation. NORTHERLY SITE ADDITION: Addition of 36 upper floor guest rooms, ground floor retail and parking garage. Page 25 of 31 Bid Date 2/19/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 197 2:00 PM SAN FRANCISCO SOUTHEAST WATER POLLUTION CONTROL THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. PLANT SLUDGE THICKENING IMPROVEMENTS, JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! PHASE 1 Div 1-3, 5, 7, 9, 11, 22-23, 26, 40 & 46. The objective of the Project is to rehabilitate Southeast Plant (SEP) 785 facility and equipment including gravity belt thickeners, odor control unit, minor plumbing upgrades in SEP 780 basement location that includes upsizing of polymer pipes valves and pumps. The Work is to be performed in San Francisco, California. 41-42 2:00 PM OAKLAND 1110 JACKSON STREET MIXED USE PROJECT Planroom Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment, affordable housing project scheduled to begin construction on or about March 2015. The street level shall be a combination of common area residential, commercial “cold shell” and parking. The structure shall be slab on grade with thickened footings, grade beams with the second level post-tensioned concrete and 4 levels of type V-A wood framing above the 2nd level of concrete. Planroom & Online PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with Oakland Local Hire Requirements. 445 2:00 PM VALLEJO MARE ISLAND WESTERN APPROACH BRIDGE REPLACEMENT (ONLINE ONLY) The Work to be done includes providing traffic control, remove and replace existing timber bridge with concrete simple span structure constructed of piles, bent cap and precast concrete voided slabs. The approach road on west side will be replaced with new AC pavement. and removing and replacing Portland cement concrete sidewalk and handicap curb ramps. The bidder shall include in his/her bid and provide all labor, tools and materials for a complete and working Project in conformance with the intent shown on the Drawings and specified herein. Online Contact Srinivas Mulktevi, Project Manager, at (707) 651-7107 with any questions. Project is available for viewing ONLINE ONLY!!! 474 2:00 PM OAKLAND NEW MARTIN LUTHER KING SHORELINE TIDEWATER Project consists of widening asphalt road for park entry; construction of concrete ENTRY MODIFICATIONS (ONLINE ONLY) sidewalk, curb and gate center Island; installation of two-rail fence, metal gates, tiger teeth and wheel stops. Online Project is available for viewing ONLINE ONLY!!! 482 2:00 PM DIXON WASTEWATER TREATMENT FACILITY WATER SUPPLY WELL PROJECT (ONLINE ONLY) Project consists of drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. Project is available for viewing ONLINE ONLY!!! Page 26 of 31 1 Online Bid Date 2/20/2015 Plan # Bid Time Location 463 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description NEW ARCHITECTURAL SERVICES AT RAINBOW RECREATION CENTER RENOVATION & EXPANSION - RFP (ONLINE ONLY) # of Addenda Plans The Project Delivery Division of the City of Oakland, Oakland Public Works Department (OPW) is issuing a Request for Proposals for full design and engineering services for the renovation and expansion of the Rainbow Recreation Center and renovation of the site. The center is located at 5800 International Boulevard. The design team shall assist the City in conforming to its grant obligations under the Safe Drinking Water Bond Act of 2006 (Proposition 84). Online Services may include, but not limited to, the following: site surveys, site and building evaluations, building programming, ADA and code analysis, facilitating stakeholder meetings, permit applications, sustainability program implementation, certification and conformance, schematic design, design development, construction documents, cost estimating, construction support and construction close out support. Contact Denise Louie, Project Manager, by email at: [email protected], or by phone at (510) 238-3682 with any questions. Project is available for viewing ONLINE ONLY!!! 2/24/2015 121 11:00 AM ALBANY NEW PIERCE STREET PARK CONSTRUCTION PROJECT Div 1-3, 9-12, 22, 26 & 31-33. The Project is located at the intersection of Pierce Street and Calhoun Street in the City of Albany, Alameda County California. The Project is more specifically defined in the Contract Documents, but generally it includes site work consisting of site grading, installation of utilities, construction of new playground, parking, and public facilities, installation of play equipment and landscaping. The Project includes a base bid and a bid alternate. 458 2:00 PM SAUSALITO NEW BEACH FORCE MAIN AND GRAVITY SEWER INSPECTION PROJECT (ONLINE ONLY) Div 1-2 & 9. The Work includes, but is not limited to; 1) the installation of four access wyes along the Beach Force Main (FM); 2) cleaning and CCTV inspection of the SMCSD Beach FM from the Main Street Pump Station to the SMCSD Treatment Facility; 3) cleaning and CCTV inspection of the City of Sausalito gravity sewer from City manhole 110000 to City manholes 110201 and 110202, and additional work as needed to construct and inspect a complete and operational project as specified in these Contract Documents. Questions concerning this project or the bid package must be submitted by fax to (415) 332-0453, or email to: [email protected] to Kevin Rahman, Associate Engineer, at least five (5) working days before the time specified for bid opening. Where appropriate, the District may respond to such questions by addenda transmitted to all bid package recipients. Project is available for viewing ONLINE ONLY!!! Page 27 of 31 Planroom & Online Online Bid Date 2/25/2015 Plan # Bid Time Location 104-105 2:00 PM SAN RAMON Plan Name CSI Divisions / Job Description DOUGHERTY VALLEY HIGH SCHOOL CLASSROOM BUILDING ADDITION (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general education classroom and a CTE facility on the lower level; 4 labs and 2 two general education classrooms on upper level. Also lab prep rooms on both levels, a janitor closet on lower level and book storage room at upper level. There is an enclosed outdoor area attached to the CTE facility and associated site work. Trades include demolition; concrete; thin brick veneer; structural steel; metal fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural woodwork; site-applied water repellent; thermal building insulation; below-grade vapor retarder; water vapor emission control; aluminum plate wall panels; preformed metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing; flashing and sheet metal work; penetration firestop systems and sealants; joint sealants; movement joint cover assemblies; steel doors and frames; flush wood doors; integrated door assemblies; flush FRP doors; access doors and panels; aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum board shaftwall systems; ceiling and soffit suspension systems; lath and portland cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE toilet compartments and screens; accordion folding partitions; corner guards, toilet and bath accessories; fire protection specialties; steel lockers; projection screens; horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing and grubbing; trenching and backfilling; cement and concrete for exterior improvements; base courses; flexible paving; concrete curbs and gutters; fences and gates; irrigation; planting; and utilities. (Previously scheduled bid date was 1/14/15. Old Plan # was the same) Page 28 of 31 2 Planroom & Online Bid Date 2/25/2015 Plan # Bid Time Location 196 2:00 PM VARIOUS Plan Name CSI Divisions / Job Description # of Addenda Plans INSTALL SAFETY BARRIERS IN RIGHT-OF-WAY Div 1-6, 9, 20, 26 & 31-34. The Work, in general, consists of providing all labor, SYSTEM - BART materials, equipment and other services necessary for the performance of all operations to construct permanent physical barriers consisting of any combination of chain link fences and gates, Caltrans K-rail topped with chain link fence, and poles and chains, in various locations as indicated. The Work includes drilling and bonding dowels in concrete; drilling and bonding dowels with chemical adhesives; cast-in-place concrete; precast concrete; clearing and grubbing; locating existing utilities; protection of existing utilities; earthwork; and grounding and bonding of new barriers. Planroom & Online The Work includes: Mobilization, construction phasing, construction barriers, demolition, excavation, traffic control, site preparation and maintenance during construction, removal of excess material and clean up after construction. In addition, the Contractor shall be responsible for obtaining all required permits from authorities other than BART as needed for the execution of the Work. A permit from Union Pacific Railroad (UPRR or Railroad) is required for site for AYJ, which is located at E. 8th Street in Oakland, CA AYJ is more than 50 feet away from the center line of UPRR. See Contract Drawings. 487 2:00 PM SAN DIEGO HEALTH CARE FACILITY IMPROVEMENT PROGRAM AT RICHARD J. DONOVAN CORRECTIONAL FACILITY (ONLINE ONLY) 2 Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is to remedy deficiencies in its existing health care components. The Project consists of two sub-projects, which includes one to two sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, building pad preparation, new construction, accessible paths-of-travel, and infrastructure upgrades. The Projects are located within and outside the existing secure perimeter. The new Administration Building will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new building, including communications/signal, electrical, storm drain, water and sewer lines. This Project is available ONLINE ONLY!!! Page 29 of 31 Online Bid Date 2/26/2015 Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT Div 1, 9 & 15. The Port of San Francisco (the “Port”), a department of the City and 1 County of San Francisco (the "City") announces an Invitation for Bids (“IFB”) for construction on the PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT in San Francisco, CA. The proposed Work will consist of replacement of the existing under-pier sewer gravity main and all lateral lines, which connect to multiple tenants restaurants’ plumbing fixtures. 97 10:30 AM SAN FRANCISCO 457 2:00 PM UNION CITY NEW 2014-15 WHEELCHAIR RAMP PROJECT (ONLINE Project consists of hauling, mobilization, water and dust control, maintaining traffic, ONLY) traffic control system for lane closure, construction area signs, barricades, clearing, grubbing, grading and soil off-haul, relocate irrigation lines and heads, curb ramp construction, concrete, sidewalk, curb and gutter, concrete retaining curb and concrete work at traffic signals. Planroom & Online Online Questions concerning this Project, based on the bid package, must be submitted by fax to (510) 489-9468 or by email to: [email protected] to Murray Chang or phone (510) 675-5311 at least five (5) working days before the time specified for bid opening. Project is available for viewing ONLINE ONLY!!! 3/3/2015 471 3:00 PM TIBURON NEW DAIRY KNOLLS STAIR AND PATH IMPROVEMENTS (ONLINE ONLY) The Work to be performed under this Contract consists of constructing two concrete stair cases. Stair cases include concrete steps and landings, metal rails and wood headers with stakes. An aggregate base path shall connect the two stair cases to provide a clear route of travel. Concrete sidewalk shall be constructed to connect the top of the upper stairs to an existing curb ramp adjacent to the existing recreation center building. Clearing and grubbing shall be completed, including removal of a tree. Earthwork and grading shall be completed. The Work will require minor traffic control, coordination with local utility companies, and other miscellaneous items not mentioned above that are required by the Plans, the Standard Specifications or these Special Provisions to be performed, placed, constructed or installed. Online Project is available for viewing ONLINE ONLY!!! 3/4/2015 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 4 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. This Project is available for viewing ONLINE ONLY!!! Page 30 of 31 Online Bid Date 3/5/2015 Plan # Bid Time Location 475 3:00 PM Plan Name CSI Divisions / Job Description CUPERTINO NEW KIOSKS PROJECT AT DE ANZA COLLEGE (ONLINE ONLY) # of Addenda Plans Div 1, 26 & 31-33. Trades include electrical, site preparation, demolition, paving and surfacing, and underground electrical structures. Online PLEASE NOT: All questions must be faxed to the District’s Purchasing Office at (650) 948-5194, Attention: Gina Bailey with a copy to Linda Mahi, or by email to: [email protected] with a copy to Linda Mahi at: [email protected]. The deadline to submit questions is Noon on February 18, 2015. A question form is included herein, see Bid Document, 00 31 07. This Project is available for viewing ONLINE ONLY!!! 3/12/2015 98 2:00 PM ROHNERT PARK NEW CABERNET VILLAGE STUDENT HOUSING Div 1, 5-12, 22-23 & 26-28. Work Included in the Contract includes all construction RENOVATION AT SONOMA STATE UNIVERSITY and services required for rehabilitating 54 student housing units and common building, California Building Code (CBC) Type V-B construction, of approximately 62,888 sq. ft. floor area, including: Planroom & Online 1. New interior finishes including cabinets, counters, doors, door hardware, paint, carpet, resilient flooring, and bathroom accessories. 2. Gypsum board demolition, patch, and new skim coat and texture. 3. New plumbing supply system. 4. Heating and ventilating systems. 5. Electrical power, lighting and signal systems. 6. Coordination of work being performed by others under separate contracts with University, described in Article below titled "CONCURRENT WORK UNDER SEPARATE CONTRACTS." 7. Additional general information concerning the Project is provided on the Architectural Drawings. 472 3:30 PM NAPA NEW NAPA COUNTY DEPARTMENT OF CORRECTIONS SUPPLY AND EXHAUST VENT REPLACEMENT (ONLINE ONLY) The Work involves all labor and materials for manufacturing of supply and exhaust vents located within the Napa County Department of Corrections. • Supply and install all vents. • Test and balance all vents. • Contractor shall field verify all dimensions and all existing conditions. • Infill walls to align with existing finishes. • Patch, paint and texture to match existing conditions. • All work, material, means & methods, ETC. shall conform to all governing building codes, regulations and agencies. Project is available for viewing ONLINE ONLY!!! Page 31 of 31 Online
© Copyright 2024