Illinois Tollway Projects Tri-State Tollway (I-294) Cost Magnitude Key: A B C D E F UU / SA - Jane Addams Memorial Tollway (I-90) Reagan Memorial Tollway (I-88) Veterans Memorial Tollway (I-355) Elgin-O'Hare (EO) Systemwide (S/W) Other Agency Major Projects CONSTRUCTION CONTRACT BID LETTING SCHEDULE (Sorted by Bid‐Opening) IDOT OMP & O'Hare/Midway CIP $5 - $10M $10 - $25M $25 - $50M $50 - $75M $75 - $100M > $100M $0 - $5M Unbundled Set Aside for Small Businesses Located on Illinois Tollway Website under Doing Business www.illinoistollway.com CHICAGO AREA MAJOR TRANSPORTATION AGENCIES Information in this document is subject to change. ROUTE TYPE OF WORK 90 Non Roadway EO Recon/Widen 90 PROJECT DESCRIPTION Ramp Queue Detection / DMS I-90 Irene WB, US 20, I-39 (MP 17.1 - 52.5) PROJECT NUMBER ADVERTISE DATE BID OPENING DATE ESTIMATED BOARD APPROVAL ESTIMATED NOTICE TO PROCEED CONTRACT COMPLETION DATE COST MAGNITUDE (See key) 4198 18-Sep-14 A 16-Oct-14 A 20-Nov-14 A 11-Feb-15 9-Feb-16 U Park Blvd-Pierce Rd-Ketter Dr Reconstruct/Add Lane 4621 17-Sep-14 A 21-Oct-14 A 20-Nov-14 A 6-Feb-15 5-Aug-15 A Mainline work Outside Mainline Rdwy and Bridges Wolf Rd to Mannheim Rd (MP 75.1 to 76.6) 4211 25-Sep-14 A 30-Oct-14 A 20-Nov-14 A 4-Feb-15 1-Jun-16 D 90 Mainline work Outside Mainline Rdwy and Bridge Oakton St to Wolf Rd (MP 73.3 to 75.1) 4210 29-Sep-14 A 30-Oct-14 A 20-Nov-14 A 4-Feb-15 23-Dec-15 D 90 Mainline work Outside Rdwy Reconstr. and widening Roselle Rd to I-290 / IL Rt 53 (MP 65.5 to 68.1) 4207 9-Oct-14 A 13-Nov-14 A 18-Dec-14 A 17-Feb-15 23-Dec-15 D 90 Mainline work Outside Mainline Rdwy W of Higgins Rd to Roselle Rd (MP 60.8 to 65.5) 4206 14-Oct-14 A 13-Nov-14 A 18-Dec-14 A 17-Feb-15 23-Dec-15 D EO Miscellaneous Fabrication of the Joints & Bearings Lake St (US 20) to Meacham Rd 4643 7-Nov-14 A 2-Dec-14 A 18-Dec-14 A 18-Feb-15 30-Sep-15 U 90 Mainline work Outside Mainline Rdwy and Bridges I-290 / IL 53 to Arlington Hts Rd (MP 68.1 to 70.7) 4208 20-Oct-14 A 4-Dec-14 A 18-Dec-14 A 17-Feb-15 23-Dec-15 D 90 Mainline work Outside Mainline Rdwy and Bridges Arlington Hts Rd to East of Oakton St (MP 70.7 to 73.3) 4209 21-Oct-14 A 4-Dec-14 A 18-Dec-14 A 17-Feb-15 23-Dec-15 D 90 Mainline work Outside Mainline Rdwy & Bridge Reconstr. IL Rt 25 to Higgins Rd (MP 56.8 to 60.8) 4205 7-Nov-14 A 11-Dec-14 A 29-Jan-15 A 6-Mar-15 23-Dec-15 E S/W ITS Systemwide Dynamic Message Signs Upgrade Non-CRP 9169 7-Nov-14 A 16-Dec-14 A 29-Jan-15 A 26-Mar-15 17-Sep-15 U 90 Mainline work WB Rdwy & Bridge Reconstr. IL RT 31 to Fox River (MP 54.4 to 55.4) 4204 18-Nov-14 A 16-Dec-14 A 29-Jan-15 A 7-Mar-15 23-Dec-15 C 90 Mainline work EB Mainline Rdwy and Bridge Mannheim Rd to Kennedy 4212 20-Nov-14 A 18-Dec-14 A 29-Jan-15 A 23-Mar-15 23-Nov-16 D S/W Facility CA Building North Enterance, ADA Ramp and ADA Parking 9135R 7-Nov-14 A 18-Dec-14 A 29-Jan-15 A 20-Mar-15 28-Aug-15 U IDOT Miscellaneous IDOT Bid Letting 294 Maintenance Salt Barn Lighting Maintenance Facility M1 @ I-294 90 Reconstruct 90 19-Dec-14 A 4214 17-Nov-14 A 8-Jan-15 A 29-Jan-15 A 19-Mar-15 10-Jun-15 U/SA IL 72 (Higgins Rd) Crossroad Bridge Reconstruction 5698 4-Dec-14 A 8-Jan-15 A 29-Jan-15 A 23-Mar-15 18-Dec-15 A Miscellaneous I-90 Various Repairs (West of Cherry Valley I-39 Int) MP 0 to 17.2 4175R 11-Dec-14 A 13-Jan-15 A 26-Feb-15 4-May-15 22-Oct-15 U 90 Reconstruct Garden Prairie and Anthony Rd Crossroad Bridge Reconstruction 5697 11-Dec-14 A 13-Jan-15 A 26-Feb-15 27-Apr-15 6-Nov-15 A 88 Reconstruct Roadway Resurface US 30 to US52 5660 6-Jan-14 A 27-Jan-15 A 26-Feb-15 24-Apr-15 1-Jun-16 D IDOT Miscellaneous IDOT Bid Letting 294 Miscellaneous Tri-state Roadway Safety and Structural Repairs (M.P. 23 to 52.8) 5707 12-Jan-15 A 3-Feb-15 26-Feb-15 27-Apr-15 13-Nov-15 A 88 Reconstruct Roadway Resurface US 52 to Midway Rd 5661 6-Jan-15 A 3-Feb-15 26-Feb-15 24-Apr-15 1-Jun-16 D 90 Watermain NSMJAWA Watermain Reloc - Elmhurst Rd Piping Instl. 4648 6-Jan-15 A 3-Feb-15 26-Feb-15 26-Apr-15 31-May-16 B 90 Interchange Rdwy, Ramp and Plazas Barrington Rd 4220 18-Dec-14 A 5-Feb-15 26-Feb-15 27-Apr-15 30-Nov-16 C 294 Maintenance Demo and Abatement Maintenance Facility M1 @ I-294 4213 23-Dec-14 A 10-Feb-15 26-Feb-15 23-Apr-15 25-Aug-15 U/SA 88 Reconstruct 5662 26-Jan-15 A 17-Feb-15 26-Feb-15 24-Apr-15 1-Jun-16 C Roadway Resurface Midway Rd to IL 251 30-Jan-15 A Page 1 of 2 Report Run: 1/30/2015 Illinois Tollway Projects Tri-State Tollway (I-294) Cost Magnitude Key: A B C D E F UU / SA - Jane Addams Memorial Tollway (I-90) Reagan Memorial Tollway (I-88) Veterans Memorial Tollway (I-355) Elgin-O'Hare (EO) Systemwide (S/W) Other Agency Major Projects CONSTRUCTION CONTRACT BID LETTING SCHEDULE (Sorted by Bid‐Opening) IDOT OMP & O'Hare/Midway CIP $5 - $10M $10 - $25M $25 - $50M $50 - $75M $75 - $100M > $100M $0 - $5M Unbundled Set Aside for Small Businesses Located on Illinois Tollway Website under Doing Business www.illinoistollway.com CHICAGO AREA MAJOR TRANSPORTATION AGENCIES Information in this document is subject to change. PROJECT DESCRIPTION PROJECT NUMBER ADVERTISE DATE BID OPENING DATE ESTIMATED BOARD APPROVAL ESTIMATED NOTICE TO PROCEED CONTRACT COMPLETION DATE COST MAGNITUDE (See key) ROUTE TYPE OF WORK S/W ITS Systemwide Ramp Count / Type II DMS Non-Roadway - Non-CRP 9175 20-Jan-15 A 17-Feb-15 26-Mar-15 29-May-15 18-Dec-15 U 90 Interchange I-90 at Irene Rd (Ramps T/F the West) 4218 8-Jan-15 A 19-Feb-15 26-Mar-15 22-May-15 29-Dec-15 A 88 Reconstruct Mitchell Rd over I-88 Bridge Removal and Replacement MP 118.2 5699 29-Jan-15 A 24-Feb-15 26-Mar-15 1-Jun-15 14-Dec-15 U S/W FiberOptics Systemwide FiberOptic Reloc. 4219R 9-Feb-15 3-Mar-15 26-Mar-15 15-May-15 15-May-17 U S/W Facility CA Improvements (AS1 Handler, Boiler Replc.) 9174 3-Feb-15 3-Mar-15 26-Mar-15 28-May-15 1-Oct-15 U/SA IDOT Miscellaneous IDOT Bid Letting 294 Maintenance Boiler Replacements at M-2, M-4, M-5 and M-8 294 Maintenance EO Reconstuction EO Rehabilitation 294 Maintenance 294 Maintenance 294 Miscellaneous EO 6-Mar-15 4203 5-Feb-15 10-Mar-15 26-Mar-15 15-May-15 25-Sep-15 U/SA 5702 10-Feb-15 10-Mar-15 26-Mar-15 22-May-15 14-Nov-15 U Wood Dale Rd bridge Over Elgin O'Hare Tollway 4640 3-Feb-15 10-Mar-15 26-Mar-15 26-May-15 20-Dec-16 B Lake St (US 20) to Meacham/Medinah Rd Rehabilitation 4647 11-Feb-15 12-Mar-15 26-Mar-15 26-May-15 30-Nov-15 B Building and Site Signage Maintenance Facility M1 @ I-294 4215 13-Feb-15 17-Mar-15 23-Apr-15 18-Jun-15 25-Sep-15 U Landscaping Maintenance Facility M1 @ I-294 4217 13-Feb-15 17-Mar-15 23-Apr-15 19-Jun-15 30-Oct-15 U/SA Cleaning & Sealing Bridge Decks / Pier Caps / MOT (MP 9.7 to 16.62) 5706 3-Mar-15 31-Mar-15 23-Apr-15 23-Jun-15 15-Nov-15 U Demolition EOWA Building Demolition 4649 2-Mar-15 31-Mar-15 23-Apr-15 26-Jun-15 31-Dec-18 U S/W Maitenance Bridge Cantilever Pier Cap Analysis and Strengthening (I-294, I-88, I-90 and I-355) 5708 9-Mar-15 2-Apr-15 23-Apr-15 23-Jun-15 18-Nov-15 U 88 Maintenance I-88 / I-47 Salt Dome & Disaster recovery Area Pavement Rprs 5664-3 18-Mar-15 7-Apr-15 23-Apr-15 15-Jun-15 15-Aug-15 U 90 ITS Smart Corridor / ITS 4227 11-Mar-15 9-Apr-15 23-Apr-15 23-Jun-15 15-Nov-16 B IDOT Miscellaneous IDOT Bid Letting S/W Maitenance Video Surveillance System UIC Call Center TBD(5681-1) 5-Mar-15 30-Apr-15 28-May-15 23-Jul-15 31-Dec-15 U 294 Drainage Drainage Str Clean and Televise I-294; MP 6.3 to 17.6 TBD(5681-3) 10-Mar-15 30-Apr-15 28-May-15 1-Aug-15 30-Nov-15 U 294 Rehabilitation Drainage Improvements ‐ Cermak Road 5694 2-Apr-15 30-Apr-15 28-May-15 24-Jul-15 18-Nov-16 U EO Reconstruction Park Bld to Arlington Hts Rd (Interchange & Retaining/Noise Wall) 4629 23-Mar-15 5-May-15 28-May-15 20-Jul-15 31-Aug-17 D S/W Facility M-14 Truck Scale TBD(9132-2B) 15-May-15 9-Jun-15 25-Jun-15 27-Aug-15 24-Dec-15 U EO Mainline work Mainline and Interchange Lively Blvd to IL 83 4644 28-Apr-15 9-Jun-15 25-Jun-15 20-Aug-15 30-Nov-17 C S/W Facility Replace Boiler and HVAC (Plz - 1,9,24,61 AND 75) Non-CRP TBD(9132-12B) 11-Jun-15 9-Jul-15 23-Jul-15 24-Sep-15 4-Jan-16 U Clean and Televise Drainage Str. @ MP 0 to 6.3 I-294 24-Apr-15 Note - A after the above dates notes the ACTUAL DATE of the event. Note - P after the above dates notes PENDING. Page 2 of 2 Report Run: 1/30/2015
© Copyright 2024