Guidance material for ORO.FTL.110

EASA Flight Time Limitations (FTL)
Guidance material for ORO.FTL.110
CAP 1267
Published by the Civil Aviation Authority, 2015
You can copy and use this text but please ensure you always use the most up to date version and use it in context so as not to be
misleading, and credit the CAA.
CAP 1267
Guidance material for ORO.FTL.110
Guidance material for ORO.FTL.110
Operator responsibilities
This document contains guidance on ORO.FTL.110 requirements, to help operators
develop their own methods and processes to actively manage and show oversight of their
identified fatigue risks.
It should be used in a proportionate way depending on the size and complexity of the
operator and their operational context.
Compliance only with the prescriptive and numerical limits within an operator’s scheme
does not meet the operators responsibilities required under ORO.FTL.110. This document
will give examples of elements that could be used to demonstrate compliance with the
implementing rule requirements. Operators may wish to develop alternative methods that
may be more suitable to their operation and risks.
Operators must develop a change management plan (required under their Safety
Management System) to assess the risks associated with the change to the new
regulations from current practices, as well as show how they will manage specific fatigue
risks.
Along with the requirements of the regulations, operators will need to consider other
industrial, social or contractual aspects of their operation; including tracking any changes
to these areas if they are used as mitigations or controls for fatigue related risks.
While there are a number of suggested metrics listed at the end of this document, they
only relate to core fatigue areas and are not numerical values. The methods and safety
performance indicators that the operator chooses to use will enable them to demonstrate
how they manage fatigue risks internally. The measures may include developing additional
planning and day of operation requirements, all measures should be reviewed and
adjusted as necessary.
Operators may want to make use of the tools and techniques outlined in the ICAO Fatigue
Risk Management System manual, which is a good source of information for developing
assessment and assurance processes. IATA has also produced guidance for developing
fatigue safety performance indicators, including developing roster metrics, which provides
a useful source of practical information for operators to demonstrate they are meeting the
requirements of ORO.FTL.110.
Version 1 - January 2015
www.caa.co.uk/FTL Page 1
CAP 1267
Guidance material for ORO.FTL.110
Specifics for ORO.FTL.110(a)
Principles

Crew need to know rostered duties, rest and recovery periods in advance in
order to plan the use of their rest periods (AMC1 ORO.FTL.110(a))

Changes to rostered duties can cause difficulties for crew to efficiently plan and
use their rest periods, especially where the change is given with little notice of
the new duty
Considerations

Develop roster publication dates that are made available to crew members on
an annual basis

Develop a method to manage changes to the assigned duties so that the extent
of the disruption reduces closer to the day of operation.

Develop roster disruption metrics that could include:
a)
b)
c)
Version 1 - January 2015
Effect of changes to:

Sleeping patterns

Sleep quality

Sleep duration
Higher impact on fatigue through:

Short notification

Time of day of notification
Notification method:

Active communication (e.g. direct phone call)

Passive communication(e.g. text message or email)
www.caa.co.uk/FTL Page 2
CAP 1267
Guidance material for ORO.FTL.110

Develop a planned minimum notification period for extended recovery rest
periods and days free of duty. For example:
a)
Roster publication 14 days in advance (AMC1 ORO.FTL.110(a))
b)
Lower number if justified and mitigated
c)
Consideration for the management of changes after the roster has been
issued

Develop protections around extended recovery rest periods allocated in a
published roster. Changes made with the crew member’s agreement unless
there are factors beyond the operator’s control (such as down route tech issues,
volcanic ash clouds, disruption during the Flying Duty Period etc).

Establish roster stability metrics to demonstrate the level and management of
disruption that rosters are subject to after being issued.

Develop a method/metric to show the relationship between disruption and
standby usage to assess the impact of disruption.

Method to track additional overtime on days off.
Specifics for ORO.FTL.110(b)(d)(e)(f)(g)
These responsibilities support the management of safety risks that could affect an
operation, such as fatigue. The operator’s management system requires hazard
identification, risk assessment and mitigation, and performance monitoring and
measurement (in accordance with ORO.GEN.200(a)(3)). In order to meet the ‘operator
responsibilities’ the operator needs to consider how they will demonstrate the
independence of their selected processes from their normal FTL compliance operational
processes and show that they are effective.
Principles

Manage fatigue related risks under Safety Management System (SMS).

The safety manager/safety department is responsible for facilitating the
management and assessment of the operator responsibilities processes. If
these processes are delegated to other departments, the oversight and
integration of the information gathered within the SMS should remain the
responsibility of the safety manager/safety department.
Version 1 - January 2015
www.caa.co.uk/FTL Page 3
CAP 1267
Guidance material for ORO.FTL.110

Where applicable this responsibility could be allocated to the Fatigue Risk
Management (FRM) team.

FRM is an integrated part of the SMS.

Demonstrate the independence of the process as well as the effectiveness of
the assessment through safety/FRM manager.

Timely capture of fatigue safety related trends and closure of action items/audit
findings.

Demonstrate understanding of how fatigue could affect a crew member’s
alertness and performance, how fatigue does or could occur within the working
environment and the need to manage it effectively for continued safe operation.
Considerations:

Develop a method to track crew member fatigue as a safety performance
indicator

Create a change management plan (under SMS) to assess the risks associated
with the new regulations, and show how they will manage specifically identified
fatigue risks.

Develop a method to advise crew of their responsibilities under
CAT.GEN.MPA.100 and ORO.FTL.115.

Fatigue reports may be trended against route, pattern and individual as part of
the operator’s SMS reporting processes (or under FRM if applicable).

Use a method to proactively and reactively review how the roster is developed
so that the links between duties (frequency and pattern) and associated rest
periods support the crew member to achieve adequate rest.

Develop training in fatigue awareness and mitigation to support crew and roster
staff so that they are aware of what could affect their ability to rest for their
duties.

Develop a link into the continuous improvement and ongoing assurance
processes of the SMS (or FRM if applicable) to review possible areas of
complacency around fatigue risk such as repetitive schedules or certain
operations.
Version 1 - January 2015
www.caa.co.uk/FTL Page 4
CAP 1267
Guidance material for ORO.FTL.110
•

Create internal rules that reflect fatigue management principles and refine them
on an ongoing process using data and feedback. Wherever a fatigue mitigation
is achieved (e.g. through industrial agreement or working time regulations)
these should be reflected as controls or barriers that support the application of
the prescriptive limitations that produce the overall fatigue management of the
operation. If an operator wishes to develop an Individual Flight Time
Specification Scheme (IFTSS) or Alternative Means of Compliance (AltMoC)
they are required to consider these elements as part of the documentation they
present to the competent authority.

Develop processes to capture information on fatigue related issues associated
with the crew member and use procedures to assess the roster related
influences to reduce or mitigate them.

Develop a method that considers fatigue related issues when assessing the
potential risks of the flight or series of flights. The method needs to take into
account that fatigue risks could increase or decrease depending on other
factors (such as training, weather, aerodrome categorisation, crew experience,
etc). This needs to be done early in the flight planning/network scheduling
process. This is an ongoing process and information collected should be
regularly reviewed. As a minimum this should be done on a seasonal basis. In
order for this information to be understood by commercial staff when making
commercial decisions, appropriate training is recommended as they are seen as
“concerned management personnel” (cross-reference ORO.FTL.250).

Develop a method to gather different sources of data, so that fatigue can be
tracked and assessed for trends against fleet, base, route, season or individual.

Use a method that shows sufficient time has been allowed within the pre-flight
reporting period so that all safety related ground duties can be completed. The
operator should consider conducting a risk analysis of the tasks required at
each base and for each aircraft type, taking into account the local conditions.
(cross-reference - ORO.FTL.205(a)(1) Flight Duty Period)
Possible processes for gathering information:
a)
Specific non-punitive fatigue reporting process under their existing safety
reporting procedures.
b)
Roster performance indicators using metrics developed from their roster
data.
These sources of data should inform fatigue management decisions. Operators may want
to gather stakeholder information on roster induced fatigue; for example, through
additional questions as part of regular safety surveys or setting up a stakeholder review
group that assesses the roster data.
Version 1 - January 2015
www.caa.co.uk/FTL Page 5
CAP 1267
Guidance material for ORO.FTL.110
Think about providing feedback to all the relevant operational areas (e.g. rostering,
commercial, crew members, and senior management) on the data gathered and any
associated changes or mitigations that have been introduced.
Where operators have automated systems, these principles should be encoded into the
system. Elements that influence the management of crew fatigue (regulations,
responsibilities, social, and industrial) within an operation should be considered in related
safety cases.
Metrics and demonstrable measures of fatigue management
When developing roster related metrics, planning and day of operation guidelines,
operators should at a minimum take into account the following issues and develop a gap
analysis process to question the relevance to their operation.
It may not be necessary for an operator to use all their agreed metrics all the time; they
should have a review process in place to ensure that the data is being used effectively to
monitor fatigue. While specific route issues must be addressed, when developing their
metrics the operator must consider and demonstrate the different characteristics due to
base, type, rank, and experience or contract type.

Think about the impact of operating long haul, short haul or mixed operations on
a crew members ability to recover from duties and be adequately rested for
subsequent rostered duties. Attention should be given to the impact of the
Window of Circadian Low (WOCL) and of circadian disruption created by
crossing multiple time zones, especially where duties are rostered in the same
block of work. Operators need to appreciate the impact of operating scheduled,
charter or ad-hoc FDP’s on the crew-members’ ability to plan and achieve
adequate rest for their flying duty periods.

Demonstrate how the impact of transient and cumulative fatigue has been
considered, including the impacts associated with combining duties and
allocated extended recovery rest periods. Transitions between early/late and
night duties can have a significant effect on fatigue and the sustainability of the
roster. Transitions should be assessed and managed in relation to their impact
on subsequent Flying Duty Period’s (FDP). Operators should manage crew
leave allocation to prevent cumulative fatigue (for example, spread throughout
the year and given in blocks of seven days or more).
Version 1 - January 2015
www.caa.co.uk/FTL Page 6
CAP 1267
Guidance material for ORO.FTL.110

Allocation of recovery rest is particularly important and the effectiveness of
single days free of duty should be monitored and managed. Balancing the
distribution of workload should be a simple and effective metric, especially at
busy times of the year, so that one crew member is not being worked
significantly more than another. Where the operation is task intensive, a useful
metric would be limiting the number of duty periods between weekly rest
periods. This will assist in managing the cumulative fatigue built up during the
working block.

Where the planned FDP is routinely being exceeded because of operational
issues on the route, airports or weather, the operator needs to develop a replanning process in the short term. The operator should demonstrate how they
have addressed the operational issues or re-crewed the FDP on a seasonal
basis.

The operator should be able to show how they have assessed the rest periods
allocated to the crew members showing that they allow for a minimum eight
hour sleep opportunity. Consideration should also be given to circadian
disruption and whether the eight hour sleep opportunity is during the day or
overnight. This may include an assessment of the local conditions at each
designated reporting point, including the planning of minimum rest periods
within blocks of duties, so that the crew member is sufficiently rested by the
start of the following flight duty period.

Operators should think about rostering additional time within the rest period as a
buffer, where it is likely that delays will occur, in order to stabilise the work
block. This may be a seasonal issue or specific to the individual rostered FDPs.

Recognise the different physical and cognitive fatigue effects associated within
the crew member’s duties on the aircraft. This may require an operator
developing different levels of assessment and mitigation for flight crew and
cabin crew.

Develop a method to assess the rest periods within trip patterns, taking into
account the crew members WOCL and any time zone crossing during the trip.
The location and suitability of the accommodation provided down route needs to
be taken into account, so that the crew member can report for a FDP
adequately rested. This may require the operator to develop mitigations to
extend the rest period or minimise the length of or number of sectors post a
down route rest period.

Operators should be able to demonstrate their method of calculation for crew
member establishment planning and standby requirements as well as the
validity of these calculations in actual operation.
Version 1 - January 2015
www.caa.co.uk/FTL Page 7
CAP 1267
Guidance material for ORO.FTL.110

Roster stability metrics are a key measure in understanding how fatigue is
managed within an operation. Historical data on roster and route disruption
should be used as well as an assessment of the use of commander’s discretion
and fatigued absence. Operators can develop planning buffers to protect the
stability and integrity of the operation as part of their fatigue management
processes.

While commuting/travelling time is the crew member’s responsibility, operators
should be aware and acknowledge its potential impact on their operation. Some
airport locations are likely to increase the commuting time even where the crew
member rests within 90 minutes of their place of report. Operators should
consider what they can reasonably do to meet their responsibilities where they
know or believe the crew member will be too fatigued to operate safely; and
where necessary establish protocols to meet these responsibilities.
Example of some roster metrics

Duty length

Duty placement

Night duties

Deep early starts

Consecutive day sector count

Transitions between late/early and early/late duties

Multi-sector FDPs

Circadian parity in report

Combined short and long haul flying in a working block

Combinations of duties crossing time zones

Combinations duties with east/west time zone crossings

Rest length

Rest placement in relation to WOCL

Recovery days off

Roster disruption/stability

Standby usage

Planned vs. actual
Version 1 - January 2015
www.caa.co.uk/FTL Page 8
CAP 1267
Guidance material for ORO.FTL.110
Further to assessing the individual FDP the operator should consider developing additional
processes that demonstrate assessment of:

Schedule regularity – (seasonal norms)

Turnaround times – applicability to aerodrome and time of day

Related tasks required during the turnaround

Nutrition management during the FDP

Security issues around the aerodrome

Re-planning/re-crewing long term.
The operator may also want to develop a hazard log/risk register (or include in the SMS’s
overall register) to aid the development of their roster metrics and mitigations and to show
that the relative risks have been assessed. A simple approach would be to list the fatigue
hazards against their type of operation, bases and fleets.
Below is an example of a simple table to identify operational specific fatigue hazards:
Fleet 757/767 – Charter operations
Bases
Fatigue hazard
LTN
LGW
MAN
EDI
Night duties
X
X
X
Early starts/late finishes
X
X
X
X
Alternating early/late duties
X
X
X
X
Multi-sector ops (more than
2)
X
X
Combining training and flying
in a single duty period
X
Time zone crossings
X
Eastward westward
X
Back to back operations
X
X
X
Etc.
Operators may want to review the EASA NPA 2010-14 Hazard & Mitigation Table to
support the identification of hazards and possible mitigations which can be found at
www.caa.co.uk/FTL
Version 1 - January 2015
www.caa.co.uk/FTL Page 9