Sierra/Lundy Intersection Update April 2015 Work Hours Extending until 10 p.m. WHAT TO EXPECT: The Sierra/Lundy WHEN: Beginning in the second week of Crews have installed metal sheets for support, and have begun excavating a trench in the middle of the intersection. WHERE: Construction activities will continue intersection was closed for construction in January. Starting in April, some work activities will be extended to the hours between 7 p.m. and 10 p.m. During these hours, crews will install rebar and pour concrete, as well as other approved activities. Construction lighting will be directed away from homes and noise levels will be monitored. The extended hours have been approved by the City of San Jose. April, 2015 for approximately seven months until fall 2015. to take place on fully-closed portions of Sierra Road and Lundy Avenue as well as in nearby portions of the BART corridor. Access to residential roads will remain open. TRAFFIC DETOURS: Following the closure, we have successfully rerouted traffic to cause a minimal impact to nearby residential neighborhoods. The main detour route is along Flickinger Avenue. VTA Bus Line 77 also continues to run along Flickinger between Berryessa Road and Hostetter Road. CONTACT: If you have any questions, please contact the Communications and Community Outreach Office at (408) 934-2662. For additional details, please visit us at www.vta.org/bart, @bartsv or facebook.com/bartsv or subscribe at vta.org/bart/subscribe. An excavator digs the Sierra/Lundy BART trench. VTA’s BART Silicon Valley Extension VTA’s Bay Area Rapid Transit (BART) Silicon Valley Extension is a 16-mile extension of the existing BART system to San Jose, Milpitas and Santa Clara, which will be delivered through a phased approach. The first phase, the Berryessa Extension, is a 10-mile, two-station extension, beginning in Fremont south of the future BART Warm Springs Station and proceeding in the former Union Pacific Railroad right-of-way through Milpitas, the location of the first station, and then to the Berryessa area of north San Jose, at the second station. VTA continues project development activities for the second 6-mile phase of the project that includes a 5.1 mile-long subway tunnel through downtown San Jose, ending at grade in Santa Clara near the Caltrain Station. Construction on the second phase of the project will commence as additional funding is secured. 1503-0058 Informe de abril de 2015 sobre la Intersección de Sierra/Lundy El horario de la obra se extiende hasta las 10 p.m. LO QUE SE PUEDE ESPERAR: La Intersección de Sierra/Lundy se cerró en enero para obras de construcción. Las cuadrillas han instalado placas metálicas de soporte y han empezado a excavar una zanja en medio de la intersección. A partir de abril, algunas de las actividades de la obra se extenderán durante las horas de 7 p.m. a 10 p.m. Durante estas horas, las cuadrillas instalarán acero de refuerzo y vaciarán concreto, y también realizarán otras actividades aprobadas. Las luces de la construcción iluminarán en dirección opuesta a los hogares y los niveles de ruido serán monitoreados. Los horarios extendidos han sido aprobados por la Ciudad de San José. CUÁNDO: Desde la segunda semana de abril de 2015 hasta el otoño de 2015, por un periodo aproximado de siete meses. DÓNDE: Las obras de construcción continuarán realizándose en segmentos completamente cerrados de Sierra Road y Lundy Avenue, así como en segmentos cercanos del corredor del BART. El acceso a las calles residenciales se mantendrá abierto. DESVIACIONES DEL TRÁNSITO: Hemos desviado con éxito el tránsito después del cierre para causar un impacto mínimo a las comunidades residenciales cercanas. La ruta de desviación primaria es por Flickinger Avenue. La línea de autobuses 77 de VTA también continúa su recorrido a lo largo de Flickinger entre Berryessa Road y Hostetter Road. CONTACTO: Si tiene alguna pregunta, favor de llamar a la Oficina de Comunicaciones y Extensión a la Comunidad al, (408) 934-2662. Si desea detalles adicionales, por favor visítenos en www.vta.org/bart, @bartsv o facebook.com/bartsv o suscríbase en vta.org/bart/subscribe.
© Copyright 2024