FLAGLER COUNTY BOARD OF COUNTY COMMISSIONERS GENERAL BUSINESS / AGENDA ITEM # IY SUBJECT: Approval of: 1. Exhibit J, Guaranteed Maximum Price Amendment to the Construction Management Services Agreement between Flagler County and Allstate Construction, Inc. for Construction Phase Related Services in the Amount of $16,442,282, as well as establishing Construction Management Fees and General Conditions as part of the Guaranteed Maximum Price; 2. An Owner's Project Budget of $1,500,000; 3. A Total Maximum Project Budget of $17,943,000 and 4. Issuance of Notice To Proceed, all for Expansion of the Flagler County Inmate Facility, Flagler County Request for Statement of Qualifications No. RSQ-Q005-0-2014. DATE OF MEETING: February 2,2015 OVERVIEW/SUMMARY: At the May 19, 2014, County Commission meeting the Board approved the Construction Management Services Agreement for Design Phase services and authorized Staff to negotiate a suitable fee for Construction Management Services with Allstate Construction, Inc. The project design by Clemons Rutherford & Associates, Inc., with user coordination and participation, has been completed and the Board is being asked to approve the contract amendment for the Construction Phase Services, the Guaranteed Maximum Price Amendment to the Agreement with Allstate Construction, Inc. and the overall project construction budget. It is also requested that Staff be authorized to issue Notice-to-Proceed to Allstate Construction, Inc. The final project scope includes construction of a new 270 bed inmate housing pod, renovation of the existing inmate facility into a support services building and renovation of the existing operations center into an overall detention center administration facility; along with related necessary site and infrastructure improvements. The new housing pod is divided into twelve (12) individual housing units that will allow separation of male inmates into appropriate classifications and minimize future staffing requirements. The new support services building will include expanded food service facilities, medical facilities, enlarged sallyport and intake booking areas and improved detention security features, along with 134 beds for female inmate housing within the existing cell blocks. Inmate video visitation facilities are being provided within the new administration building and will be interconnected with the multiple housing units. At this time the Board is also being asked to approve the amount of $16,442,282 for the Guaranteed Maximum Price (GMP) Construction Phase Services. These services will construct the Inmate Facility Expansion and related Site Improvements including Construction Management Fees, General Conditions and Contingency costs of 2%. An Owner's project budget of $1,500,000 is also requested. These funds are to cover project add alternatives still being finalized and third party costs (e.g. building/project permits, utility service fees, furniture, fixture and equipment and an additional1 % contingency) not within the Contractor's GMP amount. The approval of these funds is with the understanding the authorization is to insure project completeness and no delays in the construction process. ATTACHMENT NO.1 EXHIBIT J, GMP AMENDMENT EXPANSION OF THE FLAGLER COUNTY INMATE FACILITY RSQ-Q005-0-2014 GMP Amendment January 29, 2015 ~ LLSTATE CONSTRUCTION, INC• • Building Quality for life ALLSTATE CONSTRUCTION, INC • • Building Quality for life GMP AMENDMENT Expansion of the Flagler County Inmate Facility January 29, 2015 TABLE OF CONTENTS EXHIBIT J GMP Amendment to Agreement Between Owner & Construction Contractor ATTACHMENT 1 SECTION SECTION SECTION SECTION SECTION GMP Amendment Proposal (comprised of Sections 1 to 5 below) 1 2 3 4 5 Summary of Work Pricing Summary Detailed Estimates Clarifications & Assumptions Advertisement ATTACHMENT 2 Schedule of Values ATTACHMENT 3 Construction Schedule ATTACHMENT 4 Project Funding Schedule EXHIBIT J GMP AMENDMENT TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION CONTRACTOR PROJECT NO. RSQ-Q005-0-2014 WHEREAS, the Owner and the Construction Contractor acknowledge and agree that the Agreement entered into and Effective on July 7, 2014, is in full force and effect and that this Amendment merely supplements said Agreement; and WHEREAS, the parties hereto have negotiated a Guaranteed Maximum Price, including the Construction Contractor's Fee for construction and warranty services and other services as set forth herein and in the Agreement; and WHEREAS, the Construction Contractor represents that the Construction Contractor, Subcontractors, material and equipment suppliers have compared phasing, demolition, architectural, structural, mechanical, electrical, plumbing, civil and site drawings and specifications and have compared and reviewed all general and specific details on the drawings and specifications and that all conflicts, discrepancies, errors and omissions, which are within the commonly accepted knowledge base of a licensed general contractor, subcontractor, trades person, manufacturer, or other parties required to carry out the Work involved in this Amendment, have been corrected or clarified prior to execution of this GMP Amendment and, therefore, Construction Contractor warrants that the GMP includes the cost of correcting all conflicts, discrepancies, errors, or omissions which the Construction Contractor has identified, or should have identified, through the exercise of reasonable skill and care, during the Design Phase of this Agreement; and WHEREAS, the Construction Contractor's review and comparison has taken into consideration the total and complete functioning of all systems and, therefore, the Construction Contractor represents that the GMP represents the total cost for complete and functional systems. NOW THEREFORE, in exchange for the mutual covenants and promises set forth herein and the sums of money agreed to be paid by the Owner to the Construction Contractor, the parties agree as follows: GUARANTEED MAXIMUM PRICE Pursuant to Section 5(B) and Section 6 of the Agreement between the Owner and the Construction Contractor, the parties have agreed to the establishment of a Guaranteed Maximum Price for the Work in the amount of $16,442,282, as further set forth herein. This Price is for the performance of the Work in accordance with the Contract 1. Page I of 12 Documents listed and attached to this Amendment and Attachments I through 4, as follows: Contract Document List a. b. c. d. Addendum No.3 prepared by CRA Architects, Inc. received on December 8, 2014 Addendum No.2 prepared by CRA Architects, Inc. received on December 3, 2014 Addendum No.1 prepared by CRA Architects, Inc. received on November 24, 2014 Sketches prepared by Allstate Construction, Inc. No. Z-C201A Z-C301A Z-C501A Z-C601A Z-E43A Z-S03A-9 Z-ESII Z-ESI2 Description Construction Sequence 2014-10-29 Construction Sequence 2014-10-29 Construction Sequence 2014-10-29 Construction Sequence 2014-10-29 Smoke Control System Foundation Five-Sided Precast Module 2014-11-12 Electronic Security Rough-in Electronic Security Rough-in Cell-Foyer Front Frames ROI Security Gypsum Board Ceilings Fencing Sketches - (5) 8.5xll pages Date 10/29/2014 10/29/2014 10/29/2014 10/29/2014 11119/2014 11112/2014 11125/2014 11125/2014 12/02/2014 12/04/2014 01105/2015 e. Sketches prepared by CRA Architects, Inc. No. Description N/A N/A N/A N/A N/A Sketch ADDI Al.l Sketch ADD 1 A 1.3 Sketch E 1.2A Sketch E2.lA Sketch E5.1 A Received Date 11124/2014 11/24/2014 11/24/2014 1112412014 11124/2014 f. Project Drawings prepared by CRA Architects, Inc. No. Description n.l COOl C002 CI0l C201 C202 C203 Cover Sheet & Index of Drawings Civil Cover PageNicinity Map Index Page Existing Conditions Plan Demolition and Phase One Erosion Control Plan Phase II Erosion Control Plan Erosion Control Details Received Date 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 Page 2 of 12 C204 C301 C401 CSOI C601 C701 C801 C801.2 LS1.0 LSl.1 LS1.2 D1.1 D1.2 ALl A 1.2 A1.3 A1.3A A1.3B Al.4 A1.4A Al.4B A1.S A2.0 A3.0 A3.l A4.l A4.2 A4.3 A4.4 AS.O AS.l AS.2 A7.0 A7.l A8.0 A8.l A8.2 A9.0 A9.1 Al1.0 Al1.1 Al 1.2 Al1.3 Erosion Control Notes Site Plan Grading Plan Drainage Plan Utility Plan Typical Details Site Details Utility Details SuppOtt Services Building Life Safety Plan Housing Pod First Floor Life Safety Plan Housing Pod Second Floor Life Safety Plan Support Services Building First Floor Demolition Operations Center Demolition Plan SUppOlt Services Building First Floor SUppOlt Services Building Mezzanine Floor Plan Housing Pod First Floor Composite Plan Housing Pod First Floor North Housing Pod First Floor South Housing Pod Mezzanine Composite Plan Housing Pod Mezzanine Level North Housing Pod Mezzanine Level South Operations Center Remodel Plan Exterior Elevations SUppOlt Services Building Sections Housing Pod Building Sections Support Services Wall Sections Support Services Wall Sections Housing Pod Wall Sections Housing Pod Wall Sections Wall Partition Types Misc. Details Enlarged Toilet Plans Video Visitation Details Door & Window Type Elevations Door & Window Details Support Services Reflected Ceiling Plan Housing Pod Reflected Ceiling Plan Housing Pod Mezzanine Reflected Ceiling Plan SUppOlt Services Roof Plan Housing Pod Roof Plan Support Services Building Finish Plan Housing Pod First Floor Finish Plan Housing Pod Mezzanine Finish Plan Operations Center Finish Plan 11107/2014 11124/2014 11107/2014 11124/2014 12/03/2014 1112412014 11107/2014 11107/2014 11104/2014 11104/2014 11104/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 1110712014 11104/2014 11104/2014 11/04/2014 11/04/2014 11/0412014 11/04/2014 11104/2014 11124/2014 11104/2014 11104/2014 12/08/2014 11/04/2014 1110412014 11/04/2014 1110412014 11/04/2014 11/04/2014 11/04/2014 11/04/2014 1110412014 11/04/2014 Page 3 of 12 SO.1 SO.2 SO.3 SO.4 SO.S SO.6 S1.1 S1.2 S1.3 S2.1 S2.2 S2.3 S2.4 S2.S S2.6 MO.l MO.2 MDl.l MD1.2 MD1.3 Ml.l Ml.2 Ml.3A M1.3B M1.4A Ml.4B M1.S M1.6 MS.l MS.2 PO.l Pl.O PDl.l PD1.2 PDl.S PD2.1 Pl.l Pl.3A P1.3B P1.4A Pl.4B Pl.S P2.1 General Structural Notes Details Sections Sections Sections Sections SUppOlt Services Bldg. Foundation Plan Support Services Bldg. Secure Ceiling Framing Plan Support Services Bldg. Roof Framing Plan Housing Pod Foundation Plan Housing Pod Foundation Plan Housing Pod Mezzanine Framing Plan Housing Pod Mezzanine Framing Plan Housing Pod Roof Framing Plan Housing Pod Roof Framing Plan General Notes, Legends and Schedules-HVAC Schedules-HVAC Support Service Demolition Floor Plan-HVAC Support Service Demolition Mezzanine & Roof Plans-HVAC Operations Center Demolition Plan-HVAC SUppOlt Service Floor Plan-HVAC Support Service Mezzanine and Roof Plans-HVAC Housing Floor Plan-North-HVAC Housing Floor Plan-South-HVAC Housing Mezzanine Floor Plan-NOlth-HVAC Housing Mezzanine Floor Plan-South-HVAC Housing Equipment Platform-HVAC Operations Center Floor Plan-HVAC Details-HVAC Details-HVAC General Notes, Legends and Schedules-Plumbing Site Plan-Plumbing Support Service Demolition Floor Plan-Plumbing Support Service Demolition Mezzanine Plan-Plumbing Operations Center Demolition Floor Plan-Plumbing SUppOlt Service Enlarged Demolition Plans-Plumbing SUppOlt Service Floor Plan-Plumbing Housing Floor Plan-NOlth-Plumbing Housing Floor Plan-South-Plumbing Housing Mezzanine Floor Plan-NOlth-Plumbing Housing Mezzanine Floor Plan-South-Plumbing Operations Center Renovation Floor Plan-Plumbing Support Service Enlarged Plans-Plumbing 11107/2014 11/24/2014 1110712014 11107/2014 11124/2014 11/24/2014 11124/2014 11/24/2014 11/2412014 1112412014 11124/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11107/2014 11107/2014 11107/2014 1110712014 1110712014 1110712014 1110712014 11107/2014 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 12/03/2014 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 Page 4 of 12 P2.2 P2.3 PS.I PS.2 FO.l Fl.O FD1.l Fl.1 Fl.3A FIJB Fl.4A Fl.4B Fl.S EO.l EDl.O ED1.1 ED1.2 ED2.l ED2.2 E1.0 El.1 E1.2 E1.3 EIJa E1.4 E2.1 E2.2 E2.3 E2.4 E2.S E2.6 E3.1 E3.2 E3J E3.4 E3.S E4.l E4.2 E4.3 E4.4 ES.l ES.2 E6.1 Support Service Riser Diagrams-Plumbing Housing Enlarged Plans-Plumbing Details-Plumbing Details-Plumbing General Notes, Legends and Schedules - Fir Protection Site Plan - Fire Protection Support Service Demolition Floor Plan - Fire Protection Support Service Floor Plan - Fire Protection Housing Floor Plan - North - Fire Protection Housing Floor Plan - South - Fire Protection Housing Mezzanine Floor Plan - North - Fire Protection Housing Mezzanine Plan - South - Fire Protection Housing Equipment Platform - Fire Protection General Notes Legend and Schedule - Electrical Site Demolition Plan - Electrical Support Service Demolition Floor Plan - Lighting Operations Center Demolition Floor Plan - Lighting Support Service Demolition Floor Plan - Power Operations Center Demolition Floor Plan - Power Site Renovation Plan - Electrical SUppOlt Service Renovation Floor Plan - Lighting Housing Floor Plan - Lighting Housing Mezzanine Plan - Lighting Housing Equipment Platform - Electrical Operations Center Renovation Floor Plan - Lighting Support Service Renovation Floor Plan - Power Housing Floor Plan - Power Housing Mezzanine Floor Plan - Power Operations Center Renovation Plan - Power SUppOlt Service - Enlarged Kitchen Plan - Power Enlarged Floor Plans - Power Support Service Renovation Floor Plan - Fire Alarm Operations Center Renovation Plan - Fire Alarm Housing Floor Plan - Fire Alarm Housing Mezzanine Floor Plan - Fire Alarm Housing Equipment Platform - Fire Alarm Single Line Diagrams - Utility and New Housing Power Single Line Diagrams - Support Service Building Power Single Line Diagrams - Fire Alarms Single Line Diagrams - Miscellaneous Electrical Panel Schedules - Electrical Panel Schedules - New Housing Details - Electrical 11107/2014 11107/2014 11107/2014 1110712014 12/03/2014 12/03/2014 1110712014 12/03/2014 1110712014 12/03/2014 1110712014 11107/2014 11107/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 12/02/2014 Page S of 12 E6.2 FS1.1 FS1.2 FS1.3 FS1.4 FS1.5 FS1.6 TO.l T1.1 T1.2 ES1.0 ESl.1 ESl.2 ES1.3 ES1.4 ES1.5 ESl.S ES2.0 ES2.1 ES2.2 ES2.3 Details - Fire Alarm Large Scale Kitchen Plan Kitchen Plumbing Rough-In Plan Large Scale Electrical Rough-In Plan Large Scale Refrigeration Plan UDS and Fire System Plans UNS Electrical Schedule General Notes & Legend - Telecommunications Support Service Floor Plans - Telecommunications Housing Floor Plans - Telecommunications Legend & General Notes Support Services Building First Floor Support Services Building Mezzanine Level Housing Pod First Floor Housing Pod Mezzanine Level Operations Center Support Services Building First Floor Control Room Enlarged Plans System Configuration CCTV Risers Equipment Details 12/02/2014 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 12102/2014 12/02/2014 12/02/2014 1111912014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 g. Project Specifications prepared by CRA Architects, Inc. No. Description 011000 012500 012900 013100 013200 013300 014000 014200 015000 015500 017700 017800 023000 023200 023200 Volume 1 of 1 Table of Contents Summary of Work Substitution Procedures Payment Procedures Project Coordination Project Meetings Submittals Quality Requirements Definitions and Standards Temporary Facilities Materials and Equipment Closeout Procedures Warranties Geotechnical Data Geotechnical Report Geotechnical Report - Addendum Received Date 12/03/2014 11118/2014 11118/2014 1111812014 1111812014 11118/2014 11118/2014 11118/2014 1111812014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 06/19/2014 10/3012014 Page 6 of 12 033000 Building Concrete Work 034100 Structural Precast Concrete - Prefabricated Precast Concrete 042000 Unit Masonry 051200 Structural Steel Framing 053100 Steel Deck 055000 Metal Fabrication 055133 Alternating Tread Steel Stairs 061000 Rough Carpentry 062000 Finish Carpentry 064023 Interior Architectural Woodwork 066000 Solid Surfacing 071113 Bituminous Dampproofing 071326 Sheet Membrane Waterproofing 072100 Building Insulation 076200 Flashing & Sheet Metal 076310 Gutters and Downspouts 077020 Type SS Enhanced Performance Roof Hatch Specification 078123 Intumescent Mastic Fireproofing 078400 Firestopping 079200 Joint Sealers 079500 Expansion Control 083333 Overhead Doors 08710 Finish Hardware 08710 Door & Frame Schedule SK-1 Sketch: Security Hollow Metal (SHM) Doors & Frames SK-2 Sketch: Hollow Metal (HD) Doors & Frames 08800 Glass and Glazing 093000 Tile 095100 Acoustical Ceilings 096623 Resinous Flooring 096519 Linoleum Tile 096723 Resinous Flooring 096816 Carpeting 099100 Painting 099600 Fiberglass Mat Reinforced Epoxy Wall Coating 102113 Toilet Partitions 102114 Video Visitation Partitions and Low Wall Cap 102213 Security Cages & Partitions 104400 Signage 104416 Fire Extinguishers, Cabinets, And Accessories 104416 Fire Extinguishers, Cabinets, And Accessories 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 1111812014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11118/2014 11119/2014 11119/2014 1111912014 11119/2014 1111912014 1111912014 11120/2014 11118/2014 1112012014 12/08/2014 1111812014 1112012014 11118/2014 11118/2014 11118/2014 1112012014 12/03/2014 12/03/2014 1111812014 1112012014 Page 7 of 12 10800 Toilet and Bath Accessories 109900 Miscellaneous Specialties 11190 Detention Equipment General Provisions 11192 Commercial & Security Hollow Metal 11194 Security Hardware 11195 Security Glass & Glazing 11197 Security Furnishings 11330 Screening and Grinding Equipment 11400 Food Service 11400 Itemized List of Food Service Equipment 133419 Metal Building Systems MEP Specifications 019113 General Commissioning Requirements 033053.1 Miscellaneous Cast-In-Place Concrete for Mechanical And Electrical Systems 055000.1 Metal Fabrications For Mechanical And Electrical Systems 083113.1 Access Doors And Frames For Mechanical And Electrical Systems 099113.1 Exterior Painting For Mechanical And Electrical Systems 099123.1 Interior Painting For Mechanical and Electrical Systems 17000 Security Electronics, General 17120 Touch Screen System 17140 Programmable Logic Controller 17150 Electronic Relay System 17200 Intercommunications System 17290 Video Visitation System 17300 Digital Closed Circuit Television System 17500 Vehicle Detection System 17710 Uniterruptible Power System (Ups) 17740 Access Control System 17770 Personal Duress Alarm System 210100 General Provisions For Fire Suppression 210120 Submittal Procedures 210130 Quality Requirements 210150 Product Requirements 210160 Execution 210517 Sleeves And Sleeve Seals For Fire-Suppression Piping 210518 Escutcheons For Fire-Suppression Piping 210523 General-Duty Valves For Water Based Fire-Suppression 210553 Identification For Fire-Suppression Piping And Equipment 211313 Wet-Pipe Sprinkler Systems 11118/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11119/2014 11117/2014 11118/2014 11118/2014 11119/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11117/2014 11117/2014 11117/2014 11117/2014 11117/20104 11117/2014 11117/2014 11117/2014 11117/2014 11117/2014 11117/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 Page 8 of 12 220100 220120 220130 220150 220160 220513 220517 220518 220519 220523 220529 220553 220719 221116 221116.13 221119 221123 221316 221319 221323 221413 221423 223123 223400 224213.13 224213.16 224216.13 224216.16 224223 224716 230100 230120 230130 230150 230160 230513 230517 230518 230529 230548.13 230553 230593 General Provisions For Plumbing Submittal Procedures Quality Requirements Product Requirements Execution Common Motor Requirements For Plumbing Equipment Sleeves And Sleeve Seals For Plumbing Piping Escutcheons For Plumbing Piping Meters and Gages For Plumbing Piping General-Duty Valves For Plumbing Piping Hangers And Supports For Plumbing Piping And Equipment Identification For Plumbing Piping And Equipment Plumbing Piping Insulation Domestic Water Piping Underground Domestic Hot Water Piping Domestic Water Piping Specialties Domestic Water Pumps Sanitary Waste And Vent Piping Sanitary Waste Piping Specialties Sanitary Waste Interceptors Facility Storm Drainage Piping Storm Drainage Piping Specialties Facility Natural-Gas Piping Fuel-Fired, Domestic-Water Heaters Commercial Water Closets Commercial Urinals Commercial Lavatories Commercial Sinks Commercial Showers, Receptors, And Basins Pressure Water Coolers General Provisions for Hvac Submittal Procedures Quality Requirements Product Requirements Execution Common Motor Requirements For Hvac Equipment Sleeves And Sleeve Seals For Hvac Piping Escutcheons For Hvac Piping Hangers And Supports For Hvac Piping And Equipment Vibration Controls For Hvac Identification For Hvac Piping And Equipment Testing, Adjusting, And Balancing For Hvac 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11/07/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11/07/2014 1110712014 12/08/2014 1110712014 11107/2014 11/07/2014 11107/2014 11107/2014 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 Page 9 of 12 230713 230719 230800 230900 230923 230928 232113 232300 233113 233300 233423 233500 233713 233723 233900 234100 235533 237413 237433 238113 238239 260100 260105 260120 260140 260160 260170 260180 260190 260519 260523 260526 260529 260533 260544 260553 260573 260923 260943 260953 260954 Duct Insulation Hvac Piping Insulation Commissioning Of Hvac Instrumentation And Control For Hvac Control-Voltage Electrical Power Cables Pathways For Control Voltage Cables Hydronic Piping Refrigerant Piping Metal Ducts Air Duct Accessories HVAC Pwer Ventilators Roof Accessories Diffusers, Registers, And Grilles HVAC Gravity Ventilators Louvers And Vents Particulate Air Filtration Fuel-Fired Unit Heaters Packages, Outdoor, Central-Station Air-Handling Units Packaged, High Percentage Outdoor-Air Units Packaged Terminal Air-Conditioners, Outdoor, Wall mounted Units Unit Heaters General Provisions For Electrical Substitution Procedures Submittal Procedures Temporary Facilities And Controls Execution Operation And Maintenance Data Project Record Documents Demonstration And Training Low-Voltage Electrical Power Conductors And Cables Control-Voltage Electrical Power Cables Grounding And Bonding For Electrical Systems Hangers And Supports For Electrical Systems Raceways And Boxes For Electrical Systems Sleeves And Sleeve Seals For Electrical Raceways And Cabling Identification For Electrical Systems Overcurrent Protective Device Coordination Study Lighting Control Devices Network Lighting Controls Digital, Addressable Fire-Alarm System Modification Of Digital, Addressable Fire-Alarm System 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 1110712014 1110712014 11107/2014 11107/2014 11107/2014 11107/2014 1107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11/07/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 Page 100f12 (Modification Of Existing Systems) Low-Voltage Transformers Panelboards Wiring Devices Fuses Enclosed Switches And Circuit Breakers Engine Generators Transfer Switches Surge Protection For Low-Voltage Electrical Power Circuits 265100 Interior Lighting 265600 Exterior Lighting 271100 Communications Equipment Room Fittings 271300 Communications Backbone Cabling 271500 Communications Horizontal Cabling Civil Specifications 015639 Temporary Tree And Plant Protection 024116 Structure Demolition 033053 Miscellaneous Cast-In-Place Concrete 221113 Facility Water Distribution Piping 221313 Facility Sanitary Sewers 311000 Site Clearing 312000 Earth Moving 321216 Asphalt Paving 321713 Parking Bumpers 323113.53 High-Security Chain Link Fences And Gates 329200 Turf And Grasses 334100 Storm Utility Drainage Piping 262200 262416 262726 262813 262816 263213 263600 264313 2. 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 11107/2014 1110/2014 11107/2014 11107/2014 10/24/2014 10124/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/2412014 10124/2014 11117/2014 10/24/2014 10/24/2014 CONTRACT TIME Pursuant to Section 8 of the Agreement, Construction Contractor shall substantially complete the Project within 436 calendar days from the Construction Commencement Date set forth in the Notice to Proceed provided by the Owner. Page 11 of 12 3. ATTACHMENTS The following attachments are incorporated herein by reference as if fully set forth herein: 1. GMP Amendment Proposal 2. Schedule of Values. 3. Construction Schedule. 4. Project Funding Schedule. IN WITNESS WHEREOF, the parties have made and executed this Amendment, to be effective on the last date and year set forth below. OWNER ~ CONSTRUCTION CONTRACTOR By: Its: By: Its: Date: Date: Attest: Attest: Bee Approval Date: Page 12 of 12 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 1 Summary of Work SECTION 1 - SUMMARY OF WORK January 29, 2015 The project consists of the following: • New Housing Pod Booking Area • • Sally Port • Kitchen • Connecting Corridor • Site Work • Renovation / Limited Remodeling of Existing Jail Building • Installation of Video Visitation in Existing Operations Building Approximate Building Areas (drawing T1.1): • Existing Administration (1 st Floor): 23,582 sf • New Booking Addition: 2,429 sf • New Sallyport Addition: 1,800 sf • New Freezer Addition: 958 sf • Housing Pod (1 st Floor): 39,425 sf • Housing Pod (2nd Floor): 14,017 sf The New Housing Pod includes: 124 beds (two-person cells) • • 96 beds (four-person cells) • 50 beds (dormitories) Construction consists of: • Site Work • Masonry • Structural Steel • Windows, Doors, Hardware, Finishes & Equipment • Detention Securities • Mechanical, Plumbing, Electrical Allstate Construction, Inc. page 1 of 1 Section 2 Pricing Summary Expansion of the Flagler County Inmate Facility Bunnell Florida SECTION 2 - PRICING SUMMARY Janurary 29, 2015 BASE GMP Base Price (Per 9-page Detailed Estimate dated 1/29/15 & GMP Clarifications & Assum tions er 6- a e Dated 1/29/15 Price $15,956,425 METAL ROOFING $109,210 R-30 banded insulation system (e.g. A4.3 , A4.4) : FLOORING $5,810 PLUMBING Route new sanitary sewer lines at Operations Center th rough existing Corridors 0103 and 0104 P1 .5 . $17,056 HVAC Exhaust fan EF-12 and related work (MD1 .1, IMD1.2 , IM1.2) . $9,341 TELECOMMUNICATIONS Data cabling (T1 .0, T1.1, & T1 .2) and Owner requested additional Housing cabl ing I(E2.2 & E2.3 with annotations transmitted 12/03/14) $48,899 ELECTRONIC SECURITY New controls for existing electronic security devices ("X"/ES1 .1, IES1.2) and new electronic security w iring, devices, and controls (sketches Alternate/Z-ES11 , Alternate/Z-ES12) including electrical raceways, conduits and boxes: $217,709 SITE WATER & SANITARY SEWER $4,443 New water service to Operations Center (C-601) : Channel-mounted grinder is not included (Alt #2/C-601): $73,389 ADDITIONAL SCOPE Total GMP $16,442,282\ Allstate Construction , Inc. Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL 01310.000 01310.200 01322.600 01410.000 01452.000 01510.000 01529.000 01560.000 01710.000 01740.000 --- Base Price Description Phase Cost/Unit Qty GENERAL REQUIREMENTS Construction Services Construction Overhead Construction Services Preconstruction Services Design Phase Services Bidding Bid Advertisements Copying & Reproduction Drawings & Specs Copying & Reproduction Permits NPDES - NIC BuildinQ Permit - Fire - NIC Building Permit Base Fees - NIC Water Tap Fee - NIC Fire Tap Fee - NIC Sewer Tap Fee - NIC FP&L Service - NIC Testing Laboratory Services Construction Materials Testing Testing Laboratory Services Temporary Utilities Temp Electricit)' Service Temp Electricity - HVAC Start-Up Temp Electricit)' - HVAC Start-Up ____ Temp Fire Protection Temp Water Service Temporary Utilities -Sanitary Facilities Ice, Water, Cups Sanitary Facilities Tempora_ry Barriers Temp Partition Temp Safet)' Rails Temp Fence Temporary Barriers Layout & Surveying -As-Built Survey Surve)' -- Layout & Surveying Cleaning Clean Up & Safety Dumpster Pull Fee Progress Cleaning Final Cleaning - General Trades Allstate Construction , Inc. Section 3 Detailed Estimate 1/29/2015 Total 1.001sum 560,400.00 Iisum 560,400 560,400 - Isum -Isum - each 0.00 Iisum O.OO/lsum 0.00 leach a a 160.50 Iset 23.00 set 0 3,692 3,692 - Isum - SQft - Isum - Isum -Isum - Isum - Isum 0.00 Iisum 0.00 ISQft O.OO/lsum O.OOllsum O.OOllsum O.OOllsum O.OOllsum a a 1.00 Isum 31,100.001lsum 31,100 31,100 14.00 4.00 4.00 20.72 14.00 mnth mnth mnth each mnth - 14.00 mnth - 200.00 5,000.00 2 500.00 53 .50 50.00 Imnth 1m nth Imnth leach 1m nth 2,800 20,000 10,000 1,109 700 34,609 23.54 1m nth 330 330 -- 65.80 IInft 3.21 IInft 3.75 IInft 461 2,334 1485 4,279 5,000.00 IIsum 800.00/trip 5,000 7200 12,200 7.00 Inft 727.00 Inft 396.00 Inft 1.001sum 9.00 tri ~ 1 - 1-~Isum 79.78 each 32.00 crhr - Isum I- 0 0 0 0 0 IIsum 294 .25 leach 50.00/crhr O.OOllsum 23,475 1,600 0 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Phase Section 3 Detailed Estimate Base Price Description CostlUnit Qty Total Cleaning 01780.000 25,075 Closeout As-Built Documents Closeout 2.00 set 160.50 Iset _. 321 321 672,005 GENERAL REQUIREMENTS EXISTING CONDITIONS 02419.000 02800.000 Selective Demolition Selective Demolition Operations Exterior Window Sill Demo SOG at Mechanical S11 0 (F1.1) Patching & Preparation Selective Demolition -- 1.001sum 1.00 Isum 1.00 each 5,637.00 sqft 128,562.00 300.00 300.00 1.00 Iisum Iisum leach Isqft -- 128,562 300 300 5,637 134,799 Hazardous Materials Asbestos Abatement - NIC Lead Abatement - NIC Mold Remediation - NIC EXISTING CONDITIONS Iisum Iisum Iisum Isum Isum Isum 134,799 CONCRETE 03210.000 -- 03220.000 03310.000 - - 03410.000 - 03413.000 - -- Reinforcing Steel Reinforcing Steel- Concrete - Incl Reinforcing Steel - Hollow Core Reinforcing Steel- MasonrY - Incl Reinforcing Steel Wire Mesh Wire Mesh - Incl Concrete Concrete Concrete SUQQort Services, Operations - Incl Mezzanine Infill Patch SOG at Mechanical S 110 (E1JJ Electronic Security Equip Pads Bond -Incl Concrete Isum 2 .02 ton Isum Allstate Construction, Inc. 2,118 2,118 Isum IIsum 1.001sum 1.00 Isum - Isum 228.00 sqft 25.00 sgft 48.00 sqft - Isum 675,800.00 Iisum 222 700.00 Iisum 0.00 Iisum 39.47 Isqft 10.00/sgft 10.00 Isqft 0.00 Iisum 675,800 222 ,700 a 9000 250 480 a 908,230 ...- Precast Structural Concrete Precast Concrete Detention Modules Precast Concrete Detention Modules Chase for Shower PEX Tubing Bond -Incl Precast Structural Concrete Hollow Core Concrete Hollow Core Concrete SUQQort Services Drill & Anchor - Labor Drill & Anchor - Material Hangers - Floor Door Hangers - Attic Stairs Hangers - Fixed Ladders Iisum 1,048 .60 Iton Iisum 1.001sum 1.001sum 24.00 each - Isum 1,795 ,000.00 138,825.00 500 .00 0.00 Iisum Iisum leach IIsum 1,795,000 138,825 12.000 a 1,945,825 1.001sum 1.001sum -1.001sum 1,060.00 set -1.00 set 1.00 set 8.00 set 1/29/2015 269,000.00 Iisum 13,397.00/Isum 6,500.00 Iisum 5.03/set 800 .00 Iset 800 .00/set 800 .00/set 269000 13,397 6,500 5,331 800 800 6,400 Page 2 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 3 Detailed Estimate Base Price ;-, Phase Description Cost/Unit Qty Total ~ 03413.000 Hollow Core Concrete Openings - Smoke Evacuation Grout Hollow Core Ends Bond 100.00 leach 10.38 Ilnft 4,200.00 Iisum 36.00 each 4,152.00Inft 1.00 Isum Hollow Core Concrete 03600.000 353,110 Grouting Grout Base Plates - General Trades 03810.000 3,600 43 ,083 4 ,200 - Isum O.OO/lsum 0 3.00 each 300.00 leach 900 900 Concrete Cutting Concrete Cutting Concrete Cutting CONCRETE 3,210,184 MASONRY 04200.000 --- -- Masonry Masonry Support Services, Operations Patch at Electrical - Labor Patch at Electrical - Material Visitation Wing Walls - Inmate Side Visitation Wall Cap - Public Side - NIC CMU to Hollow Core Joint Additional Secure Walls 2.50" Insulation instead of 2.00" O~erations Exterior Window Infill Flashing Wall Bracing at 10' oc Bond -Inc! 1,336,701 1,336,701 Structural Steel Framing --1.00lsum 1.00lsum 0.32 ton - Isum 1.00 Isum 47.25 set 1.00 each -- - Isum 319,480.00/Isum 88,237.00 IIsum 5,000.00 Iton O.OOllsum 15 380.00 IIsum 300.00/set 500.00 leach O.OO/lsum Structural Steel Framing 05520.000 05530.000 ° 12,261 39,331 5145 1,080 885 9075 MASONRY Structural & Misc Steel Framing .fu!J>....eort Services -----Supplementary Fram ing - Folding Ladder SUQQlementarY Framing - Mezz Barrier - NIC Privacy Screens Non-Load-Bearing Wall Supports Roof O(lening Bond -Inc! 05513.300 995 ,700 244,900 9,321 7,228 11 ,775 Masonry METALS 05120.000 995,700.00 Iisum 244,900.00 Iisum 116.52/crhr 100.39 leach 15.00/blk O.OO/blk 2.49 Ilnft 256.26 Icu1'd 0.50/sqft 12.00/blk 5.00 IInft 50 .00 leach IIsum 1.00lsum 1.00 Isum 80.00 crhr 72.00 each 785.00 blk - blk _. 4,927.00 Inft -153.48 cU1'd 10,231 .16 sqft 90.00 blk 177.00Inft 181 .50 each Isum Steel Ladders Steel Ladders - General Trades Steel Railings Steel Railings - Attic Steel Railings - Roof - NIC Steel Railings ,-. Isum 842.00 Inft - Isum I 319,480 88 ,237 1 600 0 15,380 14,175 500 0 439,372 IIsum 57.45 IInft O.OOllsum 48,373 0 48,373 Steel Gratings Mezzanine Barrier - NIC Allstate Construction , Inc. Isum 1/29/2015 IIsum Page 3 Expansion of the Flag/er County Inmate Facility Bunnell, FL Phase Section 3 Detailed Estimate Base Price Description II Qty I,', Cost/l!Init ,< 05580.000 06105.000 06110.000 06111.000 06410.000 06650.000 07110.000 07211.900 07411.300 07520.000 07810.000 Formed Metal Security Soffits - General Trades METALS WOOD & PLASTICS General Trades General Trades Wall Blocking - General Trades Roof Blocking - General Trades General Trades Lumber - Wall Blocking Lumber - General Trades Lumber - Roofing Lumber - General Trades Architectural Cabinets Cabinets - Allowance Architectural Cabinets Simulated Wood Trim HOPE Trim -Install HOPE Trim - Fabrication HOPE Trim - Material HOPE Trim - Fasteners Simulated Wood Trim WOOD & PLASTICS THERMAL & MOISTURE Dampproofing Oampproofing Dampproofing Foamed-in-Place Insulation Foamed-in-Place Insulation Support Services - Incl Sprayed Insulation Foamed-in-Place Insulation Metal Roofing Metal Roofing SU020rt Services Banded Insulation System Wood Blockin~ Bond -Incl Metal Roofing Membrane Roofing Membrane Roofing~ ort Services Roof to Wall Flashing Bond -Incl Membrane Roofing Sprayed Fireproofing Sprayed Fireproofing - NIC Allstate Construction, Inc. Tetal '< i I -Isum I O.OO/lsum a 487,745 I, I I 1.001sum ,, - Isum I; -Isum i 234,316.00/Isum O.OO/lsum O.OO/lsum i 234,316 a a 234,316 1 - Isum I -Isum 78.00 Inft 8.00 24.00 8.00 120.00 crhr crhr pce Inft I I Ii ! O.OO/lsum 0 0.00 Iisum a 350.00 Ilnft 27,300 27,300 116.52/crhr 116.52/crhr 991 .78 Ipce 0.47 IInft 932 2,796 7,934 56 11,719 273,335 I ! I ! 1.001sum 1.001sum - Isum 1.00 Isum ! 14,000.00 IIsum 14,000 14,000 17,927 I 17,927.00Ilsum 0.00 IIsum 4,277.00 IIsum 1 i; II i I 1.001sum I 658,579.00 IIsum 88,752.00 IIsum 1.001sum 1 0.54/sqft 41 ,109.00 sgft I 1.001sum i 4,412.00/Isum Iisum - Isum II a 4,277 22,204 658,579 88,752 22,154 4 ,412 773,897 I 1.00 Isum : 176.001nft I - Isum I 15,000.00 IIsum 15.00 IInft O.OO/lsum I -15,000 2,640 0 17,640 I Isum 1/29/2015 i IIsum Page 4 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 3 Detailed Estimate Base Price ,. Rhase Description ' :', Qty Firestopping -Isum 07950.000 FirestoppinQ - General Trades Expansion Joint Covers ~ansion Joint Covers - NIC - Isum i 08121.300 a 0.00 /Isum a 0.00 Iisum i I OPE NINGS Doors, Frames & Hardware - In Div 11 Hollow Metal Frames ! I THERMAL & MOISTURE Doors, Frames & Hardware l etal i 07840.000 08110.000 Cost/Unit \' 827,741 I I Isum HM Frame - Install - Div 04 HM Frame - Install in ExistinQ Walls HM Frame - Install in Existing Walls Stack & Protect HM Frames Hollow Metal Frames 40.00 10.00 80.00 Iisum I 0.00 Iisum 101 .32 /crhr 53.50 leach 40 .00/crhr Isum crhr ! each I crhr I I I - - a 4 ,053 535 3,200 7,788 ! i 08131 .300 Hollow Metal Doors Isum 08141.600 HM Door -Install- In Div 11 Wood Doors Isum 08310.000 Wood Door - Install - In Div 11 Access Panels 08330.000 Floor Hatches - General Trades Access Panels - Div 21 , 22, 23, 26 Coiling Doors & Grilles - Isum -Isum Door Hardware Isum 08810.000 Isum 08910.000 Glass & Glazing - In Div 11 Louvers -- Isum ! 3,595.00 leach 14,380 14,380 i /lsum Ij I /lsum I /Isum 22,168 I Veneer Plaster Texture Hollow Core - NIC Gypsum Board Gypsum Board & Acoustical Ceilings SUPl20rt Services, Ol2erations Patch at Electrical Infill Existing Window -Isum ~ I 1.00 1sum 1.001sum ! 6.00 each i 1.001sum I I /Isum 14,914.00/lsum 115,515.00 /lsum 200.00 leach 400.00/lsum I I -- 1.00 Isum ~ 1 ,459.00 /lsum 1.00 Isum I 34,775.00/lsum Tile Acoustical Ceilings Acoustical CeilinQ - in Gypsum Board Patch Support Services Allstate Construction , Inc. a a I Gypsum Board 09510.000 I 0.00 /Isum O.OO/lsum I FINISHES Tile Tile Support Services, Ope rations I 1 Louvers - In Div 23 OPENINGS 09300.000 /lsum i Door Hardware - In Div 11 Glass & Glazing 1----- i I 4.00 each 08710.000 09290.000 /Isum ! Overhead Coiling Doors Coiling Doors & Grilles 09260.000 i I -Isum 4,324.00 sqft 1/2 9/2015 I I I I 14,914 115,515 1,200 400 132,029 - -- 1,459 34 ,775 36,234 O.OO/lsum 2.75 Isqft a 11 ,891 Page 5 Expansion of the Flag/er County Inmate Facility Bunnell, FL Phase Section 3 Detailed Estimate Base Price Description eost/l:Jnit Qty Total r 09510.000 09650.000 09672.300 09680.000 09840.000 09910.000 10140.000 - 10211.000 10281.313 10441.300 - 11190.000 Acoustical Ceilings Patch Operations Acoustical Ceilings Resilient Flooring Floor Waxing - General Trades Resinous Flooring Res inous Flooring & Base Court Holding S111 - Allowance Grind Existing Floors - Incl Shower Floors & Base - Allowance Shower Walls - NIC Resinous Flooring Carpeting Car~et & Resilient Flooring Sup~ort Services, Operations VCT instead of LT Connecting Corridor Grind Existing Floors Carpet Control Room M209 - Allowance Carpeting Acoustical Wall Panels Acoustical Wall Panels - NIC Painting Painting Support Services, Operations Paint Visitation Wing Walls Paint Mezzanine Barrier - NIC Plumbing Fixture Security Sealants Painting FINISHES SPECIALTIES Signage Panel Signs - Allowance Stencil - Labor - Allowance Stencil - Paint - Allowance Stencil - Kits - Allowance Signage Toilet Compartments Toilet Compartments - General Trades Toilet Accessories Toilet Accessories - General Trades Fire Extinguishers & Cabinets ' Fire Extinguishers - General Trades SPECIALTIES EQUIPMENT Detention Equipment Detention Equipment Allstate Construction , Inc. 2.75 Isqft 969.00 sqft 0.00 Iisum a 47,470.00 Iisum 15.00 Isqft Isqft 15.00 Isqft 0.00 IS9ft 47,470 2,631 17,417.00/Isum 23,488.00 Iisum 26,323.00 Iisum 1.83 Isqft 3.00/sgft 3.33 Isqft 17,417 23,488 (26, 323 t 1,757 6,198 3930 26,467 -Isum 1.00 175.38 1,459.00 - Isum sqft sqft sqft S9 ft 2,665 14,556 21,885 0 71,986 _. 1.001sum 1.001sum -1.00 Isum 960.00 sqft 2,066 .00 sgft 1,179.00 Sqft -Isum /Isum 1.001sum 1.001sum 1,670.00 sgft Isum 86.00 each 180,424.00 Iisum 45,738.00 Iisum 1.00 Isqft Iisum 15.00 leach 1,290 229,122 510,393 1,567 4,661 - -365 1,679 8,271 - Isum 0.00 /Isum a - Isum O.OO/lsum a - Isum 0.00 Iisum each crhr set each -. - - 180424 45,738 1,670 71.24 leach 116.52 Icrhr 1.60/set 335.71 leach - 22.00 40.00 228.00 5.00 .- I -- a 8,271 1.001sum 1/29/2015 1,743,410.00 Iisum 1,743,410 Page 6 Expansion of the Flagler County Inmate Facility Bunnell, FL Phase 11190.000 11232.600 11330.000 11400.000 11520.000 21130.000 22010.000 - -- - 23010.000 23059.000 Base Price Description Cost/lJJnit Qty Detention Equipment Detention E9!!ll2ment Detention Eg!:!!l2ment Detention Equipment Omit Sup~ort BldgJ:!~grades Cell Benches - Allowance Pistol Lockers - Allowance Bond -Inc! Detention Equipment Laundry Equipment Laundrv Equipment Folding Table Shelving Carts Laundry Equipment Retractable Stairs Retractable Stairs - General Trades Food Service Equipment Food Service Equipment Food Service Equipment Audio-Visual Equipment TV Brackets - NIC EQUIPMENT FIRE PROTECTION Fire Sprinkler System Fire Sprinkler System Support Services -Incl Bond -Inc! -Fire Sprinkler S~stem FIRE PROTECTION PLUMBING Plumbing Plumbing Support Services, Operations -LP to Natural Gas Conversion - Allowance Insulate & Cover Exterior P i~g Bond -Incl Plumbing PLUMBING HVAC HVAC HVAC HVAC -Support Services, Operations Bond -Inc! HVAC Testing, Adjusting & Balancing Allstate Construction, Inc. Section 3 Detailed Estimate 1/29/2015 - Isum -Isum -Isum -1.00Isum 4.00 each 1.00 Isum - Isum O.OO/lsum O.OO /lsum O.OOllsum 105,109.00 IIsum I 1,000.00 leach 1,000.00 IIsum O.OOllsum Tatal 0 0 0 (105,109) 4000 1,000 0 1,643,301 2.001sum 1.00 each 6.00 each 4.00 each 24,338.00 IIsum 843.65 leach 608.25 leach 1,126.13 leach 48,676 844 3,650 4,505 57,674 -Isum O.OOllsum 0 1.001sum 365,750.00 IIsum 365 ,750 365,750 - Isum O.OOllsum 0 2,066,725 1.001sum - Isum - Isum 306,300.00 IIsum O.OOllsum O.OOllsum - - -- 1.001sum 1.001sum 2.00 each 1.001sum -Isum 674700.00 IIsum 192,300.00 IIsum -- 1.001sum 1.001sum 1.001sum - Isum 480 .25 leach 507.00 IIsum O.OOllsum 306 ,300 0 0 306,300 306,300 674,700 192,300 961 507 0 868,468 868,468 - 1,068,000.00 IIsum 166,870.00 IIsum 238,800.00 IIsum I O.OOllsum 1,068,000 166,870 238800 0 1,473,670 Page 7 Expansion of the Flagler County Inmate Facility Bunnell, FL Phase 23059.000 23080.000 23090.000 26010.000 27100.000 31050.000 - 31311.600 32172.600 32310.000 32900.000 33310.000 Section 3 Detailed Estimate Base Price Qty Description Testing, Adjusting & Balancing Testing, Adjusting & Balancing - Inc! Isum HVAC Commissioning 1.00 Isum HVAC Commissioning HVAC Commissioning HVAC Controls HVAC Controls - Inc! Isum HVAC ELECTRICAL Electrical Electrical - Isum Electrical 1.00lsum Support Services, Operations 1.00 Isum Concrete Cutting 1.00 Isum 3.00 each Increase Gate Operator Service - Allowance -Isum Bond -Inc! Electrical Structured Cabling Structured Cabling System - NIC - Isum Fiber OQtic Cabling between Buildings 1.00lsum Structured Cabling ELECTRICAL SITE Site Site Construction 1.00 Isum 1.00 Isum Site Water & Sanitat}' Sewer 1.00lsum Site Construction , Water & Sanitat}' Sewer 5' Outside to l' Aff 3.00 each - Isum Bond - Incl - - -Site -- Termite Treatment Termite Treatment - General Trades - Isum Tactile Warning Surfacing ADA Tiles 2.00 set Tactile Warning SurfaCing Fencing Fencing - Allowance 2,249.00 Inft 671 .00 Inft Razor Wire Brackets - Allowance SlidinQ Gates & Operators - Allowance 3.00 each 2,217.001nft Concrete Barrier - Allowance Fencing -Landscaping 184,015.00 sqft Seeding 33,368.00 sqft Sodding Landscaping Site Sanitary Sewer S},stem ---Vertical Auger Monster - NIC - Isum Allstate Construction , Inc. 1/29/2015 Cost/Unit Total IIsum 6,740.00/1sum 6,740 6,740 Iisum 1,480,410 0.00 Iisum 797 ,079.00 Iisum 316,996.00/1sum 5,000.00 Iisum 5 000.00 leach O.OO/lsum 0 797 ,079 316,996 5,000 15,000 0 1,134,075 O.OO/lsum 30,000.00 Iisum 0 30,000 30,000 1,164,075 880,825.00 Iisum 215648.00/1sum 53,788.00/1sum 880,825 215,648 53 ,788 1,500 0 500.00 leach O.OO/lsum 1,151,761 a O.OO/lsum -261 .82/set 524 524 100.00 Ilnft 37.50 Ilnft 10 ,000.00 leach 21 .39 Ilnft 224,900 25,163 30000 47,411 327,473 0.03 Isqft 0.25/s9ft - 5,788 8,342 14,130 -- Iisum Page 8 Expansion of the Flag/er County Inmate Facility Bunnell, FL Phase Description 33310.000 Site Sanitary Sewer System Horizontal AUQer - NIC Site Gas Service Site Gas Line - NIC Antenna Towers Modifv Guv Wires - Allowance Antenna Towers SITE 33811.600 Base Price ~; .1 33510.000 Section 3 Detailed Estimate Qty .'1 II - Isum J Cost/Unit IIsum vatal . - I Isum I I IIsum 1.001sum ! 10,000.00 Iisum I I I 10,000 10,000 1,503,888 Estimate Totals Description Totals Amount Rate Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts 20,193 Gen Liability - Div 2-33 Bldrs Risk Insurance 49,465 P&P Bond 3,268 Contingency 104,671 301,106 Construction Fee 600,000 Total (Base Price) Allstate Construction, Inc. 4,515 15.956,425 1/29/2015 Page 9 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 3 Detailed Estimate R-30 VRR Faced Insulation Phase CostlUnit Qty Description Total THERMAL & MOISTURE 07411.300 Metal Roofing Metal Roofing R-19 Metal Roofing R-30 VRR Faced Metal Roofing THERMAL & MOISTURE -1.00Isum 1.001sum 658,579.00 Iisum 764,264.00 Iisum I (658,579} 764,264 105,685 105,685 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction , Inc. Totals Amount Rate 151 339 894 2,141 109,210 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Quarry Tile in Freezer-Cooler .. . ;.: Phase Section 3 Detailed Estimate r·. :, Cost/Ulnit Qty Desoriptia.n '.' 09300.000 .,.,., Tatal ' I FINISHES Tile Tile - Freezer-Cooler Tile FINISHES I 1.00lsum J I ! 5,622.00 Iisum 5,622 5,622 5,622 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction , Inc. Amount Totals Rate 8 18 48 114 5.810 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Operations Sanitary Sewer in Existing Corridors - Phase 01560.000 03310.000 09680.000 22010.000 Descriptian Cost/Unit Qty GENERAL REQUIREMENTS Temporary Barriers Tem~ Partition & Protection Temporary Barriers GENERAL REQUIREMENTS CONCRETE Concrete Patch SOG Concrete CONCRETE FINISHES Carpeting Patch Flooring Carpeting FINISHES PLUMBING Plumbing Operations Sanital}' as Shown Plumbing PLUMBING Section 3 Detailed Estimate 121.00 Inft 30.00 Ilnft Total 3,630 3,630 3,630 1.00 Isum 10,000.00 Iisum 10,000 10,000 10,000 1.00 Isum 755.00 Iisum 755 755 755 1.00lsum 2,100.00 Iisum 2,100 2,100 2,100 Estimate Totals Descriotion Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction , Inc. Amount Totals Rate 26 18 53 140 334 17,056 1/29/2015 Page 1 Expansion of the Flalger County Inmate Facility Bunnell, FL H VAC Alternate #1 - Exhaust Fan (F-12) Phase 05520.000 07520.000 09910.000 23010.000 26010.000 Description Cost/Unit Qty ,: METALS Steel Railings Steel Railings - Roof Steel Railings METALS THERMAL & MOISTURE Membrane Roofing Patch Roofing Membrane Roofing THERMAL & MOISTURE FINISHES Painting Paint Railings Painting FINISHES HVAC HVAC EF-12 HVAC HVAC ELECTRICAL Electrical Electrical Electrical ELECTRICAL Section 3 Detailed Estimate 14.00 Inft 100.00/1nft Total 1,400 1,400 1,400 1.00lsum 2,500.00 Iisum 2,500 2,500 2,500 14.00 Inft 7.14/1nft 100 100 100 1.00 Isum 2,040.00 Iisum 2,040 2,040 2,040 1.00lsum 3,000.00 Iisum 3,000 3,000 3,000 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction , Inc. Amount Totals Rate 13 29 76 183 9.341 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 3 Detailed Estimate Data Cabling System ; Phase 27100.000 Description Cost/Unit Qty ELECTRICAL Structured Cabling Structured Cabling....§.~stem Fiber O~tic Cabli!l9 between Buildings - Incl___ Structured Cabling ELECTRICAL 77,320.00 Iisum 30,000.00 Iisum 1.001sum -1.00Isum I Total 77,320 (30,000) 47,320 47,320 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction, Inc. Amount Totals Rate 68 152 400 959 48.899 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Electronic Security in Existing Building Bhase . , IDescripti0n Qty <.:': " 0.25 Isgft i 1,492 1,492 1,492 i I .. i i i Concrete Concrete - Patching Concrete CONCRETE MASONRY 1.00lsum I 5,000.00 Iisum 5,000 5,000 5,000 116.52/crhr 100.39 leach 18,643 11,143 29,786 29,786 I i I I Masonry Patch at Electrical - Labor Patch at Electrical - Material Masonry 160.00 crhr 111 .00 each Ii I I ! ! METALS _. I i MASONRY 05580.000 l otal I 5,966.00 sgft CONCRETE 04200.000 Cost/l:!lnit I Cleaning Final Cleaning Cleaning GENERAL REQUIREMENTS 03310.000 ·f I GENERAL REQUIREMENTS 01740.000 Section 3 Detailed Estimate I! Formed Metal Securit)' Soffits Formed Metal 612 .00 Inft I I 46.63/1nft METALS 1 FINISHES iI Acoustical Ceilings Acoustical Ceiling - Patch SU()()ort Services Acoustical Ceilings 1,380.00 sqft ! I Painting Painting - Patching Painting I 5,966.00 ~ft ..~._ _. II -. 28,535 28,535 28,535 I I 09510.000 09910.000 FINISHES ... 26010.000 ~-----. Detention Equipment Detention Egui()ment Detention Equipment EQUIPMENT ELECTRICAL _- _ 1.75/sg fL.. - I, . ._--- i .. 10,441 10,441 14,236 I 1.00lsum I 105,109.00 Iisum i I ~ 105,109 105,109 105,109 I I I Electrical Electrical Electrical ELECTRICAL Allstate Construction , Inc. 3,795 3,795 i EQUIPMENT 11190.000 2.75/sgfL.. 1.00Isum..J i i 1/29/2015 25,137.00 /lsum 25,137 25,137 25,137 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Electronic Security in Existing Building Section 3 Detailed Estimate Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction, Inc. Amount Totals Rate 11 268 1,410 675 1,782 4,269 217.709 1/29/2015 Page 2 Expansion of the Flag/er County Inmate Facility Bunnell, FL Water Service to Existing Operations Center . Rhase 32900.000 33120.000 Description Qty " Section 3 Detailed Estimate Cost/Unit ",J, T0tal. ';" SITE Landscaping Sodding Landscaping Site Water System Site Water Line Site Water System SITE I 1 300.00 S9ft 0.33 Is gfL .._. I I 1.001sum I I, i 100 100 .. 4,200.00 Iisum 4,200 .. 4,200 4,300 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction, Inc. Amount Totals Rate 6 14 36 87 4,443 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Sewage Grinder #2 - Channel Mount Phase 26010.000 32900.000 33310.000 Description CostlUnit Qty ELECTRICAL Electrical Electrical - Allowance Electrical ELECTRICAL SITE Landscaping Sodding Landscaping Site Sanita~ Sewer S~stem Channel-Mount Grinder Site Sanitary Sewer System SITE Section 3 Detailed Estimate 1.00 Isum 25,000.00 Iisum Total 25,000 25,000 25,000 800,00 sgft 0.25/sgft 200 200 1.00 Isum 45 820.44 Iisum 45,820 45,820 46,020 Estimate Totals Description Building Permit Fees - NIC Gen Liability - Div 1 Gen Liability - Subcontracts Gen Liability - Div 2-33 Bldrs Risk Insurance P&P Bond Contingency Construction Fee Total Allstate Construction, Inc. Amount Totals Rate 101 228 601 1,439 73.389 1/29/2015 Page 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions SECTION 4 - CLARIFICATIONS & ASSUMPTIONS January 29, 2015 General 1. Construction Manager's Fee (OH & P) (Section 4, B) is included fixed at $600,000 lump sum. 2. Flagler County's Design Professional has accepted these clarifications and assumptions (CRA letters dated January 6 & 7,2015). • A "conformance" set of drawings and specifications will be issued after GMP approval and construction notice-to-proceed. The "conformance" set will include only these clarifications and assumptions. 3. Preconstruction services $40,000 (Flagler County PO No. 021821 dated July 25,2014) is separate from, and not included in, this GMP. 4. LEED compliance is not included (e.g. 1.3, B/033053; 1.6, Eli 02213). 5. Compliance with project labor agreements are not included (3.07/078400). 6. "Prevailing wages" are not included (1.02, F/011 000). 7. The following utilities connection fees are not included. • City of Bunnell Utilities water capacity, impact, or, systems fees (General Note-7/FO.1, IPO.1) o As confirmed with Mr. Bill Green of the City of Bunnell Utilities Department "no connection fees will apply" when tap connections are performed by qualified site utility contractor .. It is understood there are no Flagler County water connection fees. • City of Bunnell Utilities sewer connection fees (General Note-71 PO.1) o As confirmed with Mr. Bill Green of the City of Bunnell Utilities Department "no connection fees will apply" when tap connections are performed by qualified site utility contractor. It is understood there are no Flagler County sewer connection fees. • Water meter fee (2.16, A/221113). o As confirmed with Mr. Bill Green of the City of Bunnell Utilities Department "No Water meter fees will apply" when required Water meters are provided and installed by qualified site utility contractor. It is understood there are no Flagler County water meter fees. • Natural gas connection or services fees. o Site Gas services; piping, meters and regulators, are to be provided by Gas service provider to locations as follows: • Outside new Sallyport (Rm# S123) as indicated on plan sheet P1.1. • Outside existing Mechanical Room (Rm# S11 0) as indicated on plan sheet P1.1. • Outside new Laundry Room (Rm# M1 07) as indicated on plan sheet P1.1. • FP & L electric connection fees (General Note-4/EO.1) (Per Owner, these are paid directly by Flagler County). 8. Flagler County building permit fees are not included (Per Owner, these are paid directly by Flagler County). • Planning, zoning, development, growth management fees are not included. • SJRWMD permits have been received by Flagler County. 9. The following specifications are not included (not received). • 018113 - Sustainable Design Requirements • 018153 - LEED Product Submittal Data Form • 105050 - Metal Lockers • 105310 - Aluminum Walkway Canopy System • 260130 - Quality Requirements 10. Owner direct purchase program includes individual purchase orders for greater than $10,000. 11. Classroom additions are not included. • Design is pending. Final price is pending. • If one (1) 1,000 sqft classroom is required, budget. .................................................... add $217,500 • If two (2) 1,000 sqft classrooms are required, budget ................................................. add $435,000 Allstate Construction, Inc. page 1 of 6 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions Selective Demolition 12. Asbestos, lead, mold and other hazardous or toxic material survey, testing or abatement is not included. Concrete 13. Existing Support Services laundry lint trough remains as-is (C/P5.2). Precast Concrete Detention Modules 14. Detention cell and shower modules are not able to achieve the fire-rating certifications or labeling (1.2, E/0341 00 versus T1.1, LS1.1, LS1.2). 15. Two-man cell dimensions match drawings (11 /A5.1). • The Design Professional will confirm that the dimensions conform to ADA. 16. Lower modules are six-sided, connecting to concrete foundations (9/S0.3) instead of fivesided, connecting to concrete slab-on grade (3/A4.4). Masonry 17. Infill existing window at Operations Center a shown on Allstate Construction, Inc. 12-05-14 sketch. 18. Cavity wall flashing is rubberized asphalt (3/A4.1, 5/A4.1). Steel 19. Fabricator's standard primer is included (2.01, H/051200) instead of sole-source Tnemec (Structural Metals Note-7/S0.1). 20. Hoist beam and support framing is not included (2/A4.3). 21. Embedded sill angles at overhead doors are not included (20/A7.1). 22. Dayroom stair railings are four-line plus hand rail (6/A5.0, 12/A5.0) instead of pickets (3/A4.4). 23. Mezzanine guard rails are three-line without hand rail (6/A5.0, 12/A5.0). 24. Attic space guard rail is two-line without hand rail (13/A5.0). 25. Embedded stair nosings are not included (2.01, H/055000). 26. Mezzanine mesh barrier is not included (3/A4.4, 6/A5.0). • If mezzanine mesh barrier is required ....................................................................add $184,108 a 14 gauge security hollow metal made in 4' wide x 13'-0" +/- tall panels with a 2x2x1 /8" woven wire mesh inserts. Rough Carpentry 27. Preservative-treated wood blocking is included at concrete masonry instead of fire-retardant treated (4/A5.2). Cabinets 28. Cabinet work is included: • Processing Counter S131 (SK1-1.1). • Control Room M209 (A1.4A, F/ES2.0). • Reception (AlES2.0). Metal Roofing 29. Retrofit framing system is included (1/S2.5 versus metal building framing 2.5/133419). 30. The following panels are included. • Roof panels: Architectural Metal Systems (2.6/133419). • Wall panels: Architectural Metal Systems (2.7/133419). 31. Roof and wall insulation is generic VRR-faced (2.8/133419). 32. Roof insulation is R-30 VRR-faced, long tab, banded instead of either bag-and-sag batts (e.g. A4.3, A4.4), Butler mesh (2.9/133419) or Butler liner panels (2.10/133419). 33. Kynar finished aluminum gutters and downspouts are included instead of stainless steel (076310). Allstate Construction, Inc. page 20f6 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions Fireproofing 34. Sprayed fireproofing is not included (078123 versus Project Informationff1.1). Firestopping 35. Firestopping installation is by manufacturer's approved applicator. • Third-party certification is not required (1.08, C/078400). 36. Firestopping is not included at exterior walls of connecting corridor (LS1.0, LS1.1). Expansion Joints 37. Expansion joint assemblies are not shown or included (079500). Doors, Frames & Hardware 38. Jamb, head and sill details at precast concrete detention modules are shown on Allstate Construction, Inc. 12-02-14 sketch. Floor Door 39. Floor door is not fire-rated or smoke rated (LS1.2). Overhead Doors 40. Overhead doors are not insulated (083333 versus A7.0). Gypsum Board 41. Secure mesh is ASF1.5-9F instead of ASF-1.5-9R (2.3, A/102213). 42. Existing Operations Center classroom wall remains as-is (01.2, A 1.5). • Existing finishes are protected and neatly modified during renovations. Ceilings 43. Existing Operations Center ceilings are replaced in Public Video Visitation 0100, Men's 0101 and Women's 0102. • Other existing Operations Center ceilings are protected during renovation and remain as-is (A 11.3). Resinous Flooring 44. Resinous flooring is Gold Medal Deco-Floor Quartz system (096723). 45. Resinous flooring allowance (labor and materials) is included in Court Holding S111 instead of carpet (A11.0). 46. Resinous flooring (096723) allowance (labor and materials) is included at (Interior Finish Note 1/A11.1,/A11.2): • Shower only (S133/A1.1). • Showers A102, 8105, C105, 0105, E105, F105 (A1.3A) Showers G105, H105, 1105, J105, K105, L 102 (A 1.38). Showers C205, F205 (A 1.4A). • Showers 1205 (A 1.48). 47. Fiberglass-mat reinforced epoxy wall coating is not included (099600). Flooring 48. Floor tile is Oal-Tile Porcealto unpolished Group I (2.06/093000). 49. Wall tile and line is not shown or included (2.04, 2.05/093000). 50. VCT is included instead of Marmoleum (096519). 51. Existing Operations Center flooring is replaced in Public Video Visitation 0100, Men's 0101 and Women's 0102. • Other existing Operations Center flooring is protected during renovation and remains as-is (A 11.3). 52. Carpet is included instead of sealed concrete in Control Room M209 (A11.2). 53. Quarry tile is included in Freezer S1 05C and Cooler S1 058 (FS1.1) instead of exposed floor panels (A11.1). Allstate Construction, Inc. page 3 of 6 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions Painting 54. Existing Operations Center walls are re-painted in Public Video Visitation 0100, Men's 0101 and Women's 0102. • Other existing Operations Center walls remain as-is (A11.3). 55. Manufacturer's standard, clear, curing-sealing compound (e.g. Euclid Aqua-Cure VOX) is included at exposed concrete floors ("SC"/A 11.x) instead of either high-gloss finish (2.04, 0/033000) or acrylic floor coating (2.03, B, 5/099100). 56. Hollow core as-cast finish is field-painted. • Texturing of planks or caulking of joints is not required. Signs 57. Neither signage schedule nor sketches are shown or included (2.03/104400) • Sign allowance (labor and materials) is included for signs as shown on attached sketches by Allstate Construction, Inc. 58. Sign specifications as follows do not apply: • Exterior signs (2.03/104400). • Metal Logo (2.04/104400). • Evacuation signs (2.05/104400). Toilet Partitions 59. Column-to-column privacy screens are too long for HOPE (6/A5.1, 7/A5.1). • Stainless steel partitions are included. Visitation Partitions 60. Stainless steel slanted writing shelf (3/A5.2) allowance (materials and labor) is included. 61. Single-piece, vertical brackets are included instead of two-piece (A5.2). 62. Two "typical" partitions are included at ends instead of one single-piece partition (4/A5.2). 63. HOPE is not recommended for inmate-side partitions (A 1.1, A 1.3A, A 1.3B). • Painted masonry wing walls are included. Fire Extinguishers 64. Bracket-mounted fire extinguishers are included at (2.03/104416 versus "LS" drawings): • Mechanical M105, M111, M112 • Electrical M106, M204 • Kitchen S1 05 65. Fire extinguisher cabinets are not shown or included (2.05/104416). Laundry Equipment 66. Washers are ElectroluxW5350X and dryers are American Dryer Corporation AO-120i instead of Uni- Mac (109900). 67. LP to natural gas conversion kit allowance (labor and materials) for existing dryers is included pending confirmation by new gas supplier and existing dryer manufacturer (E/P2.2, 109900). Food Service Equipment 68. Mobile pan racks (item #18) are existing to remain (FS1.1) instead of new (11400). 69. Double convection oven (item #21) is Garland (11400) instead of Blodgett (FS1.1). 70. Three mobile tray units (item #36) are included (FS 1.1) instead of four (11400). Equipment 71. Lapeyre Stair does not produce retractable stairs (055133 versus 3/A4.3). • Standard "Precision Ladders" is included. Allstate Construction, Inc. page 4 of 6 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions Detention Furnishings 72. Holding cell benches allowance (labor and materials) is included pending design layout (A1.1). 73. Pistol locker allowance (labor and materials) is included pending quantities desired (2.01, C/11197). 74. TV's and TV brackets are not included (E2.2). Plumbing 75. Embedded PEX tubing is included for the precast concrete showers (E/P2.3). 76. Operations Center new 2-1/2" water line extends above ceiling in Women's Lockers and is insulated and covered on the exterior wall (C/P1.5). HVAC 77. $880 payment to engineer-of-record is not required (1.4, 0/230900). 78. Smoke dampers or fire dampers are not shown or included at WHP-1, -2 (A 1.3A versus LS1.0, LS1.1). 79. Existing RTU's-12, -14 remain in place, as-is (Demolition Keynote-22/MD1.1). 80. Exhaust fan EF-12 and related work is included (Alt #1/MD1.1, IMD1.2, IM1.2). Electrical 81. $2,560 payment to engineer-of-record is not required (1.11/260943). 82. Existing Operations Center classroom receptacles remain as-is (ED2.2, E2.4). 83. Three-phase service to motor-operated gate allowance (labor and materials) pending design (2.5, C, 3/323113.53 versus E1.0). 84. Sewage grinder alternate includes electrical service allowance (labor and materials) pending design (E1.0). 85. Electrical warranties are included. • 12-m onth's "maintenance service" is not included (3.7/260100, 1.11/263213). 86. Videography is by Allstate Construction, Inc. employees instead of "commercial videographer" (3.3, A/260190). 87. Building grounding is included (E4.4). • Lightning protection system is not shown or included. • If lightning protection system for New Housing is required ............................................. add $39,738 • If lightning protection system for New Booking, Sallyport, Kitchen additions and the existing Support Services Building is required, ............................................................................ add $82,946 Smoke Control System 88. The smoke control system is specified across divisions 23 and 26. • Separation of HVAC subcontractor and fire alarm subcontractor, as shown on Allstate Construction, Inc. 11-19-14 sketch approved by the engineer of record, is included. Telecom m u nications 89. Telecommunications conduits, boxes and cabling are included. 90. Existing classroom communications rough-in remains as-is instead of new (E2.4). 91. Telephone devices and head-end equipment are not included. Electronic Security 92. New controls for existing electronic security devices ("X"/ES1.1, IES1.2) and new electronic security devices and controls (sketches Alternate/Z-ES11, Alternate/Z-ES12) are included. Allstate Construction, Inc. page 5 of 6 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 4 Clarifications & Assumptions Site 93. Geotechnical test pits are not included (pages 4 & 12/Universal Engineering Services, 06-19-14). • If geotechnical test pits are required, ...................................................................... add $8,267 94. Removal and replacement of unsuitable soils is not included (page-5/Universal Engineering Services, 06-19-14). • If removal and replacement of unsuitable soils is required, .................................... add $21.41 /cuyd 95. Tree pruning, tree service and arborist work are not included (015639). 96. Additional asphalt parking is not included (Alt #3,C-301). • If additional asphalt parking is required, .................................................................. add $20,107 Site Water & Sanitary Sewer 97. New water service to Operations Center is included (C-601). 98. Channel-mounted grinder is included (Alt #2/C-601). Site Gas 99. Natural gas piping from supply to the following are not included: • Meter and regulator outside Mechanical S11 0 (P1.1). • Meter and regulator outside Mechanical M1 05 (P1.3A, P1.38). Fencing 100. Fencing, gates, gate operators, razor wire and concrete barrier allowance (labor and materials) is included pending design (323113.53) • Allowance includes furnishing barbed tape instead of owner-furnished (2.10/323113.53). Site Communications 101. Existing antenna guy wire modification allowance (labor and materials) is included (A It #4/C-301). • Allstate Construction, Inc. liability and property insurance is not included for work involving, and consequential to, the antenna tower work. • Standard liability insurance is to be provided by specialty contractor contracted to perform the noted antenna guy wire modifications and the cost thereof shall be covered by within the defined allowance. Allstate Construction, Inc. page 6 of 6 ~ ~HoVf- IN,s I Of f!-l1c e. ~ I-t r;. u..- 3 Co ... I2J ~~ C-" ON v b dr-i-- - I, ..:# c:..MV 1-@ ~ ~ e Oc:- I Y 'j2....1Jj}; II )~ EM\) va .:t r;..'M$" ~ II 4·, .g Q 1r c M 't) t: OP6 N IAll 1 b I' £ M(3(t 7 INTo r;~/J'J)j-l4 fI Lt..TI h'1 Z QD Il \11:)><, '1 MH-J or€- ~ A,~n 0 N.$ S >< rEf<' /Oi7.. !7(;(- OS ./ q:;: "r,,g,~ W/ f.-IJ) OW IT l.. vJ 7~IYi'€, CC)/'JC,.i li,..7E IN Plvt"" " t/.O J~'1J~TR Vc-.,., A I 1..)1--/.1 INc,., ~o /4 Page 1 I • Embedded Channel or ~ent Plate, 13A Detention Modules -----. Caulk, 09F Painting -----\: Steel Angle, llA Detention Weld to HM Frame & Embedded Channel -. ~ "{ .Il f ..1 , IJ (t --..- (/J Hollow Metal Frame, llA Detention . . 1""4 ,. ,. Steel Angle, Plate or Bar (depending upon HM frame dept h), llA Detention Weld to HM Frame & Embedded Channel Caulk, 09F Painting HEAD & JAMB c~ I '. · SUb-Frame {Sill Buck), llA Detention ~ . SilL Allstate Construction, Inc. December 2, 2014 Page 2 rlU.~:~.U!tll?_:~. _ ../ ,./ "IL.lJ jJUL; ! ~.... >...--.~--.-. j.-. / :/ ( ~./ eeo A - Door Number Painted 25 EA B - Room Name & Number 9 EA , J "( B e-Toilet Room 3EA e <p e I - __.,J'--.r--"'Il'. '-----'--~y .".----.. . . - - , - . -.- ._. __ '!:-! _--_.- - - - ... _.... _._. _ ... _. _.... ..... . ~ , _ <= _.. __ . ~~ 1~. H· e---- -- ·- S · · _ H ___ • ___ _ .~ ~y; :. ~ E) ~ 1- -.--:- e oee o I '/ 31. · ·0 , f. ---.-.'= i-I, i = < Pro _10:_:: : . -::.:: #. I 'I cp :~ r :-,:_f:·:.:..:: :..... ::, ,, .-~<i \ H -_ • • • - ) - · ----€) 1-- . ·---0 - (0 5 -·· _...... - ----1-----+---, , ~ 'I I I /7 ! --B I " 8 ./fi' ;--- --0 !P'''T lit .a-:d&ta !M:. - ~ ----- ----_.... -.""""- ..... (_) . . . .1t:1 Pa(_l__..zo :-.: !-- til --11 --0 ,. :Jjssj;bMl., ·---- 8 r~ -·--0 ~'!...:EI::j (t SuPPORT SERVICES SCN.£: ,jr-,'-(I. 1'-((1 - IIII.LIT"'~=~ ... €'iJ .FlRST FLOOR lS!Cjuence "AO I - ........-.-...........,.... 1GB o o G (;) o ~ n 'I, C0 ! r-U.~U1.J: F! ) ~ -'-'- ;L ~Il!1 »:::::~ ~-'':::~T:~/ 8 / 0-'-- ", V i .-~::::......-::.~- 0 ··· r~.1. 8 (tOPERATIONS CENlER SCALE: 1liiie - Toilet Room 2 EA " .-;---;\_ ...._---- 'fIOEO V1 S! TAl1ON '%"'"-0- __ .___ ,::tr CCj~IDO \ .\:",._- ....... ... ... .... .. _. __ .. ... _____ . ::1: :_~..L ,' \/: ~ . u ........ _..... u... = '~:,"f .:.: t~. ~--=-== l=-====-==-=====.====-----.---...~~ .\/=1 ............. - -:1 {:I-P I. I ! I '-1 ~ ............ . -~ ., ..s l ;j ~ ;2 _ J P"'!Ili.:C '1lt:[(o 'i5:T .9ie_ lu.; "I I :C : (.{:"I':' ::E ·lb .~·~/};;;~it;::" : ---, ~~~~ I ,,I , !i I :-: :.:::.::-::.:l... .. . .. (t Ii .6 V1DEO V1SITAl1ON SCALL: 1/..-·1'-0" :1 1I',. n. :]1 ~ I ~II~ :6, I j .... uuuu u u ... uu .. uuuut.=. :~., ENLARGED PLAN I iI rs-t: :! 1'6 ~" 1I ilL i i iSequenc. "8"1 __ I ~.~u.uu·tuu ... ___ .u . ._ _ _ _ _ 1 ili A - Door Number Painted 156 EA ~ ••• u u ..$l~·r l • ~ " ~ ]:J. ... (tkEY PLAN """' !( ,_ _ ;! ~~~ 1 , =:!':.s_.1 IFLAGLER COUNTY JAIL ae.ou. RaIMrf..s ------.~talae. ~.".,....~ ....._-eao 11:1:(Il10) (_1.....''' . - -..........- ~ ~Ii!;.: .~ COMPOSITE PlAN ~ NEW HOUSINg POO SCAlE! FIRST FLOOR .3132-."-0- ...... "" A1.3 IIlSCPmfISTFtIXII '-~"' " iliA- Door Number Painted 47 EA III B - Room Name & Number 7 EA =~ _,a'lll:_ _ 2.", . . . • C-Toite1 Room 1 EA ;i [!>- _fft @ --® -~ .. UiiD =.o~ ~ ~=- ... {tkEY PLAN """' 1~lli::iJ±tJlWiL ~=---- I --.... -.,_ ....... &: .a.-et..t.elIM. -. PLAN @ COMPOSITE NEW HOUSING POD SCM.£: 3;'l2"'-"-O'" MEZZANINE LEVEL • / /~ • -------T I ( .,; i "U E .!! 41 :J .E « }; }; '" 'f" 0\ c :J 0 !in ~ :J U c :J 0 d .E '2:-" t: :J U 41 ~. I Cjj: 1l1 I ,. " ~ - . . '_.'j: 1 I• }1 LL~~~------'-="'~i i I t Page 7 if U .5 Ell <l Page 8 ... - ...._... _ ... - " -"' -"' - "'1- ' ,, : r' ,:-,- . 1 .' " """ ' .. .' ~!!m! I ~!!! ! ~il!! ~ ~H~m 8~~ B!~ t S~~l , t!~H ! a~ !!:5 !! z Page 9 CHAIN LJN1( FABRIC PER SPECtflCATlONS Z '1 . MESH ~ ~ £Yn7..g&;;> Arc GA. TOP SELVAGE 'lWISTED A H,P ...&1·i~ g e9' i3 § Ii; 0 0. END (3) snwms Of' BARBED WIRE. EA CONSISTING OF 2 STRANO UNE WIRE WI -4 PT BARBS ~~:-~ tt: i= C> _..- --12· O,C. . :z !j Ii; 0 ~.'3!N2 -, r 0. BOTTOM SaVAGE KNUCKLffi W z i! x:: ~o -' ~t'l C) :z !j ... :I: II) 0 0.. ~- <:> '" :z w :J w :z tt: 0 U 1 - - - - 10'-0· [3048W] MAX SPACING - - - - I FOOl1NGS: DIAMETER (4X) POST DlAWmR. MIN. 3'-0· (914MM)~ _ 0' "'U Dl Choin Unk Fenee Manufactures CD 10015 Old Columbia Rd, Cah:Jmaio, MD, 21046 co ->. o FENCE SECTION TYPICAl FENCE ELEVATlON I BY: TOP RAIL / TRUSSED BRACE RAIL 3 STRANDS BARBED WIRE DATE: ART 08 jSCALE: CLTA 1:40 rn ..... .' Ii CHAIN LINI< FABRIC 2 __ MESH -L CiA. PER SPECIflCAl10NS TOP RAIL H '::' o _I ~ -=:t .-I ..It. / I , I , II II I I I I L.J TENSION Io'IRE , , " II II II II I J I ~ BOTTOM 1/,1 ~J Y f>-"<> " O~J,,", I I I I I I I t I II J U 7 I_I POST DIAMETER. MIN. 3'-0· (914MM) NOTE: 1. VERTICAL AND HORIZONTAL MEMBERS MAXIMUM 8' O.C. GATE PLAN -u Dl (0 CD ....>. ....>. Chain Link Fence Manufactures Institute 10015 Old Columbia Rd. Suite B 2 15 Columbia, MD. 21046 SINGLE SWING GATE 3 STRAND.S BARBED WIRE ,_ .. (OPTIONAl) DATE: ART 08 I CLGA-1 SCALE: 1:40 .'.. . :... . : .. :.. :..... .. .. .... . .. . . . ... . ..... .. . . . ... . ..... C::;ONCAZ5TE, g 4,z. R It£ll. A~vjThT~ C~N~n(VCnON~ OI"O~·I> Page 12 .' If CHAIN UN!( FABRIC '"Z . UESH _<J_ G.&.. END PER SPECIFICATIONS TOP SElV~ 1WISTED (3) STRANDS OF BARBED WIRE. fA CONSISTING OF 2 ST'RI.ND lINE WIRE WI 4 PT BARBS DOME TOP CORNER POST t5z !!I t;; 0 n. ...a:: ~ .~~~ ~ 12- O.c. Iii 0 H9!:-~ -, r n. BOTTOM SElVAGE KNUCKlED w X ~~ :l:O ~_\ ~'-O z ::J =81 Z a: 0 (..) [[il \... TnI!O:InN WIRE IIII nil - I 1 - - - - 10'-0- [JO.48Mt.fJ MAX SPACING - - - - - I FOOllNGS: DIAMETER (4X) POST DIAMETER. MIN. 3'-0- AW'>17nc. c:.e ~vC,Tt0H", INC. (!) I ' 0.£"", l.r "'U SECTION III ~ ->. W Chain Link Fence Manufactures Institute 10015 Old Colu mbia Rd. Suite B 215 Columbia, MD. 21046 (91-4W)~ I TYPICAl FENCE ElEVA nON U I • TOP RAIL !lRUSSED eRACE RAIL .3 STRANDS BARBED WIRE DATE: ART ISCALE: CLTA 1:40 s z !!I t;; ~ ...z 0 tt'I .-i .' r; OPENIt1G F' ACE TTl F' ACE DOME: CAP rBARBOJ \lIRE Tt:RHINAL I GATE: POST CHAIN lINK fABRIC PER SPECIACATIONS 12" 300Mf'1 ' s~ ~* ~ :z. I, MESH _L GA- "'-TOP RAn. LI"I ~ II II II II II I I U ~. DROP RCDJ I I ;' " C> - 0 ! IJlRE II ROO lRUSSROO AO.IUS11NG UNIT II t. III I )'- O~""1""'9 1-;V BCTTDM TENSIDN ~\..lRUSS U I I ~ FOO11NGS: DIAMETER (4)<) POST DIAMETER. t.4IN. 3"-0· (914UM) NOM HEIGHT (H) NOTE: 1. VERTICAL AND HORIZONTAL MEMBERS MAXIMUM S' O.C. (Jc.n~ . "'U OJ co (J) -' .j:>. ~;pC! I 01 .DS.-; ,-(G.ATE ~ Chain Unk Fence Menufactures Institute 10015 Old Columbia ~cl. Suite B 215 'f.".~. ~ .~«- Columbia, MD. 21046 "}>c;., '%, JS),s- "'-' 'w ~":1 6'-0· OR 6+1=7' 7'-0· OR 7+1=8' 8'-0· PLAN ~1P'LG/\l. .~~VN DOUBLE SWING GATE b TZ'-I 3 STRANDS BARBED WIRE (OPTIONAL) ART OR 8+1=9' CLFMII CLGA-2 1:40 • - Fencing 32 LF b- RazorV'ilre 671 LF -r ....... ;- ~ .~§~ .)' ~ ., ~ ~~J. ~kEY """" ... PlAN FLAGLER COUNTY JAIL i 1lJNNF1 1. FI ORIllA i i I I ~ ae.....1atwr1~ ot.t.odl.te.bloe. ------.-,.. ......... ," ) --. ,. (~ ""==r Mr ~-:~~ ,.~ - IlUSTA~=.-cTIOIII SlIIItTAL ::. l!:'. L'" ., ....-c:; COMPOSITE PlAN ~ NEw HOUSING POO SCALE: 3/32-""-0- FIRST FLOOR I~ .. .. --- 4~ 0 l?4rzgt;v wn(E A1"2M ~--- fC>.Sr-'> ru ~ 1---'=""..oIIIIJ ........, :::-...-- F~oo (Z /0 P of FL-/+N(j F I<~ c, lA/;rvv hv"~ TA1"'1Z Cv/'"""S 1/wc,..J)u;.,J/ 0/ .. 0 0 I.!.>- / ).t("., Page 16 Expansion of the Flagler County Inmate Facility Bunnell, FL Section 5 Advertisement SECTION 5 - ADVERTISMENT January 29, 2015 FJagler/Palm Coast NEWS-TRIBUNE Published Each Wednesday and Saturday F1aglet County. Florida State of FlorIda, ~ounty of Flagler Defore the undersigned authority personally appeared Cynthh. Anderson who; on O'dth says that she LS ................................... . 1,EGAL COORDINATOR of The FlaglerlPaltn Coast NEWS ..TRffiUNE, a twice weckly newspaper, published in Flagler County, Florida; that the attached copy of advertisement, being a INVITATION TO BID NT 2105427 in the Court, was published in said newspaper in the issues ................. . NOVEMBER 15, 19, 2014 Affiant further says that The FlaglerlPalm Coast News .. Tribune is a newspaper published in said Flagler County, Florida, and that the said newspaper bas heretofore been continuously published in said Flagler County, Florida, each Wednesday and Saturday and bas been entered as sccondclass mail matter at the post offiec in Flagler Beach, in said Flagler County, Florida, for a period of one year next preceding the first pUblication of the attached copy of advertisement; and affiant further says thaI he has neither paid nor promised any perSOIl, film or corporation any discount, rebate, commission or refund fol' tbe purpose of securing this advertisement for publication in the said newspaper , . ····41.:/.jjt.(!:~ .. aittlt)t.UI)J ...... Swom to and subscribed before me lbis 19TH of NOVEMBER ",1) Allstate Construction, Inc. page 1 of 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Attachment 2 Schedule of Values ATTACHMENT 2 -SCHEDULE OF VALUES January 29, 2015 Description General Requirements Total $677,127 Construction Fee $600,000 Bonds & Insurance $189,677 Contingency $310,632 Selective Demolition $134,799 Concrete $926,247 Hollow Core Concrete $353,110 Precast Structural Concrete $1,945,825 Masonry $1,366,486 Steel $517,680 General Trades $246,035 Cabinets $27,300 Thermal & Moisture Protection $36,204 Roofing Doors, Frames, & Hardware Overhead Coiling Doors Gypsum Board $899,722 $7,788 $14,380 $132,029 Tile $41,856 Acoustical Ceilings $18,351 Resinous Flooring $71,986 Carpeting $27,222 Painting Specialties Detention Equipment Laundry Equipment $239,663 $8,271 $1,748,410 $57,674 Food Service Equipment $365,750 Fire Protection $306,300 Plumbing $870,568 HVAC Testing, Adjusting, & Balancing $1,475,710 $6,740 Electrical $1,264,532 Site $1,212,305 Fencing Landscaping Total Allstate Construction, Inc. $327,473 $14,430 $16,442,282 page 1 of 1 Expansion of the Flagler County Inmate Facility Bunnell, FL Attachment 3 Construction Schedule ATTACHMENT 3 - CONSTUCTION SCHEDULE January 29, 2015 Construction duration from receipt of Notice to Proceed and required permits to Substantial Completion: 436 Calendar Days, plus 40 Calendar Days for punch list and project closeout. See attached construction schedule. Allstate Construction, Inc. page 1 of 1 PC 140 Bid Solicitation 1__ .. - 1_.. __ . " _ ,- .I J 15d . ---,,~ -- II I I I I 11 070 EC14A J _I .JJ111!1.1LLL'_ I_ ' _ ' _ IJJ11111._ :...:..iiiIiiiiiiij _ I J J l l! II II " I ""'" I I I , I I I I I I I I I 1 , I I I I I I I I 1 ; _ .1 I ! , I I 1 , 1 1 ~ I I I I I I I I I I 1 I I I I I 1111" 1111111111111111 .--1._"_,,.. . 1_____ .. . 100 07NOV14A I' , M~'"'f1""""OO"""~" ' If.-:. _ II . ,' " " " " I v ,o va, PC190 -- GMPApprO\El! -. ~ -- I 01 5d - '""I 0 27JAN 15 - I II II I r II II II r I1III II 1111111111 l i l t I t 11I111 I" ." ''''''r r ,;rrr,-,-,-".,,.,. "'"'''' "V ~~"~ ,-,.,., 'l''' T - 02FEB1 5 T TI IT rI Ir ,r Ir ,, ,, J J II r I " r 1 t I II I J II Il , stabilization of Pond Slopes New EJectricai SeN"ce 5d 10d 020MAR15 0 27MAR15 26MAR15 09APR15 II II II I I 1 f II II I r II II II 1 I 1 1 I I II II I I II I I II II II II I I I I I , I I I I I I , I I I I I I I I I I t I I I I I I t I . I I I , I II J I I I I I Tf II I I I I II I I I I II I I I I I) I I II I! I I II , I I I I , r r : l- - - I::::::~:: I=' ~' - - '__ I -- 1 ::1 VI ,- " "'" 1--" "'" -------- ]~~~::~: ---- ---- I::~~~~: II II II II III! II I r I 11 t I I I I I II t ! J I I 1 I 1 I I J ! I I II II I I 1/ I I I 1 II 1 I II " I I I I ! I I I II I I II 1 , I I I I I I II t i l l I I I I I I I I II II I I I I I ! , I I I II ! I I f I I I I I I I I I I II I I I , I I , I I f II I I I , II , I 1'11'1 II II I J J I J I /I II I I I I I I I ~ I I I I I I I I II I I I! I I I ! I I " 1 I I I I I I I I I 11111111111 I I I I I I I 1 I I " I I I I I I I I I I I I I I I 1 I I I J 11 I I I I I I I I I I II " I- I- I- j - , 1 II I 1 t I 1 1 I I I ( I I I I II I I II I 1 I "'T"'T T T r I I I 1 11 II I I II I I I! ~ I I I I I " II II I I I I II I I I I " r r rrn-n," II II II II j I I I I I i I I t ! I , • ) I I I I I I I I I I r II I I I II ! I Jill rr I I I I I! II I I I I I I I I ! I I I 1 I I I I I I I I I I I II I I ! ! " I I I ! II II ! I " " II 1 I II rn-I-,- n-n.., i " T T r n - , I I I 1 , 1 I 11 I I I I I I I 1 " II " I I I 1 I 1 I I I I I I I I I I I I I I I I I I I ) I ) I I I I I I I II I I _u'1 ~;TI &,S ~i- ~;-:-:-;-i I=Ot,S~'~ IPo~bIo&F~) 1 " I I I I I I I I I I I I 1 I I I I I I I I I I I! I I II l I I I I I " 11111 rr I I I I 11 II II I I I I I I II I II I II I I I I 1 I I II I 11111111 I I I I I I II J II I J II II II II 1 I J I I I II II! I II I J II II I I II II II II :. +trHS++ : : : : : : : : : ; : : : : : : : : ; : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : I • ~ I I I 1 II t I I I I I I I _._.jJii.t~:rjl> li~.tti l L~~U_:JJJ Jllll LLL~~:_:_U _U Jlllll ~ LLL:_:_:JJJ J llll ~ ~ ~ ~~ !>t.bokzahonDlPonCISlopMll II I J II J' ! :::: I I I I I ! II I I II II J I , I I I I I I I I 1 I I II I I I I I I I I " I I I t t I I I I I I 1 11 I I I I I I I I I I I I I I II I I . I I I ! ! II l I I I I I I I " I III! I I I I ; II!I ! ! II I I I I " I I I : 11 I I ! I II II II II I: II 1"111 I1II II I: II II II 1 I II II I ! J I ! I II : ! II ! , I I " I I I I I! II I ! II! ! II!) II II I I I I " II I I I I I : " " II I I I I II I I II II I I I I I I II II 1 I II I I " I I II " J I 1 ) I I I I I I I t I ! I I !I I I J J I I J I I 1 J I I I I I ! I I I I ! I I I I " " 1IIIIIIIllIlIIIIIIIIIIIIII111I11IJIlIIIIIIIIIIIIIII II I I II II I1II I I I I I I I I II II I I I I j T T I I I I I t i l I I I I I 1 11 1 I I I j I I I I I I I I I I I I I I I 1 I I I I I I I I I I 1 I " 1 I I I I I II I I I I II I I II 1 I I I I I " I I I I l ! I I I ! I I I I 1 I ! I II I I I I J I I I I I I I II I ! I I I I I I I I I I I I I I II I I I I I I II " I I f I II I I I I I) I I 1 I II I i If I I I 1 I I I I II I I ) I II II II II I I I I I I I I II I I It p ~~~l~1!~~~~~~:_:~J~J~~11~L~L~U_:-!J~~1~1'llL~L-:"':J~f!I.~ ~~d -111I111111!\11 1IIIIIIIIIIIIIIIIIilllillilii I I I I I I " I I I ! II , I II I I I I II I I I I I ! I I I ! I I ! f II ! I I I 1111111111 1 1 1 1 " " 1 1 1 1 " I i I I I I I I 1 I I I I ! [I I I I I I I e I I I 1 1 ' 1 ' 1 I I II11 I I ! I I I I I I I I : I I I ! I I I I 111111111111111111111111'11111111111111111 " II II II II I I II I I I I I I I I I I I I I I 1 I I It! II ! I II II " I I I I I ~ I I 1 I f I I t I I I I I I I I II I I J I , I I I I I I I II 1 I I I 1~-1~~~~~-;~;-~~~~:-:~~~~~~~t~~~~~~:-:-:-:~~~~t I t~~~~ 1111 I I II II II II I ' l l t! I I ' II II II I J II II J I 1111111:1 11'11111111111111111111111111111 11111111111111111111111111111111 f i l l ! l l l ! ) I I I I : : : ; 111111 I IItlllll !!1I111111 111111 I 11111111 1111111111 111111 I 11111111 1111111111 II II II I I I I I I I 11 11. 1 1 I I I I I I 1111 111111 I )11111,1 1111111111 1II1 111111 I 11111111 1111111111 11 11 IIII 111111 ) Illlllll 1111111111 11" 11 1111111111111111111111111111111111111111111 l-s-,)...I-l-I -I-4 ~ oJ. "" -+ oS. 4-.a-1- ~~I-t-I-I-I~ -14 4 ~ + ~.t- ~ ~$->-!_I~-I-: -I "" -l + J-l- '-I-I-~ I i I I I I I I I i II I I I I I I " II I I I ) II I I I ) II 1 I II I I II 1 I I I I I " II " " I I II 11 II II ~~! ;r~!./c..~ : " . : : II II 11 I t 11 11 : : : : II : : : : : : : : : : : : !: :: :: :: :: :: :: : : ~.sbbafto<.,;" III! l " : : :: :: :: : : : : :: : : :: :: :: : : :: :: :: :: : ; :: :: : : :: :: :: 1 I : : 11 I I 1 1 11 I I I I I I I ! 111111111111111111111111111111 [ I I .... ~~~ I'¥' ~ ~ ....... ~ .......~ ""~..... I 1 I I I I I I I I I I I: II I ! I I I I I I 1 ! " I) I ! I I I I ! I II I I I " I 1 I I I I I 1 I I I I I I ! I I I I I I I I I 1 I I I J I I I I I I I I I I I I II " II II 11 I f I I I I I I I I I I I I I I I I I I I I 11 I I " I I I I J I I I 1 I , I I I I I 1 I I I I I II II I I , I I I I I 1 I I I I I I I I I I I I I I J I ) I I I I I I " I i II I I I I I I " " I I I I I) I I I I II I i I I I I I I I I I I I I " 1I1I1I11111111111111111!111111'1!1I!111 I I I I I I 11 I I I I l i l t I I I I I I I I I ! 11"11 I I I I I I I I I I II I I I I " , I II II !I)IIIIIIIIIIII II II II I I J J I I II J I I I I I I I I I I I I I I r I J 1 I I I I I I I I I I I I I I I I I ! I I I I I 1 I J II II II 1 I J ! I I I I I I I I II I I I II I I I : " J 1111111111111111 11111111111111111 I ' l l II II II II II II II II II II II II II II r I II I I , " I I 1 f I: I 1 I I I: I : : : : : : : : : : : : ; : : : : : : : : : : : : ; : ; : : ; II J I I I I I I t II II I I p'ee,!liD,!DI,C~C~Pf'"'On~nt I I I I 1-'-'=:::..-+=======--------1f_~f_--'-r:-:-::'-'--1f:-'--:--:=-j I I II I I II I I I I II II HS1040 StormDrainagePiping&S1ructures 10d 0 13MAR1S 26MAR15 ) _I..J.J.L..l.1.!.!.l.LLI_ '_ I_ IJ..JJJ-1..!.l.ll.1.LLLU_ I..J _I .JJ.1 ...l1 HS10SO HS1060 I I 1 I I i I I J I I I t I II I I I I II I I I t J r I I ! I : I II II II II II II I I II " I I I I I I II II II II I1I1 " II I I I I I I II I I I I 1 I I I I I II " I I I I I I I I ! 1 1/ ! I I I ! I I I I II II:: I ' l l II II 1'11'1 I I I I I I I I II II II !I II ! I I I II I 1 I I J I I I I I I I II II II I I 1111111111111111111111 I I I I I I I I I I I I I I 11 I I I I I I I t i l I I I II I I I ! II II I I I I I I .......... " .."' ................ ,"".. II I 1 J I II I 1 II II I I I I , I I I " II I! I I I I r -rrrrr~~~~111TTrrrrr~~n~1l11TTrrrrrr~~~~111TTrrrr~r~n~~111TTrTrrr II I I I I I I II I J I I II " , I I I I I 1/ J I I I I I " I I I 1 II I I I I II II t ! " II I I II I I II II II " ;t I r I I I I I I I I I I I I I I I I I I I I I I I I I I I • r I I I I I I I I I I I I I ! I I I 1 I I I I , I I I I 111111 111111 111111111l1l fllllll:1I III 1111111111111 I I II I I II I I II II i I I I I I I I I I I I II II II II II II II II II I I II II 1 I I I I I I I II I I I I I , I I I I I I I I I : II " I I 1 I II I) )I II! I " I I I I I I I I I I I I I I II I I II I I I ! II I I I I " I I I I I I II I I l' 'MPA;~ '-rl-I"i' "'T"'T T " ., " " II II II " II I I I I • I I I ! I I I I I I I I I II II r~'~ II I I I: II II II II! ! II II I I II I I II I I I I I I I I I I I I 1 I I I I ! I I I I " I I I I II II: I II! I II 'I II 11 I I I f I I I I II II J ! I I I I I : I I I I I I I It: I I II I I I I I ! I I I I II IIIIII111 11111!111111 111111 11111111111111111111:1111111 II I I I I I J I I I I I I I I I I I 11 I I I I I I I I I I I I I I I I I I " I J I I II II I I I I II ! I I I I I I I I I I I ,, . ,, ~ I t f If I I 11 II ! III I I I J I I I I I I I I ) I II " I I ttl I II I I II ._._- -- --,,---,,- II l ' 111111 I I I I : : : : 1111 1111 1111 II II lf!llltlltlftllllllllllll!1111JI!111111111II :: :: :: :: :: :: :: :: :: :: ;: :: :: :: :: II : : : : : : : : : : : : : : : : t : I I : I I I I I I I 11 I I I I I I 11 I I I I I I I I ; I I I I I I I J I II I 1 I I I I I ; P~"m~Trr ft !n!~nI!rC~U IWD11f; I ! I I I ! I I I I I I I I I I , I I I t I I I I I I ! I J I I I I I I I I I t I I I .__ ~Mr~rt~jJJ J11111 i L~L~:_:J~JJl~lll~~ LL~:_:JJjJ'! 11 i ilL L~ Ill l ~ ~ llIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111 J ~~ rf ,~ IIIIIIIIIIIIIIIIIIIII!IJIIIJIIIIIIIII11111 111 "' I '~ " "IIIIIIII:llfllllllllllll::1111111111111111 I I ( , I II I I 1 I I I I I I I II II II I I I I I I I 1 I 1 __ Earlybar Aagler County Aorida Expansion of the Inmate Facility Master Project Schedule January 29,2015 ._ Progress bar _ Critical bar - Surrrn:lrybar <> <> Finish rrileslone point Start rrileslone point 1..:..:.-':="::'-tC=":::.''':.':::.'':::~:::U~::':'':'''':O'C:'~:=':,,:~::,'O>='.::Q''::~:::'=::':::'''''-_---1,.:=:=:t----"iI-'="="-:----1...:.:::.:::..:=-I-I-"..,..,.,. Electrical Gear & Panels r I 11 T T!'"' r 111 I I r r r I I I ...j-l.o1~1 -o=. nv/"\ ..... I;;\.jIJ').II ' O:;;IIL EmergencyGenerator I I I I r- I I I I I ""'-1-1-1"'"1""",,,,,, .,. T r r r I' I I I ~:I ~I:~~:~~ I::::'AOC ';;l~ll0 t"1)Q:ures I I I t II II I r .. ++~~~~:-I-I-I-I-I I I J I! I r 11 11,1 11 I : I I ! r r- r-r-I-I-I-I~'" I r [11 r r r t t r I! II II t I , I I I I I II II I I II II I I I I II ,, r II II I I t f tiL L II J_t..l.J.J..1 J..l.!.. 1. L II I I I II I I II r I r II t I I r t I I I I! I I I: II t I , I "'1 II I I II t I I L I I I L 1.1_1_'_l-'-'..J.J.1 t II I 1 '. . . . . 1 _~~ V! VVI .. VV ' " ... 1 ....... , ....., ,.,. 1';;;>'"'''''''''' .....,.., ....., Mr I t I I r I I I I I I I I I I I II ! II ..::u! u!u..::r\lUVI;l !V.;lI'lVV';;l .1 _I_n'_"u I_ .. . _,,~... 1-'-l..J . I I I I II II II II II II I I 1'1 1'1 t I t I I L ttl t II II I I I! 11 , I t I I 111 11 I I t I I I I I I I I I It' I I II 1 ' 1 111 111 I It I It, I I til I 11 If II If 11 II 1(11 11 I (II II I j I I I , I I I II t I I I t ( I I 11 I ( II I I II II I I I I I I I I I I I"l I 11 Jill I I I I I I I'll : (II I I I! I, II I I I I (: I I II I' r I I: t I I I I I I I! I I rl lJl l lY I II I I I J I f I I I 1\ f II II I I l i t 11 11 , I I , I I I I I I I ~ I I I!! I I I I I I I I I I 'I'I'L I I I I II II II I I I II! I J J: II II II II ~ I I I I I II I I J I 11 'I 1 I I II , I I I II I I II I I II II I II II II II II' II I' II II 1 I LLI_I_I_'_' I I I I , I I I!" II I I I I 11 I I I I I II .J1 I 1 I H -:~ ~ ~ ~ +l I t I! t I I! I I I I r I J..!..!...!..'.. I J 1 I I I I I I I I: J I I ,I I II I I I t 11" l f I II II II II II II "I I I II I: II! I II I i II I I II II (I II '" , , _,_,_, J ..! I I I I I II I I I I II II II II I I l i l t I , I I J I tit I I II It I I I f I I 1" I f I II II 11 I t II II! I (I t! (( II II I I i I I (II II II (1 II 11 II II II II , t I II II II "I I I I I I 1 I I I I , : : I I I I I (II I ( : I t II II II I J , I I I I J II , I II II I II t I 11 '1 ( I t I I I 1 I J' I ~ III I 1 I I II I I I I : t I II I I I I [[ I II ,, t! I I t I j t I I I ( I I I I I I I I t I t I" I I II II I II II I II J II I! I II I ,,'l II 11" I I (t!, [I II : I t 1 Itt I J I t I II LL II II I I' I I I 1111 t I II t I' J II t I I I '1 I I I I "I t ' ! 1 111 /1' I II I I I I I I II L I J I I I -'I i II II t:" II 1 'I II I I II I 11 I I (111 II I! II I! 1 I I I I I 11 II It 'I II II :: II I I I tIll 11 11 II I I I I II "ll Ll_ I_ ' _ I _ I _I_I.j..!. t I l l II I I' I II I I 11 I I I I I j 11 t I I! I j 1111' I f I 11 II i i Tr 11 I I t i l l I! I I I I; 11 II II I J II 1 \ II tIll I I I 111 ; I J l. I 1 I I 1 1 ' 111 -I j' I: :: II II r ,- t'- '-'-f-'-'C 1 1 1 1 1 I I : 11 I I 11 I I I ' II II I I (I t I I 1 II II II I I II 11 II 11 ( j I CI_'_;_IJ_tJJ..'...!..1. I (( 1 II t! I II II II II II I'" 11'1 " I! I 11 ~ r++'l::~P ~d~'~U~d ~O~h !n : : : : I I : : ,! I J I ' l l ! I I! t _,..)...! J..!..'.. l. 1. L L I_ 1 I 1 I 1 1 1 , [11 I I II II I I I:' _1_IJ..J1J.l.LLl..L III I] II I I , I j,! I ' l l It II I fill I'I'!! :! II! r 11 " II II II II J J II I J II II II I ' l l II II t I I I t I II II 1 I I ! I I I I I 11 I I I I II 11 +).. j.. II II II II II r f r r:-:-:-;-:-; ~ ~ ~ ~ + 1 I I I I I II II I I I'll II II 11 II ..'..11. '- LI_'_I _ ' _ I _ I_''''!..!..!...!. r I I I '1" II II II J I I J J II , I I " II II ! ! II II II 4-J..J -l""4 4. I: " 1 : ' I I I 11 I I I I I II t I I 11" , I II II 1 I I II II ~ ~ ~ ~ ~~~:_:_:_:~ ~ l ~ ~ I ~ ~ ~ L._._ II II J I I J II J 11 1 I I I I II I: , "I I I II I t I II II II II I J II II II I I' II , I I' ~ ~ ~:-:-:-:-:-:~ -: ~ ~ ++ I II 1111 I I I II 1=:~'1°1: 1 I ' [ n~tn"'PlumbjngFOmo,ul 1 1 I I I I I I I 1 I j I I I I I J I I I I I I I I I • ___ . '-I_' _ I _ I.J J.1.1 J. J. L:..I.- LL'-' _ I_' _ I.J..J J.1 J. J. !.1.t..L. r-t*""ft'ACSlllrt.JJp I I I I 1 f ( I I ( ! I I I I I I I I I I 1 1'1 I II , I I II I I t I = J I • I I _ I II I IIl , tIt Itt I (I ttl II t ( 1 J J J J I II II II t t 11 I I 1111 ( I I I II I I II II I I I I II II '1111111111111111111111111 II J I I I 1111 J I l l 11 II II __+~;::::":::""+~::::.!-=---I~I_'..)..) 1..! 1.!1..!.. L,-I_ '_I _I_:_ ~I :~:~~: r 1 1 ' 1 I L 11 I I I I I I /1 :: t I I' II It! I I I I II I I JIll I J I! II II 1 I I I I I I J J I I I II II I , :1 I t I l / /' I II II I I , I I~~~~~~ 1~.tnal ~Dat .....alm I II I 11 I t: t L I I II I I t i l 11 t ( II II II I I II II 1..!:!:::::'-""--I-El<~eo:r;:::!or..::C::o~at:", ing~S'-_ _ _ _ _ _ _+~+- I II t I II I ' l l II 11 11 1 I I ( I _:_:~ ~ ~ ~ ~ l ~ ~ ~ ~:_ :_:_;~~~ ~ ~ J !! I ttl I II " I' I Me ..... VlJaIl Kougn In r- I UI~UUII I II I I' I I "II I II II I I rile I II II II I: ~ ~ ~ ~ ~ ~ ~ ~ ~:_:_:_:_:_:~~ ~ ~ ~ ~ ~ ~ ~ ~:_~:_:~~~ ~ ~ ~ l' ~ ~ ~ ~:- :-: II I' Precast HollowCore Concrete Slab II It I I It-'rep;::'laDun~raue r I II 1111 I t I; ! I II MM.)U<I.U , j I I II I I I I I II II I I 1 ' 1 ' 1 ' 1 t I t 11 11 II I IJ_I_IJ1.!!.LI_LLt_LI_I_'_l_IJJ..!..!.!...L1LLLI_I_I_I_I_1 I 1 I! II I I I I I t I) I t II I 1'1 II! I I I L! II I I 11 It J J. J. L l..l..l.t_t_t_,...t"':J.J.!..t.L I 1" II II I r II II II II i I I I I II I I II t I II II I t I! 11'1 (I I I' ! 'VI Cr- V V-dIlIIIlIlVUI r It· I I 11 II I ~ I r r Itt " I~;~ ~ ~ ~ ~ ~ ~ ~ ~ ~~:-:-:-:-:~ ~ ~ ~ ~ ~ ~ ~ ~ ~:-:-:-:~~~ ~~~~ I I' I, 1~~~.c..>"tV II I r II II II '1 "'''' T I f +~~~~~:-I-I-I .... -C-l~~~40 r t I I I 1 1'1 ............. I I I I I I I "It Install .....IUTTlDlng I I r 1'1 I I 1: II I~~~~~ I~~flor~o~ng5_ _ II r r r II II ,, II t' I 1111 ( 'I II 1 t " II II II. I I II II I I II II II 1111 II " 1111 I I J I II II Iiiiiii Earlybar Ragler County Rorida Expansion ofthe Inmate Facility Master Project Schedule January 29,2015 Iiiiiii Prcg ress bar IiiiiiI Critical bar _Surrmarybar <> Start rrilestone point o Finish rrilestone point II I I I I II I I I 1111 II 't '" "1I ""'''' - ~ ., T "'" - I I I I I II I II r::::==--+r::'~'n~~~",~,~,c;,,",o:o::"':..:r..:.:::'m~_ ____---1'---? 11'1 I I 1'1 I t 'I I t It t I II II I I II II I ' l l II II II! I II II I I I I I II II I II II I I I I I "T" T I I I I I 1\ I I •• I , I II I I II II I t I I II '" II t I I I I I I I I II I I I I II II I II I I I I I I I I I I II I II II I I II It I I I I II I I I I I J t I til tIt I: I II I I t I I I I ugmlng 0. MVAt,.; l,;elllng ue\Aces I I I I I I I I I I It' 11'1 I I : I I II II 1\ I! I : I I I I I I I I I I I I : r I I II II II I I I I I I I I I II I I I I I I I I II ~ I I I I I I I I I 11'1 I ! I t II I II I II II I I r Itt I I I I 11 II II I I 'I I I II I'll I I I I I I I I I I I ! I I I I , I I I I I I II I ) I I I I I I "ll I I I : I I II II II II I : I I r I I I t I I I: I I I I I I I I • I I I I ,, ,, ,, ,, ,, , ,, ,, ,, II II ,, I II II II t ttl II ~ I , I I I I I , If II II II I I I l I I I I II II II II r I I I I I I I II : 1'1 I I II II II It II I I T ,.. I- I- ... t-l- I - I-I - I -1 ,, I. I I II I I ,, I I I I II II I I! I I: II II II II II II II II ,, I I 11" I I II II II I II II I I II I ~ -t II II I I I I I I I II II II I I II ~t-"U4U I~erro. c~eanng & Gru~ng 7dl ~I ~~~.~: I I I , ! t Gas Piping . . . Storm Dramage Plptng & Structures I II II I I I II I " I I \ I t I I r I II I I I -' - '1'11 I I I I I II II 11I1 II I 1'" II II I Fl' I I I I r 1 II I I I I I I I I I I I I II II I ,, ,, II II I I: I II I II II I I I t I I I t II I I ~~~~~~ I~~~~ I I I t I II II I II I < I t I TTr I II II 1 I II II I I : : I II 11'1 I I II II I I II II II I! , I I I I II I! II! I I I I , I I I , I I II I t I t I I I ,, I II t, I II! I I II II , , t,. II I I I I I I I 'I II I II II I I I I , I I II II ,, II I II , ! : : : I , " /' , II I I , ~ : I I I I : J I II I: II II II II I I I I I I II II 11 I II II II I I : II I: : I It II I I 1 I II ! I ! I I II II II 'II I II II II II 1 1" II t I II I I ,, It II l' II I I I It II II I II II II , I II II I: II II II J I II II I t II I t II II " II II II II II I II I I I t II II I " II I J I I I I I II II II I II II I I II II I I I 'I II II I I I'll II II 1'1 I II II II I I'll 11 111 I I II I I II r I "ll II II II II II I! t t I I Ragler County Rorida Expansion ofthe Inmate Facility Master Project Schedule January 29, 2015 II I I' I I II If I' t I I: II I I II II II II I I ,rr t I I II II II I r (I II II II II II II II II II II I! II II I II II t II t I f 11 II II I II II I 11 II II II II I I I I I I I I II I t I I II I 1'1 1 I I II " r r ,- I rl- '- '- ' II! I II I (I I II II II I II I II II I 'I II II I I I ,, ,, I II ,, It 11 II II II II II I I , , ,. I I I II J I I II I I I I I I I II II I , , 11'1 I I I I' I I I I I I I r ,, ,, I II II ,, " I II ,, II II I J " II II II II- ,- ,- n - , - , -,11 T T II II I " l II " I I: I II II II I I I II ,, 1:1::::::::: I:::::: I I I "1 1111 II II II ,, I 'I II I I I I I 1" I II II II II II I 11 II I I II I II I r~~~:- :-: -I -I' '' ~~ ~ !T r II \: I J I rt l II I I Il II II It II II ! I I I J! II II "'11 rl r r r I II , , I I I 1\' t I II 'I I! II ,, II I. II i 'i -; T I I , , 1', ,, ,, II 'I II II I J J I II I I I' I 1 1 '1 II ,, II I:; I II II ,- ,- ,- n - I - I - , - , I I I I I I ! I ,, I I I II II I II II r I II r I , I 11" II I ~~~:-~: -:-:~~,~~~~~~~~:-:-: -:~~~.,-r~ ~ "TT - 'I II II II II I II II t I II ,, I II! I I Itt I , I I I II II II 11 II 11 II I I II I t ' I II r ~ I ~~=-I~ II I I f I I I r r,- ,- ,- I-'-r-Il '\ 1 I I' ~I I 'I I 7' '; r" I 11" l~lal:."4CU~U""~'''''C I I II 11'1 II II I~~~~~: 1-:-:~ ~ ~ -i +i - !. ~ ~;- :- ;- :-: -; ~ -: ~ ~ +7 ~ l- :- :-:-:-:-:-: -: -: -:~ ~ + I I I ·~r"-.u I I : : I II I T T ,.. r r- I"""I-r- I - I I I I t II II t I I 11'1 I I I I I I II II I I I 1\ I t II I I II I 1/ I I I I I I II II II "i ... .,. to .. ,.. .... 1II II II I I II 1'1 I I I I I ,, Fir II , f I II II II II II I I I II " I ,, ,, I I I I II , I f t I I " ,, ,, 1 I I -r -: I ( ,, " I : 1 I I r I II I I I I r II I I II II I I I t I II I: I I ! I II II II I I I 1 : II I: II:, I I II I I II I' _: _:~ ~ ~ ~ ~ ~ ~ ~ ~ ~:_~: _:~ ~~ ~ ~ ~ ~ .:. ~ ~ ~ ~:_ ~:_:~~ ~ ~ ~ ~ ~ Detention & Electrical Oel.4ces & Equip( I I' I I 1'1 t II II r-~r- t - r ...,-t"'1'" I 'll 'f' " •• r I I I ' l l II II II II .,. 1"'''' r- r I It I , I t, r I r r - r - I - I """"-: ",'" - ~ I I I , I I •• I I I I ~ I II I I I I II: II II II: I I I r,... r I I II I I t til II __--:iE::::::=---1~=:~-I ~~";~ ~ ~ ~ ~ ~ ~ ~~:_:_ : _ :-: _:~~ ~ ~ ~! ~ ~ ~~:_ ~:_:-!-!~~~ ~! I ~ ~~ rl- Cei ling Grid V1S114Q I I I , I II', - '- '-1- ''''''''''''' ""\ rI I I II I r II I I r" I I f II II I I tit t II II II I"l I I I Electrical In VVaIJ Roug~ln 'I II If II t I I I , '<llIe; nncllu, ......<lU:)CII.\,..oI;:IIIIY:) I II II II I I II ,, t I I I t I I I I I ,, II II t I II I II t II r II II I II II II I II I I I I I "1 _ Ear/ybar - Prog ress bar - Critical bar - Sunmarybar ¢ Start mlestone point <> Finish rrilestone point I:='~: I I' t 1"'"1 ~~I.n~luvvw_~I~\'ul~r~L~ ;:)I dU ~ul ~11~f\~~ I~ IIO~Ul3_ L~ I~: II , " II I II 1" II " I II II II 't r II II t I ' l l I I I I /1 I I I I I I II t I I II I I I II lIt' l ~ II I I II 11 I I I r r II I 'I 'I I r I t I I II II II II II II T CI!. refllt:'!:> II , I ) I J t I I I ' II G~Bd I t I I I ., I I I I I I I I I It I' I I I I" I I I I II I I I I , I' I I 11 I I I I II r I II l' I ~£I~ :xlI I rllt:r-rU(~uullnt:~ U I I~IIO I ~IIO I_: _:~ ~ ~ ~ I I 11 " , Itt I ,, II I I ~I'>uv"";) 1 1£1~~.v.~~ vldUlH'dUUlIu.rUllUvl~ Rac~ & Foundations 11 II " I I I II II II II I! II I! II I I I I" 'I I II II II I I I I II II I I II II II II ~ I r I' II II II II II I I I I I I J II I t 11 11 ,, II II I· II II I I II II ' 1 I I II I I I 11'1 II II I:" II I I I I I I I I II ! I I J II -, _ IJ _1 1 . ! ! I I J L t.. L'_'_I _ I I I I II II I I II I I I !~ I I ,, , I II " . I I II r I II r '_'_IJ.J.J. II 1'1 I 11 I., I J I j") I J i ,- J r II I I I I I 1 1- ' - 1- 1- ' - '1 - ' ; : I j r i II : : I I I I" II II II I II " _'.1 J.1. L'_I_I _ I_'_I II II II I II t I l l t II I I II: I II I t 1 I II II II II! I , " ; f I I I II I I J I I I II I J: I I I 11 I I I I II I I I J I I II t I I I Ii I , I I , I : J..J..J.J.J.1.l J. 11'1 I II I I I I L L L I ' I I I LLI_'_I_I_IJ 1 1 II II J I I I I J 1: I J II II I I I II ," , I ! II II . I I I : I 1'1 I II II : : : : : II '-1 _ 1_' _ '_' _ '_' II) I II I) I I I I II J J...!.!. I 111 I I 1111 I I II II II r I II II , I I II lit: : : I' : ; : : I I II I! , I I t 'I , , L L L l..1_'_I_IJ.JJ J . 1 . l l I II II 11'1 j I It I I II II II I· I II 11 I II II I I I' II I I II t I 11 I II I J II II I' II t i II ll II LI_ I_ ' _ ' _ ' _ ' ..1 _I .! .! J.! L L L L '_ L' _ 1 I 11 I I t ( I I I t I I I I t I I I t 11 I 111 I I I I I I I I 11 I I _ -I l l !.. !.. ,_ !.,. '_ :_ I _ I _ I _ I,J _, J 1 .!. .!. 11 11111 II I II 11 , II II I I , l l l l tl ~I TI T'" lf I I I I J I II II II I I I I I I I I 11 II I II II " II (I II ! I II (I I I I I I'· I I II II! I 'I 1. !..!.. It II !.. I_ '_ I_ f I II II [I I I I til I I I I I I II II It r 1 II' J LLL II II II 'I I I I r I , , I I'll lilt I I I II II I I I I II I I II II II II 1 I I I II I I I I J I I ! ! J I II J 11 I II II I I I I II II I I It I I I I I I I I I I II II ) I II I) II t t II II L L LI _ I _ I.JJ ..J .1 I I I I { { I I ! J I I 1 I 11 I I I t ! I t,! I II II II II II I I 'I II II II I I I II II I I I I) I II I I I I II t, II J I I I I II I' II II II II I 'll 1. L- 1-1_ 1_ 1_ 1_ I _ t.J.J .t I I II II II I I II II I I I' II II I , I t f I II I I L'_ '_ I_U_IJ J.l j 1. 11.. L L L,'_'_'_' _ ' _ I,l..1.! II I I II I I l i t ' L I II II I I I I II II I I I I ! I I I II /1 J j I I I I II II I'll I I I ' l l II II II II I I'll I' 1 I I I I I I I 11 I I f I I I 1 f t ' 11 II II 11 II II II I I II II II II L.1_1_ 1_ 1_ 1_ IJ J..1.J. J. J. L L L. I I J. I I I Itt' I J, I I r II II II II I J I til I I ,, ,, I I II I I : 11'1 II r 't 11 I ~ 1 I I , I J t! II II 1ft I I t 11 II II II II II II L l.. LI_I_'_I_I_I J .J.J .I II! I t I I ' ll I t I I I I I I I I I 1 I 11 I I II I , I I I I 11 I I II II! I I I I I I I II II II) II II II II II II II I I' J t I {I II II I I 'I : Iiiiii Early bar Ragler County Rorida Expansion ofthe Inmate Facility Master Project Schedule January 29,2015 t 11' 1'1 I I 11 II 1'" II I I I I! 'I I I I I 1 I I ' , I I I 11 I I I I II I! I I t ' I t II II II ! I II II L 1. L l..1_1_1_1_'_IJ.J.l-1.J..J. L L l..1_ C LI_I_I_I .J -'..1.1.1..1. L I II II I f I I {I I I II II I I ) I" II' I "1' J I I I 1 I I I I I I I I I I I I I ~ I I : I I I I I I I 1 I II I I II I I II " II I I! I I II II I I I) , ,, I , I II II I t I I! ttl • I [ II II I I I J J I r I II I' tIl' , J..1.J.l.l I I I I I I II I II II I , I I I II I t II II II! I " I' II I I II II L 1.. t.. I : til I I I I I I I I I I II I I I I I I I I I I J I II II tIl I II II I I II II II II II 1...1_ '_' _ I-I-'J..J..l.J.!..L.L.1.1... I II II I! I II I I II II I t I l ' I II! I I I II II II ! I II I I t I I I II II II 11'1 t I II I! II ! I II I I II II II II II II II r I II I I II II I r II I ( t I I I: I I I II II II II II • I I I I t II II I! I J II II II II I I II II II II II II II I ' l l ~ !- 1-1_ 1_ 1_ 1_ 1-I-I-I..J..J.,J..J. 1.. ~ L.. L.LI-I _ '-I...l -l-l ..t -' .... J.. 1.. t I! I ) I: I II) I I I I I 11- '-1-1-' -1" j (' II ttl: II I : J l ! L1. L 'I II II I: It I " ; I I 11'1 t I II II I I t I t I I I I " I I I I II r i ll 1111 I t t I I 111111' r It 111 1 I { I I [ I ,t I I II II II II II II II , II I I II 1 1 ' 1 II 1111 II II I I II I II I , "'l , I I i E II {I " ' I I II II 1 I ' l l I " l II II 11', I' II I ' l l II II II II I I II , 1'1 II II ,, I , I I 1'1 I , r I t II It II I I II II II II II II II 11'1 ~; rl-'-' - l l i " " ' T ' T T r II I t l l L L '- " I , I I I I I I I I I II II I r II I I II I I IE r I I I I I I I I ~ I I I I I I I I I r : I I t I I I I I I II II II II i I II I I II II I" r II II 'I I I II II I: II I'll II II 11,1 I' 1'1 II II I I II II II I. I " J.J-I J J.1 J..L I.. I..l.. LLLI _ I-l-lJ J.1.J J. J. 1...1.. !..l..!..-'-' _ IJ ...J -I ... ~ J. J..':" L 11 Prep Stab On Grade I 11'1 I ) t V'II,IL;:I~IUU'IU r.U"'d" III I I I ~ : I I II I t i l ' t II 11 II II I I I! II I I II 'I I I I 11 I I t II II I I II II I' II I I I I II I I I I I 1'1 I II II I I II I r r I II II I ! I I II II I I I J I I II II II II II -I -I..J..J -l.J. ... .:. '-.&- L. :..1_1-1 _ 1-l-l-l-l.:...J ... .l. 1.. 1. L. L. 1-1_ 1_ 1-I ...l":..J .J..J.':' ~ I' II l l It I t I IV'r..' I r 11" ~~ II II 1 I ~pnaHr-CNIrty SecurilyFencing & Gate Operators I! II I I Site Ughting II II t 1 I:: I! \Nater Systems (Potable & Fire) II II I , I I ~ I I 1_:_;, ~ ~ ~ ~ ~ ~ ~ ~ ~~~: _ :~ _:~ ~ ~ ~ ~ ~ ~ ~ ~ ~:_ :-: _ :~~~ ~ ~ ~ , II II ~'"IC""1.x;"-":;1 r'tJI''':;I <ll.vIlU""U'<;;~ r I II II I ,:, I I I I +~ ~ ~ ~ ~:_:_: _:-: _:~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~: _:_:_: 'I I~ I II r t I 11 I : : I II II I , It: I II I I II I I I II I, I II I 1 II r I I It I I II II:; 'I I I II IVIt;r- VVdll III1I1VUI I I , 1'1 r 1/ L L'_U_'_' _' _' -'..!. ..! 11 L LL L'_'_' I II II I I II I I II II II II I I 1111 II r 1111 II '- '- '- '-' -' -' -11'";7 it r '- '- '- '- ' -' - 1111 j i i'(' I II " II II II II I' II II" I I I II I I II II (t II I:r~"tU I I II w:- : : : : : - - - - : ;- ;- ;- : - ,- , - ; -: - I : i SecurityCeilings I! I: II II Frarre & Hang I II I I 1 1 I"\VUItl 'Y III:>UldliUJI I! I I I I II tit 11 I t I t -:~ ~ ~ ~ f t L ~ ~ ;-:- :- : - :- : -: -: ~ J ~ +f } } ~ ~:_ :_:_:_:_:_;_:~ ~ II E>derior Coatings I .- Progress bar iiiii Critical bar - Sunmarybar o Start nilestone point <> Finish nilestone point II I I I I I I I I II ~ I II I I 'I I I I I I I I I II II II I I II II I II II I I II 1 I II t I I I I I II I I I I I I II II I I I II II I t lilt I I II I I I II II I II II II II I I r Itt II " I t I I II II II II II II 1111 I I I I II II II II II 1 It ,, 11 I I I I I I II I I II I I J II II I I I I II I ' l l , I I I I I 1 1 / 1 II I I , I II II II II" II I I I : I I 11 " II II " II 11'1 1'1' II II II II II II II I til I I II 1 til II 11'1 I J II II I I II 1 I I' II II II II II II I I II II II II II II I I I I II " 1111 I II II II II I II I I II" " l l II II II t til I I II " IiiiiiI Early bar _ Aagler County Aorida Expansion ofthe Inmate Facility Master Project Schedule January 29, 2015 Prog ress bar IiiiiiiiiiiI Critical bar _ Surrmarybar <> <> Finish niles!on. point Start rrilestone ~int Expansion of the Flagler County Inmate Facility Bunnell, FL Attachment 4 Project Funding Schedule ATTACHMENT 4 - PROJECT FUNDING SCHEDULE January 29,2015 Project funding schedule is pending issuance of formal subcontract agreements upon Owner's approval of this GMP. Month Payment Application Due Date (By) Payment Due Date Projected Value 2015 Feb-15 2/28/2015 3/10/2015 Pending Mar-15 3/30/2015 4/10/2015 Pending Apr-15 4/30/2015 5/10/2015 Pending May-15 5/30/2015 6/912015 Pending Jun-15 6/30/2015 7/10/2015 Pending Jul-15 7/30/2015 8/10/2015 Pending Aug-15 8/30/2015 9/10/2015 Pending Sep-15 9/30/2015 10/10/2015 Pending Oct-15 10/30/2015 11/10/2015 Pending Nov-15 11/30/2015 12/10/2015 Pending Dec-15 12/30/2015 1110/2016 Pending Jan-16 1/30/2016 2/10/2016 Pending Feb-16 2/28/2016 3/10/2016 Pending Mar-16 3/30/2016 4/10/2016 Pending Apr-16 4/30/2016 5/10/2016 Pending May-16 5/30/2016 6/10/2016 Pending Jun-16 6/30/2016 7/10/2016 Pending Jul-16 7/30/2016 8/10/2016 Pending Aug-16 8/30/2016 9/10/2016 Pending 2016 Allstate Construction, Inc. page 1 of 1 ATTACHMENT NO.2 OWNER'S PROJECT BUDGET SUMMARY January 3D, 2015 EXPANSION OF FLAGLER COUNTY INMATE FACILITY OWNER PROJECT BUDGET BREAKDOWN SUMMARY A. Permits Allowance $80,000.00 B. Utility Fee Allowance - FP&L and City of Bunnell $300,000.00 C. Furniture, Fixture & Equipment Allowance (FFE) $170,000.00 D. Pending Additional Project Scope Alternates (Allowances) 1. Mezzanine Fencing System $185,000.00 2. Classroom/Storage Room Addition(s)-Design/Build $435,000.00 3. Inmate Facility Signage Program $50,000.00 4. Lightning Protection System(s) $130,000.00 $800,000.00 E. Owner Contingency (1 % Initial Construction Cost) $150,000.00 TOTAL: $1,500,000.00 January 30, 2015 IMATE FACILITY EXPANSION FFE SUMMARY Restraint Chair Self Contained Breathing Apparatus Mattress with Pillow Mattress Cover (per dozen) Sheets (per dozen) Blankets (per dozen) Towels (per bundle) Washcloths (per dozen) Shower Curtain Laundry Carts Gloves Chairs Garbage Carts Mop Buckets Garbage Cans/Lids Inmate Uniforms Handcuffs Leg Irons Waist Chains Laundry Detergent Bleach Disinfectant Glass Cleaner Exam Table Lab Chair Dental Chair Medical Cart Medical Refrigerator Desk (under control room) Secure Medical Cabinet Automated External Defibrillator COST $2,100.00 $2,669.00 $90.00 $90.00 $45.00 $96.00 $20.00 $4.00 $19.00 $305.00 Various $400.00 $500.00 $80.00 Various $20.00 $25.00 $50.00 $80.00 $275.00 $100.00 $93.00 $48.00 $5,000.00 $800.00 $3,500.00 $3,800.00 $200.00 $1,000.00 $500.00 $999.00 MOVE IN $2,100.00 $13,345.00 $15,750.00 $180.00 $900.00 $1,920.00 $400.00 $80.00 $380.00 $1,830.00 $3,000.00 $1,600.00 $3,000.00 $1,200.00 $1,420.00 $25,000.00 $3,125.00 $7,500.00 $12,000.00 $2,000.00 $3,000.00 $465.00 $48.00 $5,000.00 $800.00 $0.00 $0.00 $200.00 $1,000.00 $500.00 $1,998.00 AT CAPACITY* $0.00 $0.00 $10,800.00 $1,170.00 $990.00 $2,112.00 $440.00 $88.00 $0.00 $0.00 $2,000.00 $0.00 $0.00 $0.00 $0.00 $8,950.00 $1,875.00 $2,500.00 $4,000.00 $1,485.00 $7,000.00 $465.00 $48.00 $0.00 $0.00 $3,500.00 $3,800.00 $0.00 $0.00 $0.00 $0.00 Telephone Equipment $56,700.00 $56,700.00 $0.00 Contingency $3,559.00 $3,777.00 TOTAL $170,000.00 $55,000.00* ITEM *WILL PURCHASE ADDITIONAL FFE LATER IF FUNDING EXISTS
© Copyright 2024