NATIONAL WATER ACADEMY, PUNE Training Program on “Civil Design Aspects of Hydro Electric Projects” 09 – 13 February, 2015 REGISTRATION FORM Government of India Ministry of Water Resources, River Development & Ganga Rejuvenation Central Water Commission Name (in capitals):_________________ Designation :______________________________ Organization:____________________________________________ Responsibilities (in brief):__________________________________________________ ______________________________________________________________________ Full Postal Address:_______________________________________________________ ______________________________________________________________________ Training Program on Civil Design Aspects of Hydro Electric Projects 09-13 February, 2015 Tel Nos.(with STD Code) :_________________________________________________ Fax No:______________________________ Mobile :__________________________ E-mail:_________________________________________________________________ Whether require accommodation at NWA complex ? Date YES / NO (Signature of the participant) SPONSORING AUTHORITY Full Postal Address:_______________________________________________________ ______________________________________________________________________ Tel Nos.(with STD Code) :_________________________________________________ Fax No:______________________________ Mobile :__________________________ E-mail:_________________________________________________________________ Date (Signature and Seal) ________________________________________________________________________ Completed Registration Form may be sent by Fax to: 020-24380110 KOYNA DAM, MAHARASHTRA, INDIA Organised by National Water Academy Pune INTRODUCTION AND OBJECTIVE RESOURCE PERSONS For a growing economy like India, there is a great importance of energy. Hydropower, being a source of clean The resource persons for the program would be subject experts, Retired Officers and Eminent persons. energy, it assumes lot of importance in the development of the country. A lot of advances are taking place in different aspects of Hydropower Projects. The Civil Design aspects of Hydropower Projects has a very important bearing on Planning, Costing Safety as well as life of Hydropower Projects. Keeping this in mind, a one week program on “Civil Design Aspects of Hydropower Projects” is scheduled during 9-13 February DURATION The participants are expected to reach NWA by the evening of 08 February, 2015 and should plan to leave only after 1800 Hrs. of 13 February, 2015. 2014 VENUE PROGRAM CONTENTS The program will comprise of classroom sessions, case studies and related field visits and will primarily cover the following topics: TARGET GROUP A) DAM AND SPILLWAY DESIGN General planning of HP Project including hydrological planning and Power Potential Studies. Run of the River Schemes: General Design of Barrage and Appurtenant Structures. . Storage Schemes – Design of various types of Dams Concrete, Earth and Rockfill Dams. MasonryDams, Roller Compacted Concrete Dams, Hydraulic and Structural Design of different typesof Spillways. Analysis and Design of EnergyDissipation Arrangement B) DESIGN OF WATER CONDUCTOR SYSTEM Design and Planning of Power Intakes, Desilting Chambers and Water conductor system. Hydraulic Transient Studies. Planning and Design of Power House – Civil Structures. C) UNDERGROUND CAVITIES AND SOFTWARES USED IN HYDROPOWER PROJECTS Superstructures, Intermediate Structures and Substructures. Design of Tunneling including underground cavities for various purposes. Introduction to different Softwares in Hydel Civil Design structures. [ A. B. C. D. E. • Description Central/State/Local Government Depts. including their autonomous bodies: ‘Not for Profit’ Central and State PSUs Recognized academic institutions, NGOs Central and State Public Sector Undertakings Private Companies, individuals Graduate Engineers in the rank of AE/EAD, AEE/AD & EE/DD, SE/Director etc. with experience in the field of planning, design and construction of water resources structures. PARTICIPATION The nomination of the officers fitting the target profile may be sent to the Program Director latest by 29th January 2015. The nominated officers are requested to start for the program only after confirmation of their nomination. The accepted nominations will be displayed on NWA’s website on 30th January 2015. LOCAL HOSPITALITY PROGRAM FEE There is no program fee for participants from Central and State Govt. departments. Charges for participants from other categories are: Category National Water Academy, Khadakwasla, Sinhagad Road, Pune-411 024. (for more info on NWA, visit http://nwa.mah.nic.in) Fee in Rs. (per participant) Nil Nil 1,500/10,000/15,000/- Discounts applicable : (a) 50% for PSUs of MoWR i.e. WAPCOS & NPCC (no group discount); (b) For others – 20% discount for 3-4 participants; 30% discount for 5 or more participants from the same organization. Payment may be made by Demand Draft drawn in favour of “Deputy Director (A&C), NWA, Pune” prior to the commencement of the training program. NWA has a self-contained residential campus, and all out-station participants would be provided with accommodation in the NWA Hostel. Lodging and boarding will be provided by NWA. Airport/Railway station pickup/drop will have to be arranged by the participants. The participants may avail the services of prepaid taxi/auto. . WEATHER During the month of February it is mild winter and the average temperature of Pune may be around 15°C to 20°C. CONTACT For sending nominations or for any information, please contact : Shri Rajeev Singhal Director and Program Co-ordinator National Water Academy, CWC, Khadakwasla, Sinhagad Road, Pune – 411 024 Tel: 020 - 24380476, Fax: 020-24380110 E-mail: [email protected]/ Website: http://nwa.mah.nic.in
© Copyright 2024