O U R V IS I O N S urvey at optimal quality whether it is Road or river, Rail or Canal, Mines or Plant we are ahead of others. Deserve the best position in view of employees and client not by paper but by successful completion of commitments to client. Drive innovative processes and systems, aided by technology to provide overall clarity in both survey systems and construction Company Profile Systems including maintenance of plant. O V E R VI EW P recision Survey Consultancy a journey to find the new horizon in the system of survey since 2004. A few employees and with a few instruments. After 4 years it is going to become a milestone in the way of survey, whether it is the Road or River, Rail or Canal, Mines or Plants with the 60 family members and utilization of modern technologies. As the Quality of work is mature day by day, affects the growing list of prideful clients. The combined team consists of building services Engineers, Company Directors, Facilities Managers and Construction Project Managers. The group can expand and contract to meet customer and project demands via our own internal establishment of dedicated staff. Company Profile Our group is committed to delivering specialized services, intelligent solutions and logical approaches to effectively assist employer /client in the areas of operational compliance and services reliability as well as support the optimal use of investment across their project. S E R V I CE S Precision Survey Consultancy operates multiple types of survey successfully such as: LAND SURVEY. TOPOGRAPHY SURVEY HYDROGRAPHIC SURVEY TRANSMISSION LINE ROAD SURVEY RAIL SURVEY ENGINEER SURVEY SURFACE AND VOLUME MEASUREMENT AND DETAIL DESIGN WATER SUPPLY AND SEWERAGE PROJECTS CONSTITUTION WORK AND BUILDING CANAL SURVEY Company Profile MINING PROJECT O U R RE SO U RC E S A sufficient numbers of effective engineers with other dedicated staffs as along with modern machineries and updated software: Man Power: Sl. No. 1) 2) 3) 4) 5) 6) 7) 8) Particulars Quantity Civil Engineer Surveyor Asst. Surveyor Admin/Accountant Purchaser Office Assistance Sales Officer Auto CAD Draftsman 04 Nos. 30Nos. 35 Nos. 03 Nos. 02 Nos. 03 Nos. 02 Nos. 09 Nos. Machineries: - Quantity 06 nos. 33 Nos. 02 No. 06 Nos. 40 Nos. 02 Nos. 08 Nos. 02 nos. 1 no. Company Profile Sl. No. Particulars 1. RTK/DGPS 2 Total Station 3 ECO – Sounder 4 Digital Theodolite 5 Auto Level 6 Digital Level 7 Hand GPS 8 Water Current Meter 9 Motorized Boat Soft Ware: 1) Auto CAD Civil 3D – 2010, 2011, 2012 & 2013 2) Auto CAD LT - 2012 3) Hypack 5) C-Soft Wise image Pro ver12.x (AutoCAD & Window version) Power Navigation 6) E – Survey CAD 7) Civil Design 8) Terramodel & Spectrum 9) Map Source Company Profile 4) O U R C L IEN T S : PWD PHE Dte. Howrah Irrigation Division, Company Profile Farakka Barrage Project Others Clients: Braithwaite Burn & Jessop (BBJ) DHI RusHydro International India Pvt. Ltd. Jindal Steelness Steel. Orissa Stevedores Ltd. Ahluwalia Group Coal Mines Association Makino Modern India Concast Godavari Group Haldia Steel Balaji Road System Ltd MSPL Limited Aditya Birla Group Lancho Infratech Ltd. McNally Bharat India Pvt. Ltd. Knight Frank Company Profile *Topographical Survey: Sl. No. Description of Work Year of Starting Pattern of Work Remarks 1 “Topographical survey for preparation of Sample command area plans (about 3500 ha.) of proposed Lower Orr Dam Project for inclusion in the Detailed Project Report of Ken- Betwa link project (Phase –II) – reg. Jaipur Rajastan 2015 Topographical Survey Ongoing 2. “Topographical survey of Submergence area including river area (8200 ha approx) of proposed Kotha Barrage on Betwa river for inclusion in the Detailed Project Report of proposed Ken-Betwa link project (phase – II). Gwalior, MP NWDA 2014 Topographical Survey Ongoing 3 “Preparation of land acquisition proposal for improvement of the existing 3-legged intersection on nh-60 AT 338 KM, in the district of Birbhum, WB”. Birbhum (WB) PWD 2014 Topographical Survey Ongoing Jharkhand BBJ 2014 Survey Work Ongoing Kolkata WEBEL 2014 Topographical Survey Completed 2014 Topographical Survey Completed 2014 Topographical Survey Completed Location Principal Client National Water Development Agency (NWDA) 4 5 6 7 Work Including Layout Of Alignment After Removal Of Earth And Marking The Pile Points To Start The Pile Driving, Checking Of Level Of Pile Cap, Abutment, Return Wall Etc. And Also Checking Of Level Of Road Deck And Final Alignment Of Entire Stretch Of The Rob Along With Formation And Road To Be Constructed At Chaibasa Rob (No. 27b), Jharkhand. Land Survey work for the Webel Industrial Estate Complex (Approx. 7 acres) at P-1 Taratala Main Road, Kolkata – 700 088. “Preparation of Detail Survey Map with total station process for the different Road Crossing / Junction at Siliguri in the district Darjeeling”. “Detailed topographic survey at Panchayat Jhora landslide area, near Rammam H.P, St-II, Darjeeling District in 1 m contour interval. Siliguri Siliguri North Bengal Development Department, West Bengal State Electricity Distribution Corporation Limited Company Profile “Survey Description of Work Location Principal Client Year of Starting Pattern of Work Remarks 8 "Road Network and Contour Survey work for Water Supply scheme within Chakdaha Municipality under UIDSSMT programe. Chakdaha (West Bengal) Chakdaha Muncipality 2014 Topographical Survey Completed WB Howrah Irrigation Division 2014 Topographical Survey Completed WB Howrah Irrigation Division 2014 Topographical Survey Completed WB Lower Damodar Construction Division (Irrigation) 2014 Topographical Survey Completed 12 Details survey and preparation of master plan of the campus and individual plan, elevation of different buildings of the campus for CTRI Research Station, Dinhata. Siliguri CPWD 2014 Topographical Survey Completed 13 Repairing and carpeting work of bitumen roads at ERS of NDRI, Kalyani, Nadia. SH: - Survey work for road sketch and surrounding area of NDRI (Approx 575.126 m). WB CPWD 2014 Topographical Survey Completed 14 Carrying out survey work on & around open land including preparation and submission of survey drawing. WB CPWD 2014 Topographical Survey Completed 15 Restructuring and Renovation in Hertage Buildings at kolkata ( Portion in possession of GSI) S.H:- Preparation Building Internal plan of GSI building no. 27 & 29, Geological Survey of India at 29, J.L.Nehru Road, Kolkata-16 WB CPWD 2014 Topographical Survey Completed 9 10 11 Detail Topography Survey by using Total station and G.P.S. system associated with R.T.K. at different locations under Domjur Block, Amta Block and Udaynarayanpur block including preparation of scheme Booklet with supplying drawings both soft copy and in A-0, A-I, A-II etc. size papers under Trans Damodor Drainage Sub-Division of Howrah Irrigation Division Detailed Topographical Survey, Cross Section & Long section using total station and G.P.S. system associated with R.T.K. at Champa Khal for the preparation of scheme and supplying drawings both soft copy and in A-0, A-1, A- II etc size papers under Seijberia Irrigation Sub-Division of Howrah Irrigation Division. “Detailed Topographical Survey, Cross section & Long Section using G.P.S. system associated with R.T.K. along the Shortcut Diversion Canal (From Zero Point of Damodar to confluence point BUXI and MUNDESHWARI) including preparation and submission of Survey Drawings including soft copy under LDC Sub Div. No. –III, L.D.C. Division, Uluberia – Howrah. Company Profile Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Remarks 16 Topographical Survey plan at Uttarbhag Additional Pump House Compound at Uttarbhag, P.S. Baruipur, Dist. –South 24 Parganas WB Howrah Irrigation Division 2014 Topographical Survey Completed 17 “Topographical & Hydrographical survey of Intercepting channel at Chowbhaga Pumping Station at Chowbhaga, ward no. 108 within P.S. Tiljala under office of the Executive Engineer, Metropolitan Drainage Division –II, during the year 2014-15 WB Howrah Irrigation Division 2014 Topographical Survey Completed 18 Topographical, Hydraulic and Land Acquisition survey for a stretch of NH-117 (from ch. 1.000km,to ch. 5.500 km),the zero chainage point of the NH 117 is being considered from the junction of the NH 6 and NH 117 erstwhile known as kona Expressway Incorporation of the chage in as built status reg. Howrah Public Works Department 2013 Topographical Survey Completed 19 Schedule of Topographical Survey in connection with construction of foot Over Bridge at different road inter section within kmc jurisdiction. Kolkata RITES LTD. 2013 Topographical Survey Completed 20 Topographical Survey at Mourigram Kolkata 2013 Topographical Survey Completed 21 Total Station Contour Survey of IOCL Haldia. Haldia 2013 Topographical Survey Completed 15 Survey work in CMERI Colony Campus Durgapur 2013 Topographical Survey Completed 16 Topographical Survey work at 75 acre Sabujdweep island on the river Hooghly near Balagarh in Hooghly District Hooghly Knight Frank 2013 Topographical Survey Completed 17 Total Station Survey of Alipore Zoo Alipore Zoological Garden 2013 Topographical Survey Completed 18 Topographical Survey Drawing by using Automatic Total Station (ATS) & Auto Level for Campus of High Court, Calcutta and its surrounding area. Calcutta Public Works Department 2013 Topographical Survey Completed 19 Topographical Survey of the site for proposed shifting of the South 24 Parganas District Headquartert at Baruipur Baruipur Bengal Urban Infrastructure Development Limited (BUIDL) 2012 Topographical Survey Completed Indian Oil Corporation Limited (IOCL) Structech Consulting Engineers (INDIA) Pvt.Ltd. Central Mechanical Engineering Research Institute (CMERI) Company Profile Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Remarks 20 Preparation of Topographical Survey plan of Hajrat Data Mahabub Oli (RA) Shaah Mazar Sharif Premises at Patharchapuri,Suri in the district of Birbhum using Total Station & installation / Construction of RCC control pillar along property line of the premises in connection with its development for providing brtter amenities to the pilgrims. Birbhum West Bengal Minorities Development & Finance Corporation 2012 Topographical Survey Completed 21 Detail Topography Survey by using Total Station & G.P.S. System associated with R.T.K. at different location of Bally Jagacha Block and Domjur Block in P.S.Bally - Jagacha and Domjur for the preparation of different drainage system under RIDF - XVIII, Core Sector etc. under Howrah Drainage Sub-Division of Howrah Irrigation Division. Howrah Govt. Of West Bengal Howrah Irrigation Division 2012 Topographical Survey Completed 22 Topographical Surveys in Connection with Basis Services For Urban Poor (BSUP) Projects under RAY Scheme with a view to interalia identify the beneficiaries and their housing and infrastructure requirments. Baruipur Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2012 Topographical Survey Completed 23 Survey work in operational area in connection with New Hangars adjacent to Air India Steel Hanger at NSCBI Airport, Kolkata Kolkata Airports Authority of India (AAI) 2012 Topographical Survey Completed 24 Survey of total Land using Total Station and Installation/Construction of RCC Permanent Pillars along the boundary of the land for Proposed ESI Hospital at Haldia Haldia ENGINEERING PROJECTS (INDIA) LTD. 2012 Topographical Survey Completed 2012 Topographical Survey Completed 2012 Topographical Survey Completed 2012 Topographical Survey Completed 25 Topographical Survey for 100 acres land at Kalyani Kalyani 26 Topographical Survey works of HRT for Suntaley H.E. Project, East Sikkim Sikkim 27 60 Nos. well site survey within Essar Oil Ltd leasehold in Ranigunj CBM Block Raniganj West Bengal Electronics Industry Development Corporation Limited (WEBEL) Govt. of India Central Water Commission Sikkim Investigation Division Essar Oil Limited (E & P Division) Company Profile Sl. No. Description of Work Year of Starting Pattern of Work Remarks 28 Survey Work at Diamond Harbour Road Area Kolkata 2012 Topographical Survey Completed 29 Topographical Survey Work in CMERI Campus, Durgapur Durgapur 2012 Topographical Survey Completed 30 Topographical Survey work at proposed Industrial Prak of HCCI of 1000 acres at Jagatballavpur Jagatballav pur Bengal HCCI Infrastructure Ltd 2011 Topographical Survey Completed 31 Topographical Survey for Preparation of Comprehensive Pollution Abatement Scheme for Howrah Municipal Corporation Infrastructure Professionals Enterprises (P) Ltd Howrah 2011 Topographical Survey Completed 32 Topographical Survey at Behala Site, Kolkata Kolkata 2011 Topographical Survey Completed 33 Strengthening of main runway 19L-01R at NSCBI Airport, Kolkata Kolkata 2011 Topographical Survey Completed 34 Topographical Survey at Naginimora, Village Lower Tiru, Dist. - Mon, Nagaland Nagaland 2011 Topographical Survey Completed 35 Topography Survey of Land at Jangipara, Dist. Hooghly Jangipara Howrah Mills Co Ltd. 2011 Topographical Survey Completed 36 Surveying work at site, Baidyabati,Kolkata Kolkata SMS Infrastructure Limited. 2011 Topographical Survey Completed 37 Basic Services for the Urban Poor in Five numbers Urban Local Bodies in Kolkata Metropolitan Area under JNNURM Kolkata IL&FS Infrastructure Development Corporation LTd 2011 Topographical Survey Completed 38 Completion of Topographical Survey of Siliguri Municipal Corporation Area(Part) and adjoining Area details of GAP Work of Siliguri Municipal Corporation Siliguri Infrastructure Professionals Enterprises (P) Ltd 2011 Topographical Survey Completed 39 Township at Gossainpur, Dist. Darjeeling, for Conducting Land Survey Darjeeling Champion Towers Private Limited 2011 Topographical Survey Completed Location Principal Client Kolkata Environmental Improvement Project (KEIP) Central Mechanical Engineering Research Institute (CMERI) Jain Infrastructure Limited. Airports Authority of India (AAI) Black Glod Excavators (P) Ltd. Company Profile Sl. No. Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Remarks 40 Complete Contour Survey for identified area adjoining to IT Township at Uttarpara Uttarpara, Howrah IL&FS Infrastructure Development Corporation LTd 2010 Topographical Survey Completed 41 Preparation of RL contour map of entire VMH premises at an interval of 10 M. Kolkata Victoria Memorial Hall 2010 Topographical Survey Completed 42 Topographical Survry of Proposed Road Connecting J.L. Nehru Road Durgapur 2010 Topographical Survey Completed 2010 Topographical Survey Completed 2010 Topographical Survey Completed Garia IL&FS Infrastructure Development Corporation LTd 2010 Topographical Survey Completed Baruipur IL&FS Infrastructure Development Corporation LTd 2009 Topographical Survey Completed 2009 Topographical Survey Completed 43 44 Topographical Road Survey works in different location under HDRP with Howrah District Topographical Survey of Canal Adjacent to ther Boundary of IQ City Project at Sovapur, Durgapur Howrah Durgapur SPS Mani Infrastructure Pvt. Ltd. Howrah Improvement Trust (HIT) SPS Mani Infrastructure Pvt. Ltd. 46 Detailed Topographical Survey for Sewerage Project at Baruipur Municipal Area under JNNURM 47 Topographical Survey of 21 Wards of Ranigunj Municipality Area covering 24.99 Sq.Km., for preparation of Detaild Project report of Raniganj Drainage Project under JNNURM Scheme. Raniganj Bengal Urban Infrastructure Development Private Limited (BUIDPL) 48 Detail Topographical Survey work for Nalanda Class Room Complex at IIT, Kharagpur, B-Block Kharagpur Simplex Infrastructures Limited 2009 Topographical Survey Completed 49 Survey & Demarcation of Land area of Martin Railway with Howrah District Howrah Howrah Zilla Parishad 2007 Road Survey Completed 50 Topographical and Contour Survey for Drainage and Under Ground Sewerage system within DMC under JNNURM Project Durgapur Durgapur Municipal Corporation (DMC) 2007 Topographical Survey Completed Howrah Kolkata Metropolitan Water & Sanitation Authority (KMW&SA) 2007 Topographical Survey Completed 51 Topographical Survey work for Surface water scheme for added area of HMC Company Profile 45 Topographical Survey Showing Existing Infrastructure Features. 52 Description of Work Topographical Survey and Contour for Drainage Plan for Raturia Angadpur area. Location Principal Client Year of Starting Pattern of Work Remarks Raturia Angadpur Asansol Durgapur Development Authority (ADDA) 2007 Topographical Survey Completed Company Profile Sl. No. The Journey of Hydrographic Survey List of Major Hydrographic / Bathymetric Projects Description of Work Location Principal Client Year of Starting Pattern of Work Remarks "Conducting Cross Sectional Survey of a reach of Ganga River in Sahibganj, Jharkhand" Sahibganj, Jharkhand WAPCOS 2015 Hydrographic Survey Ongoing 2 Detail hydrographic Survey in NW-4 (South Buckingham Canal) from Kalpakkam to Puducherry (75 kms.). Tamil Nadu Inland Authority Of India Waterways 2014 Hydrographic Survey Ongoing 3 “Detailed hydrographic survey in North Buckingham Canal (160 kms) from Peddaganjam to Krishnapatnam (NW-4). Andhra Pradesh Inland Waterways Authority Of India 2014 Hydrographic Survey Ongoing 4 “River Cross Section Roorkee Survey Work In Ganga (Uttarakhand) River. National Institute of Hydrology 2014 Hydrographic Survey Ongoing 5 “River Cross Section Roorkee Survey Work In (Uttarakhand) Brahmaputra River. National Institute of Hydrology 2014 Hydrographic Survey Ongoing 6 Conducting Bathymetric Survey of Motijhil and its surrounding area in the district of Murshidabad” Total Area: 51.75 hectors (about). West Bengal Fisheries Corporation Ltd. 2014 Hydrographic al Survey Completed 1 South24PGS (WB) Company Profile Sl. No. List of Major Hydrographic / Bathymetric Projects Description of Work 7 Topographical Survey work including preparation of long section & cross section levels in River Upper Ilsurah under Hooghly Irrigation Division. 8 Topographical Survey work including preparation of long section & cross section levels in Soa Khal under Hooghly Irrigation Division 9 10 (1) Conducting Bathymetric Survey in front of movement area at LCT Jetty and passenger jetty at Lot No.-8 from the shore line of Lot No.-8 and Hardwood Point, Kakdwip, South 24Parganas. (2) Conducting Bathymetric Survey Work of Chemaguri at Sagar Island, Dist. 24 Parganas (S). Hydrographic Survey of pond of river Ganga (including Topographic survey of char land, slopes and banks) 50Km in the up-stream (including 15Km upstream of confluence of river Fulhar and Ganga) and 15Km in the down-stream of Farakka Barrage. Location Principal Client Year of Starting Pattern of Work Remarks West Bengal Hooghly Irrigation Division 2014 Hydrographic Survey Completed West Bengal Hooghly Irrigation Division 2014 Hydrographic Survey Completed Kakdwip, S24PGS West Bengal Fisheries Corporation Ltd. 2014 Hydrographic al Survey Completed Farakka Murshidabad Farakka Barrage Project (Survey & Investigation Division) 2014 Hydrographic Survey Completed Company Profile Sl. No. List of Major Hydrographic / Bathymetric Projects Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work 11 Capacity Survey of 02 (Two) number Raw Water Reservoirs. Bakreswar Thermal Power Station The West Bengal Power Development Corporation Ltd. 2013 Hydrographic Survey Howrah (WB) Suburban Drainage Division (Irrigation) Kakdwip, S24PGS 13 14 15 16 "Conducting Bathymetric Survey in Bhanderdaha Beel, at Akhriganj, Bhagabangola & Jaiaganj, Dist.Murshidabad" Length is about 32.40 Km. Hydrographic Survey / Cross Section Survey at different sites on River Hooghly under Chinsurah Irrigation Sub Division of Hooghly Irrigation Division. Hydrographic & Topographic Survey work over Mundeswari River at Udna, Hooghly District. Completed 2014 Hydrographic Survey Completed West Bengal Fisheries Corporation Ltd. 2014 Hydrographic al Survey Completed Murshidabad (WB) West Bengal Fisheries Corporation Ltd. 2014 Hydrographic al Survey Completed Hooghly Hooghly Irrigation Division 2014 Hydrographic al Survey Completed Hooghly Hooghly Irrigation Division 2014 Hydrographic al Survey Completed Company Profile 12 Topographical & Hydrographic Survey with traditional method and "Total Station" along Churial Main Khal (17.80Km. Length) and Churial Diversion Khal (6.90Km. Length) from the off-take and up to the out-falling point "Conducting Bathymetric Survey in Dal Beel Gangll at Lalgola, Dist. Murshidabad, total 15.700 Km. Remarks List of Major Hydrographic / Bathymetric Projects 17 18 19 20 Description of Work (1) Conducting Bathymetric Survey in front of movement area at LCT Jetty and passenger jetty at Lot No.-8 from the shore line of Lot No.-8 and Hardwood Point, Kakdwip, South 24Parganas. (2) Conducting Bathymetric Survey Work of Chemaguri at Sagar Island, Dist. 24 Parganas (S). Recording Settlement of Structures by total station / Auto Level Survey within the Jurisdiction of SVB Tollway situated at Toll Plaza Building, VillBally, Durgapur, P.O.Samabayapally, Howrah - 711205. Detail Topography Survey and Hydrographic Survey at different locations at the right bank of Hooghly River, Domjur Block, Bali-Jagacha Block & Printing charges of Survey drawing and other documents including supply of documents necessary for preparation of DPR. Topographical & Hydrographical Survey and related Jobs of Nowi Khal Project in and around Kolkata and 24-Pargana District. Location Principal Client Year of Starting Pattern of Work Kakdwip, S24PGS West Bengal Fisheries Corporation Ltd. 2013 Hydrographic al Survey Howrah (WB) Second Vivekananda Bridge Tollway Company Private Limited. 2013 Hydrographic al Survey Completed Howrah (WB) Howrah Irrigation Division, I. & W. Dte. (HID) 2013 Topographic & Hydrographic al Survey Completed 24Pgns Dist. M.B. Technosoft Consultants (P) Ltd. 2013 Hydrographic al Survey Completed Remarks Completed Company Profile Sl. No. List of Major Hydrographic / Bathymetric Projects Sl. No. Description of Work 21 Carrying out Bathymetric survey work along Bank protection works on River Gandak at Bishnupur Panchyath, Gopalgunj in District Bihar Bishnupur Panchyath, Gopalgunj Maccaferri Environmenta l Solutions Pvt. Ltd. 2013 22 Hydrographic Survey at Sabuj Dweep in District Howrah Sabuj Dweep, Howrah Irrigation & Waterways (Hooghly Division) 2013 Hydrographic al Survey Completed Howrah Second Vivekananda Bridge Tollway Company Private Limited. 2013 Hydrographic al Survey Completed Murshidabad (WB) Govt. of India Ministry of Water Resources, Farakka Barrage Project 2013 Hydrographic al Survey Completed Kakdwip. South 24 Pgs. WEST BENGAL FISHERIES CORPORATI ON LTD. 2013 Hydrographic al Survey Completed 24 25 Conducting Survey work for improvement of Entrence Channel of Minor Fishing Harbour at Harwood point. Principal Client Year of Starting Pattern of Work Remarks Hydrographic al Survey Completed Company Profile 23 Work for detecting the Scour Profile of two Piers P3 & P4 of Nivedita Bridge including finding the scoured volume within the jurisdiction of SVB Tollway situated at Toll Plaza Building Hydrographic survey of pond of River Ganga (including topographic survey of char land ,slopes and banks) 05km.Up-stream and 03 km. Downstream of Farakka Barrage as per direction of Engineer in charge. Location List of Major Hydrographic / Bathymetric Projects 26 27 28 29 30 31 Description of Work Hydrographic Survey by using echo-sounder machine,G.P.S. & Navigation software & photography Survey by using G.P.S. technology associated with R.T.K amchine, Total Station and auto level at different location of right bank of River Hoohgly and left bank of River Rupnarayan Including preparation of drawing , Hydrographic Survey at different location within West Bengal Hydrographic Survey of RANGANADI Reservoir Cross Section Survey for River Senger and Korondia Nala at Kanpur Conducting Bathymetric survey within within the area LTC jetty and passenger jetty at lot no 8 up to the deepest point towards mod river along with the shore line at Hardwood Point,Kakdwip.South 24 Pargananas Bathymetric Survey within area outfall of Dubda Canal where it is falling at Bay of Bengal Location Principal Client Year of Starting Pattern of Work Remarks Howrah Howrah Irrigation Division (HID) 2012 Hydrographic al Survey Completed 2012 Hydrographic al Survey Completed 2013 Hydrographic al Survey Completed 2012 Hydrographic al Survey Completed Kakdwip WEST BENGAL FISHERIES CORPORATI ON LTD. 2012 Hydrographic al Survey Completed Kakdwip WEST BENGAL FISHERIES CORPORATI ON LTD. 2012 Hydrographic al Survey Completed Howrah Arunachal Pradesh Kanpur Howrah Irrigation Division (HID) North Eastern Electric Power Corporation Limited (NEEPCO) DHI (India) Water & Environment Pvt. Ltd. Company Profile Sl. No. List of Major Hydrographic / Bathymetric Projects Sl. No. 32 33 Description of Work Hydrographic survey at Kalyani Ganga river (Hooghly river) and Budge Budge Ganga (Hooghly river) and provision of Hydrological data Cross Section Survey Project for Vansadhara River Project from Gunupur to Kashinagar Location Principal Client Year of Starting Kolkata SECON PRIVATE LIMITED. 2012 Orissa DHI (India) Water & Environment Pvt. Ltd. Second Vivekananda Bridge Tollway Companhy Private Ltd Pattern of Work Remarks Hydrographic Completed al Survey 2011 Hydrographic al Survey Completed 2011 Hydrographic al Survey Completed Kolkata 35 Hydrographic Survey at Mandermani River Site Purba Medinipur Dredging & Desiltation Co. Pvt. Ltd. 2010 Hydrographic al Survey Completed 36 Survey works for our Canal rehabilitation works at Churial Main Canal, Package - 8 (In between Ch: 6400 to Ch: 14695) Mahestala, Kolkata Dredging & Desiltation Co. Pvt. Ltd. 2008 Hydrographic al Survey Completed Company Profile 34 Survey work for assessing Scour at River bed by Echo sounding method of Main Bridge Piers of SVB Project. Road Survey:Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Chakdaha Municipality 2014 Road Survey Completed WBSRDA 2013 Road Survey Completed & DPR PWD (NH SURVEY DIV. NO - II) 2012 Road Survey Completed PWD (NH SURVEY DIV. NO - II) 2012 Road Survey Completed PWD (NH SURVEY DIV. NO - II) 2012 Road Survey Completed 2012 Road Survey Completed 2012 Road Survey Completed 2011 Road Survey Completed 2010 Road Survey Completed Remarks 1 2 3 4 5 Network and Contour Survey work for Water Supply scheme within Chakdaha WB Municipality under UIDSSMT programe. Road length -206 Km. Preparation of Detailed Project Report (DPR) of roads under 250+New Connectivity in Bankura respect of normal PMGSY road works in different Blocks in the District of Bankura. Topographical, hydraulic and Land Acquisition survey for a stretch of NH-117 (from Kolkata Ch.1.000 Km. to Ch. 5.500 Km) Kona Expressway Topographical, hydraulic and Land Acquisition survey for a stretch of NH-31C (from Ch.224.500 Km. to Ch. 226.500 Km), Alipurduar around the existing bridge over river Gadadhar at Alipurduar, in the district of Jalpaiguri,W.B Topographical, hydraulic and Land Acquisition survey for preparation of Land Schedule, Land Acquisition Cost Estimate along with L.A.Drawing as per the format prescribed by Murshidabad the MORT&H regarding Improvement of the length of NH-80, Falling in the district of Murshidabad W.B. 6 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Malda 7 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Siliguri & Paschim Midnapur 8 Gantak Road Project Sikkim 9 Topographical Surveys showing existing infrastructure features along the Right of Way (ROW) on EM Bypass from Ultadanga to Garia for a Length of 15.5 Km. Kolkata IL&FS Infrastructure Development Corporation LTd IL&FS Infrastructure Development Corporation LTd Brahmaputra Infrastructure Ltd. IL&FS Infrastructure Development Corporation LTd Company Profile “Road Location Principal Client Year of Starting Pattern of Work NH-34 Hindustan Construction Co Ltd (HCC) 2010 Road Survey Completed Durgapur Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2009 Road Survey Completed Proposed Trafffic Easing / Management Measures for de-congestion of Benachetty Nachan Road from Bhiringi More (on NH-2) 12 to Prantika in Durgapur and enhancing of urban mobility within Durgapur City in Asansol Urban Area under JNNURM Durgapur Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2009 Road Survey Completed Survey & Demarcation of Land area of Martin Railway with Howrah District Howrah Howrah Zilla Parishad 2009 Road Survey Completed Asansol Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2009 Road Survey Completed Kolkata Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2008 Road Survey Completed Bengal Urban Infrastructure Development Private Limited (BUIDPL) 2008 Road Survey Completed CES Technologies Private Limited 2008 Road Survey Completed Description of Work Topographical Survey for the stretch of Farraka to Raiganj Section Ch+295.00 Kms 10 to 398.00 Kms. For NH-34 Project in all respect in the state of West Bengal. Topographical Survey along identified road corridors in Durgapur City for development of 11 a Bus Rapid Transit System in Asansol Urban Area under JNNURM. 13 Traffic Easing / Management Measures for de-congestion of OLD G.T. Road and 14 enhancing of Urban mobility within Asansol City in Asansol Urban Area in Asansol Urban Area under JNNURM Proposed widening of EM Bypass from Ultadanga to Kamal Gazi for development of a 15 Bus Rapid Transit System (BRTS) under JNNURM Scheme Proposed Elevated road on Budge Budge Trunk Road from Zhinjira Bazar to Batanagar Budge Budge 16 More in South 24 Parganas District in KMA area of PPP Basis 125 Sq. Km. Road Survey at Panagarh Nadiha Panagarh Remarks Company Profile Sl. No. Description of Work Detailed and quantitative survey with Pre and 17 Post Level with Total Station of about 20Km. Road and around D.S.P. Township Location Principal Client Year of Starting Pattern of Work Durgapur M/s Decon India 2006 Road Survey Completed Remarks Company Profile Sl. No. * Engineering Consultancy Survey: Description of Work Location Principal Client Year of Starting Kistwar, Jammu & Kashmir Larsen & Toubro Limited 2013 Govt. of W.B. North 24 Pgns. W/S Division -II, P.H.E.D. 2013 Engineering Consultancy Survey On Going 2012 Engineering Survey On Going 2012 Engineering Survey On Going 2012 Engineering Survey On Going 1 Ratle Hydro Eletric Power Project 2 Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project. Kolkata 3 Koradi Thermal Power Station Nagpur 4 Deployment of survey CHP Phase 2,Sagardighi site. 5 6 7 8 9 Deployment of survey team with necessary machinary & tools at pltcmBOKARO 3X660 MW Power Project , Talwandi Saboo, GIS Power Station Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project. LE110063-IDCT & CHIMNEY FOR 2X600 MW VISA POWER AT RANIGARH 10 Rajpura Thermal Power INDIAN OIL, CORPORATION LTD. Paradeep Refinery 12 Survey work at site on hire basis to check the co-ordinate points, levels and make layouts for areas like CW and ACW water line, BTG, lay down 11 Sagardighi,WB Jharkand,Bokaro Saboo Kolkata Larsen & Toubro Limited McNally Bharat Engineering Compaly Ltd. McNally Bharat Engineering Compaly Ltd. Larsen & Toubro Limited Larsen & Toubro Limited 2012 2012 Pattern of Work Engineering Survey Engineering Survey Engineering Survey Remarks On Going On Going On Going Kolkata Govt. of W.B. North 24 Pgns. 2011W/S Division -II, 2014 P.H.E.D. Engineering Consultancy Survey Ongoing Raigarh Larsen & Toubro Limited Engineering Survey On Going Rajpura Paradeep Larsen & Toubro Limited Larsen & Toubro Limited LANCO always inspiring 2011 2011 2011 2011 Engineering Survey Engineering Survey Engineering Survey On Going Completed Completed Company Profile Sl. No. Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Remarks areas, Fabrication yards and other necessary required areas. Durgapur Kolkata Kolkata 16 Topography Survey at Coke Oven Jain Infraproject Limited. Jain Infraproject Limited. Govt. of W.B.North 24 Pgns.W/S Division -II, P.H.E.D. 2011 2011 2011 JSL Stainless LTd. 2011 Engineering Survey Engineering Survey Engineering Consultancy Survey Engineering Consultancy Survey Engineering Survey Engineering Consultancy Survey Completed Completed Completed Completed 17 Jaypee Nigrie Super Thermal Power Plant Singrauli Larsen & Toubro Limited 2010 18 Survey at 2x700MW Rajpura Thermal Power Project , Patiala, Punjab Larsen & Toubro Limited 2010 MP Larsen & Toubro Limited 2010 Engineering Survey Completed WB Govt. of W.B. North 24 Pgns. W/S Division -II, P.H.E.D. 2010 Engineering Consultancy Survey Completed IVRCL Infrastructures & Project Ltd. 2010 Engineering Survey Completed Larsen & Toubro Limited 2010 Engineering Survey Completed 19 20 21 22 Survey Works for 6X150 MW structural steel works and chimney works at Mahan Singrauli,MP Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project. Erection work for construction of 400KV D/C Tower Packages - A3 under Transmission system associated with pallatana GBPP and Bangaigaon TPS in North Eastern Region Deployment of survey Team with Machinaries & Tools on monthly rental basis at 2X700 MW rajpura Thermal Power Project, Rajpura, Dist Patiala, Punjab Punjab On Going Completed Company Profile Deployment of Survey Team with machinery . Survey Work at Box drain & different 14 pipe line stretches Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, 15 Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project. 13 Description of Work Construction of Integrated Passenger 23 Terminal Building at NSCBI Airport,Kolkata Geodetic and precision survey for construction of Phase - II facilities and 24 other areas of Coke Oven Battery No.4 complex of Visakhapatnam Steel Plant. 25 Survey work for installing ROW pillars along ROW line of SVB Project Survey Work for 6X150 MW 26 structural steel work and chimney work at Mahan Singrauli, MP Survey work for DHAMRA Rail link 27 Project Construction of Integrated Passenger 28 Terminal Building at NSCBI Airport,Kolkata Survey work at COBP Project at 29 Orissa Survey team with total station for SMS 30 area. 31 Survey at Nalanda Class Room Complex at IIT Kharagpur.B-Block . Location Principal Client Year of Starting Pattern of Work Remarks Kolkata ITD-ITD CEM JV. 2010 Engineering Survey Completed Andrapradesh Rashtiya Ispat Nigam Limited 2010 Engineering Consultancy Survey Completed Kolkata Second Vivekananda Bridge Tollway Companhy Private Ltd 2010 Engineering Consultancy Survey Completed MP Larsen & Toubro Limited 2010 Larsen & Toubro Limited 2009 Kolkata ITD-ITD CEM JV. 2009 Orissa JSL Limited. 2009 JINDAL STAINLESS Simplex Kharagpur,WB Infrastructures Limited. Govt. of W.B. North 24 Pgns. W/S Division -II, New Town Kolkata P.H.E.D. Jajpur, Orissa Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, 32 Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project. Topographical Survey work using Total Station Theodolite along with Govt. of W.B. necessary Skilled/ Unskilled personnel, North 24 Pgns. 33 Tools & Plants & Machinery all New Town Kolkata W/S Division -II, complete for providing PHE Services P.H.E.D. at Action Area - II of New Town Kolkata Project. 2009 Engineering Consultancy Survey Engineering Survey Engineering Survey Engineering Survey Engineering Survey Completed Completed Completed Completed Completed 2009 Engineering Survey Completed 2009 Engineering Consultancy Survey Completed 2008 Engineering Consultancy Survey Completed Company Profile Sl. No. Description of Work Location Principal Client Topographical Survey work using Total Station Theodolite along with Govt. of W.B. necessary Skilled/ Unskilled personnel, North 24 Pgns. 34 Tools & Plants & Machinery all New Town Kolkata W/S Division -II, complete for providing PHE Services P.H.E.D. at Action Area - II of New Town Kolkata Project. Survey work for Second Vivekananda Larsen & Toubro Kolkata 35 Bridge Project site at Dakhineshwar Limited Kolkata Construction of Integrated Passenger ITD-ITD CEM Kolkata 36 Terminal Building at NSCBI JV. Airport,Kolkata Col Mines Survey Work at Kol Dam Project in Himachal Pradesh Associated 37 Himachal Pradesh Traders Survey at SAIL Durgapur Steel Plant Tecpro Systems Durgapur 38 for the Project of Debottlenecking of Limited. RAW Material Handling Plant Year of Starting Pattern of Work Remarks 2007 Engineering Consultancy Survey Completed 2005 2004 2004 Engineering Consultancy Survey Engineering Consultancy Survey Engineering Consultancy Survey Engineering Consultancy Survey Completed Completed Completed Completed Company Profile Sl. No. * Pipe Line Survey: Sl. No. Description of Work Location Principal Client Year of Starting Pattern of Work Remarks Location Principal Client Year of Starting Pattern of Work Remarks 1 GPS survey work by RTK instrument for our pipe line job of 8000.00mts. Approx from Kahragpur GOKULPUR to HIJLI station at KHARAGPUR division Sourh Eastern Railway McNally Bharat engineering Company Limited. 2013 Pipe Line Survey On Going 2 Route alignment suggestion best possible route from Chandil Dam to Ranchi Ranchi HINDALCO Industries Limited 2012 Pipe Line Completed Survey 3 Pipeline Route Survey for 8.625" ODX28Km., IOCL ATF - Kolkata Pipeline work from Mourigram Terminal to AFS Gouripur Kolkata Harisons Industries 2011 Pipe Line Completed Survey 4 Layout Survey by Total Station at KMC Pumping Station at Senpally Behala, Kolkata Kolkata Jain Infraprojects Limited 2011 Pipe Line Completed Survey 5 Survey Work for Pipeline at DSP Durgapur Jain Infraprojects Limited 2011 Pipe Line Completed Survey 6 Survey Work by using Total Station and other related equipment for site area as per area layout draing. Durgapur Jain Infraprojects Limited 2011 Pipe Line Completed Survey 7 Pipeline Route Survey at Teesta River Crossing, Sevok Bazar. Sevok Bazar Harisons Industries 2010 Pipe Line Completed Survey 8 Reconnaissance and pipeline route survey work for the section from Dankuni Coal Complex to Receiving terminal (NH2/NH6 Junction). Howrah Greater Calcutta Gas Supply Corporation Ltd. 2007 Pipe Line Completed Survey Description of Work * Mining Survey: Company Profile Sl. No. Sl. No. 1 2 3 4 5 Description of Work Preparation of plans for Oting coal Mine of Black Gold Excavators Pvt.Ltd Contour / Grid Survey at Sharda OC Mine, Sohagpur area SECL Topographical Survey work Topographical Survey of about 3.83 Sq.Km. (383 Hectors) in respect of Dumri Coal Block, Dist. - Hazaribagh, Jharkhand State. Topographical Survey of Tiru Area (Upper and Lower) in Nagaland Location Nagaland MP Principal Client Black Gold Excavators Pvt.Ltd Cuprum Bagrodia Limited Year of Starting 2012 2010 Pattern of Work Mining Survey Mining Survey Mining Survey Remarks Completed Completed Nagaland Tirucoal Project 2008 Completed Jharkhand Mahacol Trexim Private Limited 2008 Mining Survey Completed Nagaland NCP Oting (JV) 2007 Mining Survey Completed Principal Client Year of Starting Pattern of Work Remarks 2012 Railway Survey Completed 2012 Metro Railway Survey Completed 2011 Railway Survey Completed ITD - ITD Cementation India Limited 2010 Railway Survey Completed KEC International Limited 2010 Railway Survey Completed MBB Consultancy Services Pvt. Ltd. 2009 Railway Survey Completed Balaji Rail Road Systems Limited 2009 Railway Survey Completed Sl. No. Description of Work 1 Topographical Survey in connecting with preparation of Feasibility Report for JSPL. 2 Execution of Survey Work for our joka BBD Bag Metro Railway Project Site. Kolkata 3 Survey of platforms in between BandelKatwa Station Katwa 4 5 6 7 Location GUA Traversing & Traversing Calculation from Phoolbagan to Central Metro Station (Total Kolkata Legnth of 6Km. Approx) including Drawing Submission for KMRC:UG2 Detailed survey with the help of Total Station between Tamluk (Junction cabin) and Rajgoda Railway Station in Kharagpur Tamluk Division of South Eastern Railway for a Total length of 13.5Km Topographical Survey for preparing Engineering Plan of the proposed Private Raigarh, siding of M/s Raigarh Coal Benification Pvt. Chattrishga Ltd. near Robertson Railway Station, S.E.C. r Railway Detailed Survey at Patratu by Total Station Balaji Rail Road Systems Limited (BARSYL) McNally Bharat Engineering Company Limited Mesa NarulaGCC(JV) (MNG) Company Profile * Railway Survey: Sl. No. 8 9 10 11 12 13 Description of Work Location Balaghat,M P Detail Survey of Railway Siding by total Tatanagar, Station at Gamharia site Jharkand Detailed Survey for Chattibariatu & Dehri On Kerandari Coal Mines Railway siding project Sone,Bihar of NTPC Ltd. Layout Survey and taking x-section of a pvt. Railwar siding taking off from Tapsi-Barbani Asansol line of Asansol Division of ER by Total Station. Detailed Survey at GUA Railway station yard GUA by Total Station Detailed Survey at ACC, Madhukunda Plant Madhukun by Total Station da Railway siding Survey 14 Detailed Survey at Borojamda Site Borojamda Deatiled Survey at Barada Railway Yard by Total Station Deatiled Survey at Bolani Railway Yard by 16 Total Station 15 Barada Bolani Principal Client Year of Starting Sova Ispat Limited 2008 Balaji Rail Road Systems Limited 2008 Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Balaji Rail Road Systems Limited Pattern of Work Railway Survey Railway Survey Completed 2008 Railway Survey Completed 2008 Railway Survey Completed 2008 2008 2007 2007 2007 Purulia,WB Haldia Steels Ltd. 2006 Layout of Proposed Railway Track from take 18 off point to Buffer end of Shri Ramrupai Balaji Steel Ltd. At Banskopa Durgapur Durgapur Jai Balaji Group 2006 Completed Completed Completed Completed Completed Completed Completed Railway Survey Completed Pattern of Work Remarks Company Profile 17 Railway siding by Total Station Railway Survey Railway Survey Railway Survey Railway Survey Railway Survey Railway Survey Remarks * HT Line Project: Sl. No. Description of Work Location Area/ Length Principal Client Year of Starting 1 Detail Survey of existing 132kv D/C Transmission Line of DVC from Kalipahari to BALCO including submission of Route Alignment Drawing,Profile Drawing & Tower Scheduling. 2 Route Alignment Survey 3 4 Survey and soil investigation for 400kV D/C transmission line for 2x660MW STPP at Banka ,Bihar 400 KV D/C Tower PackagesA3 under Transmission System associated with Pallatana GBPP and Bongaigaon TPS in North Eastern Region. Durgapur 6.5 km. DPSC Limited. 2013 Transmission Line Survey On Going Ranchi 20.863 km. Hindalco Industries Limited 2012 Transmission Line Survey Completed Bihar 29 km L&T Construction 2012 Transmission Line Survey Completed Bonga 15 km IVRCL Infrastructures & Projects Ltd. 2010 Transmission Line Survey Completed Year of Starting 2012 Pattern of Work DGPS Survey Completed 2012 GPS Survey Completed 2011 DGPS Survey Completed 2010 GPS Survey Completed 2006 GPS Survey Completed 2006 GPS Survey Completed * GPS Survey: 2 DGPS Control Point survry work 3 DGPS Point Process GPS Point & Control Point fixing at entire area of Kolkata Metro Railway Project (East - West) between subhas sarovar and Central Station Based for KMRC:UG2 4 Location Principal Client Nagaland Zymax Technologies Consulting Engineering Services (INDIA) Private Limited Geosmart Technology Salt Lake (Kolkata) Howrah Kolkata 5 GPS Survey of Slum in Uttarpara Kotrang Municipality Area Uttarpara 6 Gps Survey of Slum in Kalyani Municipality area Kalyani ITD - ITD Cementation India Limited IL&FS Infrastructure Development Corporation LTd IL&FS Infrastructure Development Corporation LTd Remarks Company Profile Sl. Description of Work No. 1 20 nos of DGPS points fixing. Others Completed Project List: 1) Development of HINDALCO Factory at Muri. 2) Kandra Steel Plant Development. 3) Kol Dam Project in Himachal Pradesh. 4) Chakdah-Bongan Road Project. 5) South City at Kolkata. 6) Railway siding development at Dadhapara Station. 7) Railway siding development at Rupond Station. 8) D.S.P. Township Road development Project. 9) Tata Iron mines at Noamundi. 10) Monarchak Transmission Line Survey. 11) Railway siding development of ESL MINING LTD at Barbil. 12) DRDO Project at Nayagaon, Assam 13) NTPC 225 Flood Control Project at Farakka. 14) Existing Railway line development for HINDALCO at Hirakundh. 15) NEPAZE Steel Plant Development. 16) LAFARGE Cement Plant Development at Bhatapara. 17) OCL Railway siding development at Bayree. 18) HCL Railway siding development at Ghatsila. 19) Railway siding development at Durgapur. 20) BCCL out Sourcing Project at Dhanbad. 21) Railway siding development at Sri Ramrupai Balaji Steel Plant . 22) Railway siding development at Dadhapara Station. 23) Canal survey at chilka and RatnaJira river at Puri (Phase -I). 25) Proposed Water Treatment Plant survey at Nagpur, Jharsuguda, Koderma, Maithon, Bhuj, Mejia for L&T. 26) Survey for proposed railway siding for NTPC at Hazaribag under BARSYL. 27) Plant survey of material handling system for Birla Cement at Durgapur. 28) Survey for fabrication and Batching plant of airport authority at Netaji Subhas Chandra Bose Internationa Airport (NSCBIA), Kolkata under ITD Cementation Ltd. 29) Completion Bally Water Line Project. 30) Completion Topography survey for Kolkata Metro Railway from Central to Howrah Maidan. 31) Topography survey of two stations one is SEALDAH & another one is Central Metro Station under ITD. 32) Pillar Installation at metro related area under ITD. 33) Survey for new airport complex and runway at Netaji Subhas Chandra Bose Company Profile 24) Rail Survey at different Private siding in CKP division under South Eastern Railway. International Airport in Kolkata under ITD CEM JV. 34) Survey of canal at chilka and survey of Ratnajira River at Puri (Phase-II). 35) Survey at Thermal Power Plant of L&T Ltd. at Nagpur, Jharsuguda, Koderma, Maithon, Bhuj, Mejia site. 36) Canal Survey at Mandermuni in Digha. 37) BRTS Road survey at Durgapur under BUIDL. 38) Detail Topography layout survey under HINDALCO Industries Limited. 39) Topographical survey at Bhadrakh Site under Larsen & Toubro. 40) Survey Project within Zone Command area including preparation data base and drawing under Surface Water Based Water Supply Scheme in the arsenic affected areas of S outh 24 Parganas District. 41) Collecting Horizontal Reference Point from i) cut & cover (subhas sarobar); ii) Phool Bagan; iii) cross over; iv) Sealdah; v) Central station under ITD - ITD CEM JOINT VENTUE. 42) Survey work under L&T at Rajmundrai Site. 43) Details survey at EM-Bypass relevant area 44) Rail survey work at Shantipur under Mesa Narula JV. 45) Kachrapara Municipality survey. 46) Sewerage Network survey work for the Kanchrapara, Kalyani, Champdani, Rishra, Nabadeep, Krishnanagar municipalities under National Ganga River Basin Authority (NGRBA). Company Profile 47) Survey work at Barbil, Jharkhand under Global Industries. C O N C L U SI O N The list of client along with the work volume is increasing day to day. Simultaneously the quality of work reflects by the satisfaction of client. Precision Survey consultancy commit to the client to Company Profile provide the best service at all time.
© Copyright 2024