OUR VISION - Precision Survey

O U R V IS I O N
S
urvey at optimal quality whether it is Road or river, Rail
or Canal, Mines or Plant we are ahead of others. Deserve
the best position in view of employees and client not by
paper but by successful completion of commitments to client.
Drive innovative processes and systems, aided by technology to
provide overall clarity in both survey systems and construction
Company Profile
Systems including maintenance of plant.
O V E R VI EW
P
recision Survey Consultancy a journey to find the new horizon
in the system of survey since 2004. A few employees and
with a few instruments. After 4 years it is going to become a
milestone in the way of survey, whether it is the Road or River, Rail or
Canal, Mines or Plants with the 60 family members and utilization of
modern technologies. As the Quality of work is mature day by day,
affects the growing list of prideful clients.
The combined team consists of building services Engineers,
Company Directors, Facilities Managers and Construction Project
Managers.
The group can expand and contract to meet customer and project
demands via our own internal establishment of dedicated staff.
Company Profile
Our group is committed to delivering specialized services, intelligent
solutions and logical approaches to effectively assist employer /client
in the areas of operational compliance and services reliability as well as
support the optimal use of investment across their project.
S E R V I CE S
Precision Survey Consultancy operates multiple types of survey successfully such as:
LAND SURVEY. 
 TOPOGRAPHY SURVEY
 HYDROGRAPHIC SURVEY 
 TRANSMISSION LINE 
 ROAD SURVEY 
 RAIL SURVEY 
 ENGINEER SURVEY 
 SURFACE AND VOLUME MEASUREMENT AND DETAIL DESIGN 
 WATER SUPPLY AND SEWERAGE PROJECTS
 CONSTITUTION WORK AND BUILDING 
 CANAL SURVEY 

Company Profile
 MINING PROJECT 
O U R RE SO U RC E S
A sufficient numbers of effective engineers with other dedicated staffs as along
with modern machineries and updated software:
Man Power:
Sl. No.
1)
2)
3)
4)
5)
6)
7)
8)
Particulars
Quantity
Civil Engineer
Surveyor
Asst. Surveyor
Admin/Accountant
Purchaser
Office Assistance
Sales Officer
Auto CAD Draftsman
04 Nos.
30Nos.
35 Nos.
03 Nos.
02 Nos.
03 Nos.
02 Nos.
09 Nos.
Machineries: -
Quantity
06 nos.
33 Nos.
02 No.
06 Nos.
40 Nos.
02 Nos.
08 Nos.
02 nos.
1 no.
Company Profile
Sl. No.
Particulars
1. RTK/DGPS
2 Total Station
3 ECO – Sounder
4 Digital Theodolite
5 Auto Level
6 Digital Level
7 Hand GPS
8 Water Current Meter
9 Motorized Boat
Soft Ware:
1)
Auto CAD Civil 3D – 2010, 2011, 2012 & 2013
2)
Auto CAD LT - 2012
3)
Hypack
5)
C-Soft Wise image Pro ver12.x (AutoCAD & Window
version)
Power Navigation
6)
E – Survey CAD
7)
Civil Design
8)
Terramodel & Spectrum
9)
Map Source
Company Profile
4)
O U R C L IEN T S :
PWD
PHE Dte.
Howrah Irrigation
Division,
Company Profile
Farakka Barrage
Project
Others Clients:







Braithwaite Burn & Jessop (BBJ)
DHI
RusHydro International India Pvt. Ltd.
Jindal Steelness Steel.
Orissa Stevedores Ltd.
Ahluwalia Group Coal Mines Association
Makino Modern India Concast Godavari Group
Haldia Steel
Balaji Road System Ltd
MSPL Limited
Aditya Birla Group
Lancho Infratech Ltd.
McNally Bharat India Pvt. Ltd.
Knight Frank
Company Profile







*Topographical Survey:
Sl.
No.
Description of Work
Year of
Starting
Pattern of
Work
Remarks
1
“Topographical survey for preparation of
Sample command area plans (about 3500
ha.) of proposed Lower Orr Dam Project
for inclusion in the Detailed Project
Report of Ken- Betwa link project (Phase
–II) – reg.
Jaipur
Rajastan
2015
Topographical
Survey
Ongoing
2.
“Topographical survey of Submergence
area including river area (8200 ha approx)
of proposed Kotha Barrage on Betwa
river for inclusion in the Detailed Project
Report of proposed Ken-Betwa link
project (phase – II).
Gwalior,
MP
NWDA
2014
Topographical
Survey
Ongoing
3
“Preparation of land acquisition proposal
for improvement of the existing 3-legged
intersection on nh-60 AT 338 KM, in the
district of Birbhum, WB”.
Birbhum
(WB)
PWD
2014
Topographical
Survey
Ongoing
Jharkhand
BBJ
2014
Survey Work
Ongoing
Kolkata
WEBEL
2014
Topographical
Survey
Completed
2014
Topographical
Survey
Completed
2014
Topographical
Survey
Completed
Location
Principal Client
National Water
Development
Agency
(NWDA)
4
5
6
7
Work Including Layout Of
Alignment After Removal Of Earth And
Marking The Pile Points To Start The Pile
Driving, Checking Of Level Of Pile Cap,
Abutment, Return Wall Etc. And Also
Checking Of Level Of Road Deck And
Final Alignment Of Entire Stretch Of The
Rob Along With Formation And Road To
Be Constructed At Chaibasa Rob (No.
27b), Jharkhand.
Land Survey work for the Webel
Industrial Estate Complex (Approx. 7
acres) at P-1 Taratala Main Road,
Kolkata – 700 088.
“Preparation of Detail Survey Map with
total station process for the different Road
Crossing / Junction at Siliguri in the
district Darjeeling”.
“Detailed
topographic
survey
at
Panchayat Jhora landslide area, near
Rammam H.P, St-II, Darjeeling District
in 1 m contour interval.
Siliguri
Siliguri
North Bengal
Development
Department,
West Bengal
State Electricity
Distribution
Corporation
Limited
Company Profile
“Survey
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
8
"Road Network and Contour Survey work
for Water Supply scheme within Chakdaha
Municipality under UIDSSMT programe.
Chakdaha
(West
Bengal)
Chakdaha
Muncipality
2014
Topographical
Survey
Completed
WB
Howrah
Irrigation
Division
2014
Topographical
Survey
Completed
WB
Howrah
Irrigation
Division
2014
Topographical
Survey
Completed
WB
Lower Damodar
Construction
Division
(Irrigation)
2014
Topographical
Survey
Completed
12
Details survey and preparation of master
plan of the campus and individual plan,
elevation of different buildings of the
campus for CTRI Research Station,
Dinhata.
Siliguri
CPWD
2014
Topographical
Survey
Completed
13
Repairing and carpeting work of bitumen
roads at ERS of NDRI, Kalyani, Nadia. SH:
- Survey work for road sketch and
surrounding area of NDRI (Approx
575.126 m).
WB
CPWD
2014
Topographical
Survey
Completed
14
Carrying out survey work on & around
open land including preparation and
submission of survey drawing.
WB
CPWD
2014
Topographical
Survey
Completed
15
Restructuring and Renovation in Hertage
Buildings at kolkata ( Portion in possession
of
GSI) S.H:- Preparation Building
Internal plan of GSI building no. 27 &
29, Geological Survey of India at 29,
J.L.Nehru Road, Kolkata-16
WB
CPWD
2014
Topographical
Survey
Completed
9
10
11
Detail Topography Survey by using Total
station and G.P.S. system associated with
R.T.K. at different locations under
Domjur Block, Amta Block and
Udaynarayanpur
block
including
preparation of scheme Booklet with
supplying drawings both soft copy and in
A-0, A-I, A-II etc. size papers under
Trans Damodor Drainage Sub-Division of
Howrah Irrigation Division
Detailed Topographical Survey, Cross
Section & Long section using total station
and G.P.S. system associated with R.T.K. at
Champa Khal for the preparation of scheme
and supplying drawings both soft copy and
in A-0, A-1, A- II etc size papers under
Seijberia Irrigation Sub-Division of Howrah
Irrigation Division.
“Detailed Topographical Survey, Cross
section & Long Section using G.P.S.
system associated with R.T.K. along the
Shortcut Diversion Canal (From Zero Point
of Damodar to confluence point BUXI and
MUNDESHWARI) including preparation
and submission of Survey Drawings
including soft copy under LDC Sub Div.
No. –III, L.D.C. Division, Uluberia –
Howrah.
Company Profile
Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
16
Topographical Survey plan at Uttarbhag
Additional Pump House Compound at
Uttarbhag, P.S. Baruipur, Dist. –South 24
Parganas
WB
Howrah
Irrigation
Division
2014
Topographical
Survey
Completed
17
“Topographical & Hydrographical survey
of Intercepting channel at Chowbhaga
Pumping Station at Chowbhaga, ward no.
108 within P.S. Tiljala under office of the
Executive Engineer, Metropolitan Drainage
Division –II, during the year 2014-15
WB
Howrah
Irrigation
Division
2014
Topographical
Survey
Completed
18
Topographical, Hydraulic and Land
Acquisition survey for a stretch of NH-117
(from ch. 1.000km,to ch. 5.500 km),the
zero chainage point of the NH 117 is being
considered from the junction of the NH 6
and NH 117 erstwhile known as kona
Expressway Incorporation of the chage in
as built status reg.
Howrah
Public Works
Department
2013
Topographical
Survey
Completed
19
Schedule of Topographical Survey in
connection with construction of foot Over
Bridge at different road inter section within
kmc jurisdiction.
Kolkata
RITES LTD.
2013
Topographical
Survey
Completed
20
Topographical Survey at Mourigram
Kolkata
2013
Topographical
Survey
Completed
21
Total Station Contour Survey of IOCL
Haldia.
Haldia
2013
Topographical
Survey
Completed
15
Survey work in CMERI Colony Campus
Durgapur
2013
Topographical
Survey
Completed
16
Topographical Survey work at 75 acre
Sabujdweep island on the river Hooghly
near Balagarh in Hooghly District
Hooghly
Knight Frank
2013
Topographical
Survey
Completed
17
Total Station Survey of Alipore Zoo
Alipore
Zoological
Garden
2013
Topographical
Survey
Completed
18
Topographical Survey Drawing by using
Automatic Total Station (ATS) & Auto
Level for Campus of High Court, Calcutta
and its surrounding area.
Calcutta
Public Works
Department
2013
Topographical
Survey
Completed
19
Topographical Survey of the site for
proposed shifting of the South 24 Parganas
District Headquartert at Baruipur
Baruipur
Bengal Urban
Infrastructure
Development
Limited
(BUIDL)
2012
Topographical
Survey
Completed
Indian Oil
Corporation
Limited (IOCL)
Structech
Consulting
Engineers
(INDIA) Pvt.Ltd.
Central
Mechanical
Engineering
Research
Institute
(CMERI)
Company Profile
Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
20
Preparation of Topographical Survey plan
of Hajrat Data Mahabub Oli (RA) Shaah
Mazar
Sharif
Premises
at
Patharchapuri,Suri in the district of
Birbhum using Total Station & installation /
Construction of RCC control pillar along
property line of the premises in connection
with its development for providing brtter
amenities to the pilgrims.
Birbhum
West Bengal
Minorities
Development &
Finance
Corporation
2012
Topographical
Survey
Completed
21
Detail Topography Survey by using Total
Station & G.P.S. System associated with
R.T.K. at different location of Bally Jagacha Block and Domjur Block in P.S.Bally - Jagacha and Domjur for the
preparation of different drainage system
under RIDF - XVIII, Core Sector etc. under
Howrah Drainage Sub-Division of Howrah
Irrigation Division.
Howrah
Govt. Of West
Bengal
Howrah
Irrigation
Division
2012
Topographical
Survey
Completed
22
Topographical Surveys in Connection with
Basis Services For Urban Poor (BSUP)
Projects under RAY Scheme with a view to
interalia identify the beneficiaries and their
housing and infrastructure requirments.
Baruipur
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2012
Topographical
Survey
Completed
23
Survey work in operational area in
connection with New Hangars adjacent to
Air India Steel Hanger at NSCBI Airport,
Kolkata
Kolkata
Airports
Authority of
India (AAI)
2012
Topographical
Survey
Completed
24
Survey of total Land using Total Station
and Installation/Construction of RCC
Permanent Pillars along the boundary of the
land for Proposed ESI Hospital at Haldia
Haldia
ENGINEERING
PROJECTS
(INDIA) LTD.
2012
Topographical
Survey
Completed
2012
Topographical
Survey
Completed
2012
Topographical
Survey
Completed
2012
Topographical
Survey
Completed
25
Topographical Survey for 100 acres land at
Kalyani
Kalyani
26
Topographical Survey works of HRT for
Suntaley H.E. Project, East Sikkim
Sikkim
27
60 Nos. well site survey within Essar Oil
Ltd leasehold in Ranigunj CBM Block
Raniganj
West Bengal
Electronics
Industry
Development
Corporation
Limited
(WEBEL)
Govt. of India
Central Water
Commission
Sikkim
Investigation
Division
Essar Oil Limited
(E & P Division)
Company Profile
Sl.
No.
Description of Work
Year of
Starting
Pattern of
Work
Remarks
28
Survey Work at Diamond Harbour Road
Area
Kolkata
2012
Topographical
Survey
Completed
29
Topographical Survey Work in CMERI
Campus, Durgapur
Durgapur
2012
Topographical
Survey
Completed
30
Topographical Survey work at proposed
Industrial Prak of HCCI of 1000 acres at
Jagatballavpur
Jagatballav
pur
Bengal HCCI
Infrastructure Ltd
2011
Topographical
Survey
Completed
31
Topographical Survey for Preparation of
Comprehensive
Pollution
Abatement
Scheme
for
Howrah
Municipal
Corporation
Infrastructure
Professionals
Enterprises (P)
Ltd
Howrah
2011
Topographical
Survey
Completed
32
Topographical Survey at Behala Site,
Kolkata
Kolkata
2011
Topographical
Survey
Completed
33
Strengthening of main runway 19L-01R at
NSCBI Airport, Kolkata
Kolkata
2011
Topographical
Survey
Completed
34
Topographical Survey at Naginimora,
Village Lower Tiru, Dist. - Mon, Nagaland
Nagaland
2011
Topographical
Survey
Completed
35
Topography Survey of Land at Jangipara,
Dist. Hooghly
Jangipara
Howrah Mills Co
Ltd.
2011
Topographical
Survey
Completed
36
Surveying work at site, Baidyabati,Kolkata
Kolkata
SMS
Infrastructure
Limited.
2011
Topographical
Survey
Completed
37
Basic Services for the Urban Poor in Five
numbers Urban Local Bodies in Kolkata
Metropolitan Area under JNNURM
Kolkata
IL&FS
Infrastructure
Development
Corporation LTd
2011
Topographical
Survey
Completed
38
Completion of Topographical Survey of
Siliguri Municipal Corporation Area(Part)
and adjoining Area details of GAP Work of
Siliguri Municipal Corporation
Siliguri
Infrastructure
Professionals
Enterprises (P)
Ltd
2011
Topographical
Survey
Completed
39
Township at Gossainpur, Dist. Darjeeling,
for Conducting Land Survey
Darjeeling
Champion
Towers Private
Limited
2011
Topographical
Survey
Completed
Location
Principal Client
Kolkata
Environmental
Improvement
Project (KEIP)
Central
Mechanical
Engineering
Research
Institute
(CMERI)
Jain
Infrastructure
Limited.
Airports
Authority of
India (AAI)
Black Glod
Excavators (P)
Ltd.
Company Profile
Sl.
No.
Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
40
Complete Contour Survey for identified
area adjoining to IT Township at Uttarpara
Uttarpara,
Howrah
IL&FS
Infrastructure
Development
Corporation LTd
2010
Topographical
Survey
Completed
41
Preparation of RL contour map of entire
VMH premises at an interval of 10 M.
Kolkata
Victoria
Memorial Hall
2010
Topographical
Survey
Completed
42
Topographical Survry of Proposed Road
Connecting J.L. Nehru Road
Durgapur
2010
Topographical
Survey
Completed
2010
Topographical
Survey
Completed
2010
Topographical
Survey
Completed
Garia
IL&FS
Infrastructure
Development
Corporation LTd
2010
Topographical
Survey
Completed
Baruipur
IL&FS
Infrastructure
Development
Corporation LTd
2009
Topographical
Survey
Completed
2009
Topographical
Survey
Completed
43
44
Topographical Road Survey works in
different location under HDRP with
Howrah District
Topographical Survey of Canal Adjacent to
ther Boundary of IQ City Project at
Sovapur, Durgapur
Howrah
Durgapur
SPS Mani
Infrastructure
Pvt. Ltd.
Howrah
Improvement
Trust (HIT)
SPS Mani
Infrastructure
Pvt. Ltd.
46
Detailed Topographical Survey for
Sewerage Project at Baruipur Municipal
Area under JNNURM
47
Topographical Survey of 21 Wards of
Ranigunj Municipality Area covering 24.99
Sq.Km., for preparation of Detaild Project
report of Raniganj Drainage Project under
JNNURM Scheme.
Raniganj
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
48
Detail Topographical Survey work for
Nalanda Class Room Complex at IIT,
Kharagpur, B-Block
Kharagpur
Simplex
Infrastructures
Limited
2009
Topographical
Survey
Completed
49
Survey & Demarcation of Land area of
Martin Railway with Howrah District
Howrah
Howrah Zilla
Parishad
2007
Road Survey
Completed
50
Topographical and Contour Survey for
Drainage and Under Ground Sewerage
system within DMC under JNNURM
Project
Durgapur
Durgapur
Municipal
Corporation
(DMC)
2007
Topographical
Survey
Completed
Howrah
Kolkata
Metropolitan
Water &
Sanitation
Authority
(KMW&SA)
2007
Topographical
Survey
Completed
51
Topographical Survey work for Surface
water scheme for added area of HMC
Company Profile
45
Topographical Survey Showing Existing
Infrastructure Features.
52
Description of Work
Topographical Survey and Contour for
Drainage Plan for Raturia Angadpur area.
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
Raturia
Angadpur
Asansol
Durgapur
Development
Authority
(ADDA)
2007
Topographical
Survey
Completed
Company Profile
Sl.
No.
The Journey of Hydrographic Survey
List of Major Hydrographic / Bathymetric Projects
Description of Work
Location
Principal
Client
Year of
Starting
Pattern of
Work
Remarks
"Conducting
Cross
Sectional Survey of a
reach of Ganga River in
Sahibganj, Jharkhand"
Sahibganj,
Jharkhand
WAPCOS
2015
Hydrographic
Survey
Ongoing
2
Detail
hydrographic
Survey in NW-4 (South
Buckingham
Canal)
from Kalpakkam to
Puducherry (75 kms.).
Tamil Nadu
Inland
Authority Of
India
Waterways
2014
Hydrographic
Survey
Ongoing
3
“Detailed hydrographic
survey
in
North
Buckingham Canal (160
kms)
from
Peddaganjam
to
Krishnapatnam (NW-4).
Andhra
Pradesh
Inland
Waterways
Authority Of
India
2014
Hydrographic
Survey
Ongoing
4
“River Cross Section
Roorkee
Survey Work In Ganga
(Uttarakhand)
River.
National
Institute of
Hydrology
2014
Hydrographic
Survey
Ongoing
5
“River Cross Section
Roorkee
Survey
Work
In
(Uttarakhand)
Brahmaputra River.
National
Institute of
Hydrology
2014
Hydrographic
Survey
Ongoing
6
Conducting
Bathymetric Survey of
Motijhil
and
its
surrounding area in the
district
of
Murshidabad”
Total
Area: 51.75 hectors
(about).
West Bengal
Fisheries
Corporation
Ltd.
2014
Hydrographic
al Survey
Completed
1
South24PGS
(WB)
Company Profile
Sl.
No.
List of Major Hydrographic / Bathymetric Projects
Description of Work
7
Topographical Survey
work
including
preparation of long
section & cross section
levels in River Upper
Ilsurah under Hooghly
Irrigation Division.
8
Topographical Survey
work
including
preparation of long
section & cross section
levels in Soa Khal under
Hooghly
Irrigation
Division
9
10
(1)
Conducting
Bathymetric Survey in
front of movement area
at LCT Jetty and
passenger jetty at Lot
No.-8 from the shore
line of Lot No.-8 and
Hardwood
Point,
Kakdwip,
South
24Parganas.
(2)
Conducting
Bathymetric
Survey
Work of Chemaguri at
Sagar Island, Dist. 24
Parganas (S).
Hydrographic Survey of
pond of river Ganga
(including Topographic
survey of char land,
slopes and banks) 50Km
in
the
up-stream
(including 15Km upstream of confluence of
river
Fulhar
and
Ganga) and 15Km in
the down-stream of
Farakka Barrage.
Location
Principal
Client
Year of
Starting
Pattern of
Work
Remarks
West Bengal
Hooghly
Irrigation
Division
2014
Hydrographic
Survey
Completed
West Bengal
Hooghly
Irrigation
Division
2014
Hydrographic
Survey
Completed
Kakdwip,
S24PGS
West Bengal
Fisheries
Corporation
Ltd.
2014
Hydrographic
al Survey
Completed
Farakka
Murshidabad
Farakka
Barrage
Project
(Survey &
Investigation
Division)
2014
Hydrographic
Survey
Completed
Company Profile
Sl.
No.
List of Major Hydrographic / Bathymetric Projects
Sl.
No.
Description of Work
Location
Principal
Client
Year of
Starting
Pattern of
Work
11
Capacity Survey of 02
(Two) number Raw
Water Reservoirs.
Bakreswar
Thermal
Power Station
The West
Bengal Power
Development
Corporation
Ltd.
2013
Hydrographic
Survey
Howrah
(WB)
Suburban
Drainage
Division
(Irrigation)
Kakdwip,
S24PGS
13
14
15
16
"Conducting
Bathymetric Survey in
Bhanderdaha Beel, at
Akhriganj,
Bhagabangola
&
Jaiaganj,
Dist.Murshidabad" Length
is about 32.40 Km.
Hydrographic Survey /
Cross Section Survey at
different sites on River
Hooghly
under
Chinsurah
Irrigation
Sub Division of Hooghly
Irrigation Division.
Hydrographic
&
Topographic
Survey
work over Mundeswari
River at Udna, Hooghly
District.
Completed
2014
Hydrographic
Survey
Completed
West Bengal
Fisheries
Corporation
Ltd.
2014
Hydrographic
al Survey
Completed
Murshidabad
(WB)
West Bengal
Fisheries
Corporation
Ltd.
2014
Hydrographic
al Survey
Completed
Hooghly
Hooghly
Irrigation
Division
2014
Hydrographic
al Survey
Completed
Hooghly
Hooghly
Irrigation
Division
2014
Hydrographic
al Survey
Completed
Company Profile
12
Topographical
&
Hydrographic Survey
with traditional method
and "Total Station"
along Churial Main
Khal (17.80Km. Length)
and Churial Diversion
Khal (6.90Km. Length)
from the off-take and up
to the out-falling point
"Conducting
Bathymetric Survey in
Dal Beel Gangll at
Lalgola,
Dist.
Murshidabad,
total
15.700 Km.
Remarks
List of Major Hydrographic / Bathymetric Projects
17
18
19
20
Description of Work
(1)
Conducting
Bathymetric Survey in
front of movement area
at LCT Jetty and
passenger jetty at Lot
No.-8 from the shore
line of Lot No.-8 and
Hardwood
Point,
Kakdwip,
South
24Parganas.
(2)
Conducting
Bathymetric
Survey
Work of Chemaguri at
Sagar Island, Dist. 24
Parganas (S).
Recording Settlement of
Structures
by
total
station / Auto Level
Survey
within
the
Jurisdiction of SVB
Tollway situated at Toll
Plaza Building, VillBally, Durgapur, P.O.Samabayapally,
Howrah - 711205.
Detail
Topography
Survey
and
Hydrographic Survey at
different locations at the
right bank of Hooghly
River, Domjur Block,
Bali-Jagacha Block &
Printing charges of
Survey drawing and
other
documents
including supply of
documents necessary for
preparation of DPR.
Topographical
&
Hydrographical Survey
and related Jobs of
Nowi Khal Project in
and around Kolkata
and 24-Pargana District.
Location
Principal
Client
Year of
Starting
Pattern of
Work
Kakdwip,
S24PGS
West Bengal
Fisheries
Corporation
Ltd.
2013
Hydrographic
al Survey
Howrah
(WB)
Second
Vivekananda
Bridge
Tollway
Company
Private
Limited.
2013
Hydrographic
al Survey
Completed
Howrah
(WB)
Howrah
Irrigation
Division, I. &
W. Dte. (HID)
2013
Topographic
&
Hydrographic
al Survey
Completed
24Pgns Dist.
M.B.
Technosoft
Consultants
(P) Ltd.
2013
Hydrographic
al Survey
Completed
Remarks
Completed
Company Profile
Sl.
No.
List of Major Hydrographic / Bathymetric Projects
Sl.
No.
Description of Work
21
Carrying
out
Bathymetric
survey
work
along
Bank
protection works on
River
Gandak
at
Bishnupur Panchyath,
Gopalgunj in District
Bihar
Bishnupur
Panchyath,
Gopalgunj
Maccaferri
Environmenta
l Solutions
Pvt. Ltd.
2013
22
Hydrographic Survey at
Sabuj Dweep in District
Howrah
Sabuj Dweep,
Howrah
Irrigation &
Waterways
(Hooghly
Division)
2013
Hydrographic
al Survey
Completed
Howrah
Second
Vivekananda
Bridge
Tollway
Company
Private
Limited.
2013
Hydrographic
al Survey
Completed
Murshidabad
(WB)
Govt. of India
Ministry of
Water
Resources,
Farakka
Barrage
Project
2013
Hydrographic
al Survey
Completed
Kakdwip.
South 24 Pgs.
WEST
BENGAL
FISHERIES
CORPORATI
ON LTD.
2013
Hydrographic
al Survey
Completed
24
25
Conducting
Survey
work for improvement
of Entrence Channel of
Minor Fishing Harbour
at Harwood point.
Principal
Client
Year of
Starting
Pattern of
Work
Remarks
Hydrographic
al Survey
Completed
Company Profile
23
Work for detecting the
Scour Profile of two
Piers P3 & P4 of
Nivedita
Bridge
including finding the
scoured volume within
the jurisdiction of SVB
Tollway situated at Toll
Plaza Building
Hydrographic survey of
pond of River Ganga
(including topographic
survey of char land
,slopes
and
banks)
05km.Up-stream and 03
km. Downstream of
Farakka Barrage as per
direction of Engineer in
charge.
Location
List of Major Hydrographic / Bathymetric Projects
26
27
28
29
30
31
Description of Work
Hydrographic Survey
by using echo-sounder
machine,G.P.S.
&
Navigation software &
photography Survey by
using G.P.S. technology
associated with R.T.K
amchine, Total Station
and auto level at
different location of
right bank of River
Hoohgly and left bank
of River Rupnarayan
Including preparation
of drawing ,
Hydrographic Survey at
different location within
West Bengal
Hydrographic Survey of
RANGANADI
Reservoir
Cross Section Survey
for River Senger and
Korondia
Nala
at
Kanpur
Conducting
Bathymetric
survey
within within the area
LTC
jetty
and
passenger jetty at lot no
8 up to the deepest point
towards mod river along
with the shore line at
Hardwood
Point,Kakdwip.South 24
Pargananas
Bathymetric
Survey
within area outfall of
Dubda Canal where it is
falling at Bay of Bengal
Location
Principal
Client
Year of
Starting
Pattern of
Work
Remarks
Howrah
Howrah
Irrigation
Division (HID)
2012
Hydrographic
al Survey
Completed
2012
Hydrographic
al Survey
Completed
2013
Hydrographic
al Survey
Completed
2012
Hydrographic
al Survey
Completed
Kakdwip
WEST
BENGAL
FISHERIES
CORPORATI
ON LTD.
2012
Hydrographic
al Survey
Completed
Kakdwip
WEST
BENGAL
FISHERIES
CORPORATI
ON LTD.
2012
Hydrographic
al Survey
Completed
Howrah
Arunachal
Pradesh
Kanpur
Howrah
Irrigation
Division (HID)
North Eastern
Electric Power
Corporation
Limited
(NEEPCO)
DHI (India)
Water &
Environment
Pvt. Ltd.
Company Profile
Sl.
No.
List of Major Hydrographic / Bathymetric Projects
Sl.
No.
32
33
Description of Work
Hydrographic survey at
Kalyani Ganga river
(Hooghly river) and
Budge Budge Ganga
(Hooghly river) and
provision
of
Hydrological data
Cross Section Survey
Project for Vansadhara
River Project from
Gunupur to Kashinagar
Location
Principal
Client
Year of
Starting
Kolkata
SECON
PRIVATE
LIMITED.
2012
Orissa
DHI (India)
Water &
Environment
Pvt. Ltd.
Second
Vivekananda
Bridge
Tollway
Companhy
Private Ltd
Pattern of
Work
Remarks
Hydrographic
Completed
al Survey
2011
Hydrographic
al Survey
Completed
2011
Hydrographic
al Survey
Completed
Kolkata
35
Hydrographic Survey at
Mandermani River Site
Purba
Medinipur
Dredging &
Desiltation
Co. Pvt. Ltd.
2010
Hydrographic
al Survey
Completed
36
Survey works for our
Canal
rehabilitation
works at Churial Main
Canal, Package - 8 (In
between Ch: 6400 to
Ch: 14695)
Mahestala,
Kolkata
Dredging &
Desiltation
Co. Pvt. Ltd.
2008
Hydrographic
al Survey
Completed
Company Profile
34
Survey
work
for
assessing Scour at River
bed by Echo sounding
method of Main Bridge
Piers of SVB Project.
Road Survey:Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Chakdaha
Municipality
2014
Road Survey Completed
WBSRDA
2013
Road Survey
Completed
& DPR
PWD
(NH SURVEY
DIV. NO - II)
2012
Road Survey Completed
PWD
(NH SURVEY
DIV. NO - II)
2012
Road Survey Completed
PWD
(NH SURVEY
DIV. NO - II)
2012
Road Survey Completed
2012
Road Survey Completed
2012
Road Survey Completed
2011
Road Survey Completed
2010
Road Survey Completed
Remarks
1
2
3
4
5
Network and Contour Survey work for
Water Supply scheme within Chakdaha
WB
Municipality under UIDSSMT programe. Road
length -206 Km.
Preparation of Detailed Project Report (DPR)
of roads under 250+New Connectivity in
Bankura
respect of normal PMGSY road works in
different Blocks in the District of Bankura.
Topographical, hydraulic and Land Acquisition
survey for a stretch of NH-117 (from
Kolkata
Ch.1.000 Km. to Ch. 5.500 Km) Kona
Expressway
Topographical, hydraulic and Land Acquisition
survey for a stretch of NH-31C (from
Ch.224.500 Km. to Ch. 226.500 Km), Alipurduar
around the existing bridge over river Gadadhar
at Alipurduar, in the district of Jalpaiguri,W.B
Topographical, hydraulic and Land Acquisition
survey for preparation of Land Schedule,
Land Acquisition Cost Estimate along with
L.A.Drawing as per the format prescribed by Murshidabad
the MORT&H regarding Improvement of the
length of NH-80, Falling in the district of
Murshidabad W.B.
6
Topographical Survey of Rural Road under
PMGSY Scheme of Govt of India.
Malda
7
Topographical Survey of Rural Road under
PMGSY Scheme of Govt of India.
Siliguri &
Paschim
Midnapur
8
Gantak Road Project
Sikkim
9
Topographical Surveys showing existing
infrastructure features along the Right of Way
(ROW) on EM Bypass from Ultadanga to
Garia for a Length of 15.5 Km.
Kolkata
IL&FS
Infrastructure
Development
Corporation LTd
IL&FS
Infrastructure
Development
Corporation LTd
Brahmaputra
Infrastructure Ltd.
IL&FS
Infrastructure
Development
Corporation LTd
Company Profile
“Road
Location
Principal Client
Year of
Starting
Pattern of
Work
NH-34
Hindustan
Construction Co
Ltd (HCC)
2010
Road Survey Completed
Durgapur
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2009
Road Survey Completed
Proposed Trafffic Easing / Management
Measures for de-congestion of Benachetty
Nachan Road from Bhiringi More (on NH-2)
12
to Prantika in Durgapur and enhancing of
urban mobility within Durgapur City in Asansol
Urban Area under JNNURM
Durgapur
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2009
Road Survey Completed
Survey & Demarcation of Land area of Martin
Railway with Howrah District
Howrah
Howrah Zilla
Parishad
2009
Road Survey Completed
Asansol
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2009
Road Survey Completed
Kolkata
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2008
Road Survey Completed
Bengal Urban
Infrastructure
Development
Private Limited
(BUIDPL)
2008
Road Survey Completed
CES
Technologies
Private Limited
2008
Road Survey Completed
Description of Work
Topographical Survey for the stretch of
Farraka to Raiganj Section Ch+295.00 Kms
10
to 398.00 Kms. For NH-34 Project in all
respect in the state of West Bengal.
Topographical Survey along identified road
corridors in Durgapur City for development of
11
a Bus Rapid Transit System in Asansol Urban
Area under JNNURM.
13
Traffic Easing / Management Measures for
de-congestion of OLD G.T. Road and
14 enhancing of Urban mobility within Asansol
City in Asansol Urban Area in Asansol Urban
Area under JNNURM
Proposed widening of EM Bypass from
Ultadanga to Kamal Gazi for development of a
15
Bus Rapid Transit System (BRTS) under
JNNURM Scheme
Proposed Elevated road on Budge Budge
Trunk Road from Zhinjira Bazar to Batanagar
Budge Budge
16
More in South 24 Parganas District in KMA
area of PPP Basis
125 Sq. Km. Road Survey at Panagarh
Nadiha
Panagarh
Remarks
Company Profile
Sl.
No.
Description of Work
Detailed and quantitative survey with Pre and
17 Post Level with Total Station of about 20Km.
Road and around D.S.P. Township
Location
Principal Client
Year of
Starting
Pattern of
Work
Durgapur
M/s Decon India
2006
Road Survey Completed
Remarks
Company Profile
Sl.
No.
* Engineering Consultancy Survey:
Description of Work
Location
Principal Client
Year of
Starting
Kistwar, Jammu &
Kashmir
Larsen & Toubro
Limited
2013
Govt. of W.B.
North 24 Pgns.
W/S Division -II,
P.H.E.D.
2013
Engineering
Consultancy
Survey
On Going
2012
Engineering
Survey
On Going
2012
Engineering
Survey
On Going
2012
Engineering
Survey
On Going
1
Ratle Hydro Eletric Power Project
2
Topographical Survey work using
Total Station Theodolite along with
necessary Skilled/ Unskilled personnel,
Tools & Plants & Machinery all
complete for providing PHE Services
at Action Area - II of New Town
Kolkata Project.
Kolkata
3
Koradi Thermal Power Station
Nagpur
4
Deployment of survey CHP Phase
2,Sagardighi site.
5
6
7
8
9
Deployment of survey team with
necessary machinary & tools at pltcmBOKARO
3X660 MW Power Project ,
Talwandi Saboo,
GIS Power Station
Topographical Survey work using
Total Station Theodolite along with
necessary Skilled/ Unskilled personnel,
Tools & Plants & Machinery all
complete for providing PHE Services
at Action Area - II of New Town
Kolkata Project.
LE110063-IDCT & CHIMNEY
FOR 2X600 MW VISA POWER AT
RANIGARH
10 Rajpura Thermal Power
INDIAN OIL, CORPORATION LTD.
Paradeep Refinery
12 Survey work at site on hire basis to
check the co-ordinate points, levels
and make layouts for areas like CW
and ACW water line, BTG, lay down
11
Sagardighi,WB
Jharkand,Bokaro
Saboo
Kolkata
Larsen & Toubro
Limited
McNally Bharat
Engineering
Compaly Ltd.
McNally Bharat
Engineering
Compaly Ltd.
Larsen & Toubro
Limited
Larsen & Toubro
Limited
2012
2012
Pattern of
Work
Engineering
Survey
Engineering
Survey
Engineering
Survey
Remarks
On Going
On Going
On Going
Kolkata
Govt. of W.B.
North 24 Pgns. 2011W/S Division -II, 2014
P.H.E.D.
Engineering
Consultancy
Survey
Ongoing
Raigarh
Larsen & Toubro
Limited
Engineering
Survey
On Going
Rajpura
Paradeep
Larsen & Toubro
Limited
Larsen & Toubro
Limited
LANCO always
inspiring
2011
2011
2011
2011
Engineering
Survey
Engineering
Survey
Engineering
Survey
On Going
Completed
Completed
Company Profile
Sl.
No.
Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
areas, Fabrication yards and other
necessary required areas.
Durgapur
Kolkata
Kolkata
16 Topography Survey at Coke Oven
Jain Infraproject
Limited.
Jain Infraproject
Limited.
Govt. of
W.B.North 24
Pgns.W/S
Division -II,
P.H.E.D.
2011
2011
2011
JSL Stainless
LTd.
2011
Engineering
Survey
Engineering
Survey
Engineering
Consultancy
Survey
Engineering
Consultancy
Survey
Engineering
Survey
Engineering
Consultancy
Survey
Completed
Completed
Completed
Completed
17
Jaypee Nigrie Super Thermal Power
Plant
Singrauli
Larsen & Toubro
Limited
2010
18
Survey at 2x700MW Rajpura
Thermal Power Project ,
Patiala, Punjab
Larsen & Toubro
Limited
2010
MP
Larsen & Toubro
Limited
2010
Engineering
Survey
Completed
WB
Govt. of W.B.
North 24 Pgns.
W/S Division -II,
P.H.E.D.
2010
Engineering
Consultancy
Survey
Completed
IVRCL
Infrastructures &
Project Ltd.
2010
Engineering
Survey
Completed
Larsen & Toubro
Limited
2010
Engineering
Survey
Completed
19
20
21
22
Survey Works for 6X150 MW
structural steel works and chimney
works at Mahan Singrauli,MP
Topographical Survey work using
Total Station Theodolite along with
necessary Skilled/ Unskilled personnel,
Tools & Plants & Machinery all
complete for providing PHE Services
at Action Area - II of New Town
Kolkata Project.
Erection work for construction of
400KV D/C Tower Packages - A3
under Transmission system associated
with pallatana GBPP and Bangaigaon
TPS in North Eastern Region
Deployment of survey Team with
Machinaries & Tools on monthly
rental basis at 2X700 MW rajpura
Thermal Power Project, Rajpura, Dist
Patiala, Punjab
Punjab
On Going
Completed
Company Profile
Deployment of Survey Team with
machinery .
Survey Work at Box drain & different
14
pipe line stretches
Topographical Survey work using
Total Station Theodolite along with
necessary Skilled/ Unskilled personnel,
15 Tools & Plants & Machinery all
complete for providing PHE Services
at Action Area - II of New Town
Kolkata Project.
13
Description of Work
Construction of Integrated Passenger
23 Terminal Building at NSCBI
Airport,Kolkata
Geodetic and precision survey for
construction of Phase - II facilities and
24 other areas of Coke Oven Battery
No.4 complex of Visakhapatnam Steel
Plant.
25
Survey work for installing ROW pillars
along ROW line of SVB Project
Survey Work for 6X150 MW
26 structural steel work and chimney
work at Mahan Singrauli, MP
Survey work for DHAMRA Rail link
27
Project
Construction of Integrated Passenger
28 Terminal Building at NSCBI
Airport,Kolkata
Survey work at COBP Project at
29
Orissa
Survey team with total station for SMS
30
area.
31
Survey at Nalanda Class Room
Complex at IIT Kharagpur.B-Block .
Location
Principal Client
Year of
Starting
Pattern of
Work
Remarks
Kolkata
ITD-ITD CEM
JV.
2010
Engineering
Survey
Completed
Andrapradesh
Rashtiya Ispat
Nigam Limited
2010
Engineering
Consultancy
Survey
Completed
Kolkata
Second
Vivekananda
Bridge Tollway
Companhy
Private Ltd
2010
Engineering
Consultancy
Survey
Completed
MP
Larsen & Toubro
Limited
2010
Larsen & Toubro
Limited
2009
Kolkata
ITD-ITD CEM
JV.
2009
Orissa
JSL Limited.
2009
JINDAL
STAINLESS
Simplex
Kharagpur,WB
Infrastructures
Limited.
Govt. of W.B.
North 24 Pgns.
W/S Division -II,
New Town Kolkata
P.H.E.D.
Jajpur, Orissa
Topographical Survey work using
Total Station Theodolite along with
necessary Skilled/ Unskilled personnel,
32 Tools & Plants & Machinery all
complete for providing PHE Services
at Action Area - II of New Town
Kolkata Project.
Topographical Survey work using
Total Station Theodolite along with
Govt. of W.B.
necessary Skilled/ Unskilled personnel,
North 24 Pgns.
33 Tools & Plants & Machinery all New Town Kolkata
W/S Division -II,
complete for providing PHE Services
P.H.E.D.
at Action Area - II of New Town
Kolkata Project.
2009
Engineering
Consultancy
Survey
Engineering
Survey
Engineering
Survey
Engineering
Survey
Engineering
Survey
Completed
Completed
Completed
Completed
Completed
2009
Engineering
Survey
Completed
2009
Engineering
Consultancy
Survey
Completed
2008
Engineering
Consultancy
Survey
Completed
Company Profile
Sl.
No.
Description of Work
Location
Principal Client
Topographical Survey work using
Total Station Theodolite along with
Govt. of W.B.
necessary Skilled/ Unskilled personnel,
North 24 Pgns.
34 Tools & Plants & Machinery all New Town Kolkata
W/S Division -II,
complete for providing PHE Services
P.H.E.D.
at Action Area - II of New Town
Kolkata Project.
Survey work for Second Vivekananda
Larsen & Toubro
Kolkata
35 Bridge Project site at Dakhineshwar Limited
Kolkata
Construction of Integrated Passenger
ITD-ITD CEM
Kolkata
36 Terminal Building at NSCBI
JV.
Airport,Kolkata
Col Mines
Survey Work at Kol Dam Project in
Himachal Pradesh
Associated
37
Himachal Pradesh
Traders
Survey at SAIL Durgapur Steel Plant
Tecpro Systems
Durgapur
38 for the Project of Debottlenecking of
Limited.
RAW Material Handling Plant
Year of
Starting
Pattern of
Work
Remarks
2007
Engineering
Consultancy
Survey
Completed
2005
2004
2004
Engineering
Consultancy
Survey
Engineering
Consultancy
Survey
Engineering
Consultancy
Survey
Engineering
Consultancy
Survey
Completed
Completed
Completed
Completed
Company Profile
Sl.
No.
* Pipe Line Survey:
Sl.
No.
Description of Work
Location
Principal Client
Year of
Starting
Pattern
of Work
Remarks
Location
Principal Client
Year of
Starting
Pattern
of Work
Remarks
1
GPS survey work by RTK instrument for our
pipe line job of 8000.00mts. Approx from
Kahragpur
GOKULPUR to HIJLI station at
KHARAGPUR division Sourh Eastern Railway
McNally Bharat
engineering
Company Limited.
2013
Pipe Line
Survey
On Going
2
Route alignment suggestion best possible route
from Chandil Dam to Ranchi
Ranchi
HINDALCO
Industries Limited
2012
Pipe Line
Completed
Survey
3
Pipeline Route Survey for 8.625"
ODX28Km., IOCL ATF - Kolkata Pipeline
work from Mourigram Terminal to AFS
Gouripur
Kolkata
Harisons Industries
2011
Pipe Line
Completed
Survey
4
Layout Survey by Total Station at KMC
Pumping Station at Senpally Behala, Kolkata
Kolkata
Jain Infraprojects
Limited
2011
Pipe Line
Completed
Survey
5
Survey Work for Pipeline at DSP
Durgapur
Jain Infraprojects
Limited
2011
Pipe Line
Completed
Survey
6
Survey Work by using Total Station and other
related equipment for site area as per area
layout draing.
Durgapur
Jain Infraprojects
Limited
2011
Pipe Line
Completed
Survey
7
Pipeline Route Survey at Teesta River
Crossing, Sevok Bazar.
Sevok
Bazar
Harisons Industries
2010
Pipe Line
Completed
Survey
8
Reconnaissance and pipeline route survey work
for the section from Dankuni Coal Complex
to Receiving terminal (NH2/NH6 Junction).
Howrah
Greater Calcutta Gas
Supply Corporation
Ltd.
2007
Pipe Line
Completed
Survey
Description of Work
* Mining Survey:
Company Profile
Sl.
No.
Sl.
No.
1
2
3
4
5
Description of Work
Preparation of plans for Oting coal Mine of
Black Gold Excavators Pvt.Ltd
Contour / Grid Survey at Sharda OC
Mine, Sohagpur area SECL
Topographical Survey work
Topographical Survey of about 3.83
Sq.Km. (383 Hectors) in respect of Dumri
Coal Block, Dist. - Hazaribagh, Jharkhand
State.
Topographical Survey of Tiru Area (Upper
and Lower) in Nagaland
Location
Nagaland
MP
Principal Client
Black Gold
Excavators Pvt.Ltd
Cuprum Bagrodia
Limited
Year of
Starting
2012
2010
Pattern of
Work
Mining
Survey
Mining
Survey
Mining
Survey
Remarks
Completed
Completed
Nagaland
Tirucoal Project
2008
Completed
Jharkhand
Mahacol Trexim
Private Limited
2008
Mining
Survey
Completed
Nagaland
NCP Oting (JV)
2007
Mining
Survey
Completed
Principal Client
Year of
Starting
Pattern
of Work
Remarks
2012
Railway
Survey
Completed
2012
Metro
Railway
Survey
Completed
2011
Railway
Survey
Completed
ITD - ITD
Cementation India
Limited
2010
Railway
Survey
Completed
KEC International
Limited
2010
Railway
Survey
Completed
MBB Consultancy
Services Pvt. Ltd.
2009
Railway
Survey
Completed
Balaji Rail Road
Systems Limited
2009
Railway
Survey
Completed
Sl.
No.
Description of Work
1
Topographical Survey in connecting with
preparation of Feasibility Report for JSPL.
2
Execution of Survey Work for our joka BBD
Bag Metro Railway Project Site.
Kolkata
3
Survey of platforms in between BandelKatwa Station
Katwa
4
5
6
7
Location
GUA
Traversing & Traversing Calculation from
Phoolbagan to Central Metro Station (Total
Kolkata
Legnth of 6Km. Approx) including Drawing
Submission for KMRC:UG2
Detailed survey with the help of Total Station
between Tamluk (Junction cabin) and
Rajgoda Railway Station in Kharagpur Tamluk
Division of South Eastern Railway for a Total
length of 13.5Km
Topographical Survey for preparing
Engineering Plan of the proposed Private Raigarh,
siding of M/s Raigarh Coal Benification Pvt. Chattrishga
Ltd. near Robertson Railway Station, S.E.C.
r
Railway
Detailed Survey at Patratu by Total Station
Balaji Rail Road
Systems Limited
(BARSYL)
McNally Bharat
Engineering
Company Limited
Mesa NarulaGCC(JV)
(MNG)
Company Profile
* Railway Survey:
Sl.
No.
8
9
10
11
12
13
Description of Work
Location
Balaghat,M
P
Detail Survey of Railway Siding by total Tatanagar,
Station at Gamharia site
Jharkand
Detailed Survey for Chattibariatu &
Dehri On
Kerandari Coal Mines Railway siding project
Sone,Bihar
of NTPC Ltd.
Layout Survey and taking x-section of a pvt.
Railwar siding taking off from Tapsi-Barbani
Asansol
line of Asansol Division of ER by Total
Station.
Detailed Survey at GUA Railway station yard
GUA
by Total Station
Detailed Survey at ACC, Madhukunda Plant Madhukun
by Total Station
da
Railway siding Survey
14 Detailed Survey at Borojamda Site
Borojamda
Deatiled Survey at Barada Railway Yard by
Total Station
Deatiled Survey at Bolani Railway Yard by
16
Total Station
15
Barada
Bolani
Principal Client
Year of
Starting
Sova Ispat Limited
2008
Balaji Rail Road
Systems Limited
2008
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Balaji Rail Road
Systems Limited
Pattern
of Work
Railway
Survey
Railway
Survey
Completed
2008
Railway
Survey
Completed
2008
Railway
Survey
Completed
2008
2008
2007
2007
2007
Purulia,WB
Haldia Steels Ltd.
2006
Layout of Proposed Railway Track from take
18 off point to Buffer end of Shri Ramrupai
Balaji Steel Ltd. At Banskopa Durgapur
Durgapur
Jai Balaji Group
2006
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Railway
Survey
Completed
Pattern of
Work
Remarks
Company Profile
17 Railway siding by Total Station
Railway
Survey
Railway
Survey
Railway
Survey
Railway
Survey
Railway
Survey
Railway
Survey
Remarks
* HT Line Project:
Sl.
No.
Description of Work
Location
Area/
Length
Principal Client
Year of
Starting
1
Detail Survey of existing 132kv
D/C Transmission Line of DVC
from Kalipahari to BALCO
including submission of Route
Alignment Drawing,Profile Drawing
& Tower Scheduling.
2
Route Alignment Survey
3
4
Survey and soil investigation for
400kV D/C transmission line for
2x660MW STPP at Banka ,Bihar
400 KV D/C Tower PackagesA3 under Transmission System
associated with Pallatana GBPP
and Bongaigaon TPS in North
Eastern Region.
Durgapur
6.5 km.
DPSC Limited.
2013
Transmission
Line Survey
On Going
Ranchi
20.863
km.
Hindalco
Industries Limited
2012
Transmission
Line Survey
Completed
Bihar
29 km
L&T Construction
2012
Transmission
Line Survey
Completed
Bonga
15 km
IVRCL
Infrastructures &
Projects Ltd.
2010
Transmission
Line Survey
Completed
Year of
Starting
2012
Pattern of
Work
DGPS Survey
Completed
2012
GPS Survey
Completed
2011
DGPS Survey
Completed
2010
GPS Survey
Completed
2006
GPS Survey
Completed
2006
GPS Survey
Completed
* GPS Survey:
2
DGPS Control Point survry work
3
DGPS Point Process
GPS Point & Control Point fixing at entire
area of Kolkata Metro Railway Project
(East - West) between subhas sarovar and
Central Station Based for KMRC:UG2
4
Location
Principal Client
Nagaland
Zymax Technologies
Consulting Engineering
Services (INDIA) Private
Limited
Geosmart Technology
Salt Lake
(Kolkata)
Howrah
Kolkata
5
GPS Survey of Slum in Uttarpara Kotrang Municipality Area
Uttarpara
6
Gps Survey of Slum in Kalyani Municipality
area
Kalyani
ITD - ITD Cementation
India Limited
IL&FS Infrastructure
Development Corporation
LTd
IL&FS Infrastructure
Development Corporation
LTd
Remarks
Company Profile
Sl.
Description of Work
No.
1 20 nos of DGPS points fixing.
Others Completed Project List:
1)
Development of HINDALCO Factory at Muri.
2)
Kandra Steel Plant Development.
3)
Kol Dam Project in Himachal Pradesh.
4)
Chakdah-Bongan Road Project.
5)
South City at Kolkata.
6)
Railway siding development at Dadhapara Station.
7)
Railway siding development at Rupond Station.
8)
D.S.P. Township Road development Project.
9)
Tata Iron mines at Noamundi.
10) Monarchak Transmission Line Survey.
11) Railway siding development of ESL MINING LTD at Barbil.
12) DRDO Project at Nayagaon, Assam
13) NTPC 225 Flood Control Project at Farakka.
14) Existing Railway line development for HINDALCO at Hirakundh.
15) NEPAZE Steel Plant Development.
16) LAFARGE Cement Plant Development at Bhatapara.
17) OCL Railway siding development at Bayree.
18) HCL Railway siding development at Ghatsila.
19) Railway siding development at Durgapur.
20) BCCL out Sourcing Project at Dhanbad.
21) Railway siding development at Sri Ramrupai Balaji Steel Plant .
22) Railway siding development at Dadhapara Station.
23) Canal survey at chilka and RatnaJira river at Puri (Phase -I).
25) Proposed Water Treatment Plant survey at Nagpur, Jharsuguda, Koderma, Maithon,
Bhuj, Mejia for L&T.
26) Survey for proposed railway siding for NTPC at Hazaribag under BARSYL.
27) Plant survey of material handling system for Birla Cement at Durgapur.
28) Survey for fabrication and Batching plant of airport authority at Netaji Subhas Chandra
Bose Internationa Airport (NSCBIA), Kolkata under ITD Cementation Ltd.
29) Completion Bally Water Line Project.
30) Completion Topography survey for Kolkata Metro Railway from Central to Howrah
Maidan.
31) Topography survey of two stations one is SEALDAH & another one is Central Metro
Station under ITD.
32) Pillar Installation at metro related area under ITD.
33) Survey for new airport complex and runway at Netaji Subhas Chandra Bose
Company Profile
24) Rail Survey at different Private siding in CKP division under South Eastern Railway.
International Airport in Kolkata under ITD CEM JV.
34) Survey of canal at chilka and survey of Ratnajira River at Puri (Phase-II).
35) Survey at Thermal Power Plant of L&T Ltd. at Nagpur, Jharsuguda, Koderma, Maithon,
Bhuj, Mejia site.
36) Canal Survey at Mandermuni in Digha.
37) BRTS Road survey at Durgapur under BUIDL.
38) Detail Topography layout survey under HINDALCO Industries Limited.
39) Topographical survey at Bhadrakh Site under Larsen & Toubro.
40) Survey Project within Zone Command area including preparation data base and
drawing under Surface Water Based Water Supply Scheme in the arsenic affected areas
of S outh 24 Parganas District.
41) Collecting Horizontal Reference Point from i) cut & cover (subhas sarobar); ii) Phool
Bagan; iii) cross over; iv) Sealdah; v) Central station under ITD - ITD CEM JOINT
VENTUE.
42) Survey work under L&T at Rajmundrai Site.
43) Details survey at EM-Bypass relevant area
44) Rail survey work at Shantipur under Mesa Narula JV.
45) Kachrapara Municipality survey.
46) Sewerage Network survey work for the Kanchrapara, Kalyani, Champdani, Rishra,
Nabadeep, Krishnanagar municipalities under National Ganga River Basin Authority
(NGRBA).
Company Profile
47) Survey work at Barbil, Jharkhand under Global Industries.
C O N C L U SI O N
The list of client along with the work volume is increasing day to
day. Simultaneously the quality of work reflects by the satisfaction of
client. Precision Survey consultancy commit to the client to
Company Profile
provide the best service at all time.